1500立方米水箱制作安装作业指导书(中英对照)

更新时间:2023-06-20 05:32:05 阅读: 评论:0

1500m³水箱制作安装
1500m³  water tank fabrication and installation
施工作业指导书
CONSTRUCTION OPERATION INSTRUCTION
20158
1.工程概况Project overview
1.1概述:本项工程属于水工专业设计图纸范围,属海水淡化车间设备;共制作安装两台水箱,每台水箱设计容积1500m³。
Overview  water tank belongs to the scope of piping works specialty design drawing.
1.2工程范围:2台水箱的生产制造、内部防腐、外壁防腐工作;水箱本体及本体平台扶梯、人孔门等附件制作安装。
重庆市区景点
Project scope: fabrication of 2 t of water tanks, inner anti-corrosion, outer wall anti-corrosion. Fabrication of  water tank body and platform stairca of water tank body. Fabrication and installation of some accessories such as manhole, etc.
1.3工程特点:2台水箱总重量约216吨,以钢板、角钢等原材料形式供货至现场,现场组合量大,安装场地小,不便于过多存放设备物件。为此在施工作业中尽量采用流水线作业,根据实际安装进度要求合理组织生产,尽量减轻组合场用地压力。
Project features: the total weight of 2 ts of water tank is 216 ton. The 2 ts of water tanks will be asmbled with some materials such as steel plate, angle steel which will be delivered to the site. the asmbly place is too small to satisfy the asmbly working volume, so that it cannot store too much equipment parts. During execution, to the great extent, u asmbly line to execute. Organize production rationally according to the actual installation progress to relieve the working pressure of asmbly area mostly.
2.依据的图纸、文件及标准related drawing, document and criteria
2.1. 设计院提供的的水箱安装图纸;water tank installation drawing provided by design institution
2.2. DL/T5210.8-2009 《电力建设施工质量验收及评价规程》(加工配制篇);《execution quality and evaluation rules of power construction(fabrication and asmbly piece)
2.3. 《火力发电厂焊接技术规程》DL/T869-2004;《thermal power plant welding technique regulationDL/T869-2004
2.4. 《电力建设安全工作规程》DL5009.1-2002;《power construction safety working regulationDL5009.1-2002
3.作业准备和条件要求preparation for construction and requirements of conditions
3.1. 作业人员construction staff
3.1.1. 施工前作业人员必须接受技术交底;construction staff must accept technique disclosure before execution.
3.1.2. 作业人员要进行三级安全考试,并且体检合格;construction staff shall get through 3-grade safety test and physical examination.
3.1.3. 特种作业人员要持证上岗;special worker should be working with their special work certificate.
3.2 作业机械准备preparation for construction machinery
烛之武退秦师原文胡三省学做麻辣烫
机具名称
Name of machines and tools
数量
Quantity
机具名称
Name of machines and tools
数量
Quantity
机具名称
Name of machines and tools
数量
Quantity
25T汽车吊
25T truck crane
一辆
氧气
Oxygen
cylinder
6
氧、乙炔割炬
cutting torch of oxygen and acetylene
3
焊接棚
Welding shed
一个
One piece
乙炔瓶
Acetylene
cylinder
3
10T倒链
10T chain block
10
扒杆
mast
10刺血
10
二力平衡实验pieces
磨光机
Abrader
4
肥肠鸡的做法5T倒链
5T chain block
2
钢丝绳辅助设备
steel wire rope
旅游业发展现状auxiliary equipment
一套
A t
钢卷→尺L=50m
2
千斤顶
jack
2
电焊机
Electric welder
6
配电箱
distribution box
2
4.施工工艺流程图Construction technique flow chart
底板Ba plate→顶盖top cover→箱体tank body→筒体附件安装tank cylinder accessory installation→罐整体除锈防腐the whole rust removal→外部油漆防腐anti-corrosive→设备验收inspection→交工project completion
5.主要施工工艺main construction technique
由于设备容积大且整体不能运输,故采用现场组装制作。设备制造安装方式采用倒装法,首先在基础上铺设好底板,底板的连接采用拼接形式,然后在底板上组装顶盖,顶盖为拱形搭接式,顶盖制作完毕后再做箱体,箱体为坡口对焊形式,焊接标准参照《火力发电厂焊接技术规程》DL/T869-2004等标准。Due to the big size of equipment and difficulty of transportation, so as to asmbly the materials in site. fabricate and asmble the equipment reverly. Firstly, put the ba plate on the foundation, condly split joint the ba plate, thirdly split joint the top cover on the ba plate,
顶部焊接成型后内面涂刷石灰水外部涂刷煤油进行煤油渗漏检查,经验收合格后顶盖内部进行防腐,同步外部涂刷油漆;水箱筒体内外防腐均在施工现场内完成。
After welding fabrication of the top,brush lime water inside and brush kerone ouside to execute the leakage test. After inspection, execute inside anti-corrosion of the top cover, in the mean while, paint the outside of the top cover. Inside and outside anti-corrosion of water tank shall be executed within the site.
6.罐体及底板的制造与组装焊接fabrication, asmbly welding of tank body and ba plate.
6.1先根据图纸和材料尺寸,确定块数并进行拼制施工。Decide the quantity of steel plate by drawing and measures of material, then fabricating the materials.
6.2每块在胎具上拼装成型,并按设计要求进行焊接固定。Each part is fabricated in the mould and welded as per the requirements of design institution.
6.3顶板在安装前应先检查包边角钢的椭圆度,并按设计要求进行罐项板的定位点安装,为防止顶中部的下凹,应采用临时支架Check the ovality of wrapped edge angle steel before installing the top plate, and install the locating point of tank top plate according to t
he design. In order to prevent the top plate middle part become from sunken, apply the temporary support.
6.4首先施焊内侧的连续焊缝,然后焊接外侧的连续焊缝。Firstly, weld the inside continuous welding bead, condly weld the outside continuous welding bead.
6.5顶板与包边角钢的环缝,应由几名焊工对称均匀分布,沿同一方向采用分段退焊。Top plate and overlapping angle steel ring welding bead shall be backstep welded along the same direction by veral welders.
6.6底板焊接时不可在水箱基础上直接气焰切割钢板,以防止燃着下面的沥青找平层。It is strictly prohibited to execute torch cutting to the ba plate when welding to prevent the bitumen screed-coat from fire.
6.7拼接底板时需要先焊短焊缝、后焊长焊缝,且长焊缝焊接时需要采用跳焊方式,罐体整体焊接时应先焊接环形焊缝再焊接纵向焊缝。Firstly weld the short welding bead, weld the long welding bead shortly when asmbling the ba plate. In addition, weld long wel
ding bead with spot welding way. Firstly weld the ring welding bead and condly weld the vertical welding bead when welding the whole tank.
7.罐壁板的制造与组装焊接要求fabrication and asmbly welding requirements of tank wall plate

本文发布于:2023-06-20 05:32:05,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/89/1046541.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:焊接   安装   作业   采用   水箱   进行
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图