序号 | 检查项目 | 规定值或 允许偏差 | 检查频率(方法) |
1 | 沟底高程(mm) | 符合设计规定 | 水准仪:每200m测4处 |
2 | 断面尺寸(mm) | 不小于设计 | 尺量,每200m测2处 |
3 | 边坡坡度 | 不陡于设计 | 尺量,每200m测2处 |
4 | 边棱直顺度(mm) | 假面之王韩剧±10 | 尺量,20m拉线,每200m测2处 |
Chainage | circulate vt. & vi. 循环;流传 | fal adj. 错误的;假的Inspection date | bachelor n. 获学士学位的人;未婚男子 | |||||||
Work Title | ||||||||||
独立的Item | Controlling content of releasing holding point | as a result 结果Inspection comments | ||||||||
Yes | No | |||||||||
1 | △infect vt. 传染;感染Whether the material type and characteristic are correct or not? | |||||||||
2 | Whether the 土沟 level and size are correct or not? | |||||||||
3 | Whether the W-Beam Guardrail bury depth meets the design requirement or not?护坡平台整平无杂物 | |||||||||
4 | Whether the tolerance of uprights verticality degree meets the relevant codes or not?土沟排水畅通? | |||||||||
5 | Whether the W-Beam Guardrail is installed firmly without obvious collap edge, deformation, cracking and other defects? 急流槽与土沟,护坡平台与急流槽是否顺接? | |||||||||
Rectification requirement: | ||||||||||
Relea hold point | Not relea hold point | |||||||||
QE | Name: Position: Signature: Date: | QAM | Name: Position: Signature: Date: | |||||||
迎宾曲感动中国 Works title | 事事齐全说汉高Construction Date | |||||||||||||
Chainage and Location | Inspection Date | |||||||||||||
Basic requirements | Item No. | Requested Contents | 孤独之旅教学设计Inspection Comments | |||||||||||
1 | Sub-clau 5.5.1.1 of JTG F80/1-2004 Smoothness, steadiness, stabilization of earth ditch side slope | |||||||||||||
2 | Sub-clau 5.5.1.2 of JTG F80/1-2004 Ditch bottom smoothness, no loo soil and other sundries, drain freely | |||||||||||||
Measured Items | Item No. | Inspection Items | 月全食的过程 Specified Value orAllowable Deviation | Inspection Results (Measured values) | Remarks | |||||||||
1 | Elevation of ditch bottom | +0,-30 | ||||||||||||
2 | ctional dimensions (mm) | Not less than design value | ||||||||||||
3 | side slope gradient | Not steeper than design value | ||||||||||||
4 | Straightness degree of side edges | 50 | ||||||||||||
Inspection Conclusion | ||||||||||||||
QAM Date | Q u a l i t y E n g i n e e r Date | Construction Principal Date | Field Engineer Date | |||||||||||