4岁宝宝
施工组织设计(Construction organization design)Catalog
1 general description of construction organization design 1 General situation of 1.1 project 1抄一篇优秀日记300字
Brief introduction of 1.1.1 engineering project 1
Features of 1.1.2 project 2
Specific features and conditions of 1.1.3 construction site 3 1.1.4 owners and relevant departments require 4
1.2 compilation basis 5
1.2.1 engineering design document 5
1.2.2 site natural conditions 5
Resource conditions in 1.2.3 area 5
2 construction deployment and construction scheme 6
2.1 construction deployment 6
2.1.1 construction organization and task division 6
2.1.2 construction zone 7
2.1.3 overall construction quence arrangement 7
2.1.4 interchange, cast-in-place continuous beam construction quence 8汽车维修管理制度
2.1.5 Construction Schedule 8
2.1.6 construction traffic maintenance 8
2.2 construction scheme 9
2.2.1 bridge construction 9
(five) precast beam cast-in-place wet joint construction 12
2.2.2 subgrade and Pavement Engineering 12
2.2.3 culvert engineering 13
2.2.4 drainage and protection works 13
2.2.5, the busy holidays, the rainy ason construction measures 14
2.2.6 application of new technology, new technology 14
2.3 construction plan Annex (construction process diagram) 15
Construction block diagram of 2.3.1 powder injection pile 15
2.3.2 subgrade filling construction technology block diagram
花车巡游2.3.3 pavement ba construction process diagram ba and ba 15
Construction process block diagram of 2.3.4 K12+883 frame culvert 15
文定皇后2.3.5 stone door, small drainage engineering construction process diagram 15
2.3.6 bridge bored pile construction process block 15
Construction process block diagram of 2.3.7 cast-in-place box girder 15
2.3.8 45m span prefabricated T beam installation construction process diagram 15
3 of the total construction schedule and project schedule plan 15
3.1 total construction schedule 15
3.2 schedule of individual project 16
3.3 guarantee measures for time limit 16
3.4 project investment plan curve 16
4 construction preparation work and resource requirement plan
4.1 construction preparation work 17
4.1.1 organization technical preparation 17
4.1.2 construction site preparation 17
4.1.3 machine tools ready for 17
4.2 resource requirements plan 18
4.2.1 workforce requirements plan 18粹怎么组词
4.2.2 construction material requirement plan 19
4.2.3 spare parts requirement plan 20
4.2.4 construction machinery requirements plan 21
4.2.5 construction saving measures 22
5 general layout of construction 22
5.1 temporary facilities layout 22
5.2 layout of construction pavement 22
5.3 the construction of water and electricity calculation and network layout 22
6 technical measures to ensure quality and safety 23
6.1 measures to ensure quality 23
6.1.1 quality objectives 23
6.1.2 quality assurance system 23
来大姨妈能洗头吗
6.2 construction safety assurance measures 24
6.3 civilized construction and environmental protection, pipeline protection measures 24
6.3.1 environmental protection and civilized construction management system 24
十二生肖谁最厉害
6.3.2 civilized construction measures 25
6.3.3 pipeline protection measures 25
1 general description of construction organization design
General situation of 1.1 project
Brief introduction of 1.1.1 project
First, the overall situation
Guangzhou Southern China South Road two pha project approved by the provincial and municipal government construction project, the project is located in the northeast of Guangzhou