METHOD STATEMENT
Page 1 of 3 BIMAGRIP LS
PREPARATION AND PRIMING OF STEEL SURFACES
See the full Method Statement for Acraprime SP. PROTECTION OF SPECIAL AREAS
未来近义词
a) Works Perimeter, Inspection Ports and Grids
Any areas not already protected prior to the application
of the Acraprime SP primer should now be protected
prior to the application of Bimagrip LS resin.  The
reason for this is the neatness of the anti-slip work and
the protection of areas where access may be required.
The perimeter of the area being treated with the
Bimagrip LS, along with any grids, inspection points
and manholes, should be protected with masking tape.
This tape must be removed within 20 minutes of the
Bimagrip LS being applied.
b) Lashing Points Protection
We recogni that the protection of lashing points is
important so as to keep them functioning freely.  In
order not to allow any of the Bimagrip LS system to
contaminate them they must be protected.  This can be
achieved by the u of suitably designed rubber plugs
or caps, or by masking tape.  The tape and caps should
be removed approximately 20 minutes following application of the aggregate dressing.
c) Application
After the areas requiring protection have been completed and the primed surface is clean, dust free and not damp or wet, the Bimagrip LS resins can be applied.
Important Note
Under no circumstances should Bimagrip LS surfacing
applications be carried out if the substrate is not perfectly dry, dust free or if rain is threatened.  The temperature of the primed surface must be at least 3 degrees Celcius higher than the dew point, and the RH below 85%. MIXING AND APPLICATION OF BIMAGRIP LS
a) Description of Bimagrip LS
Bimagrip LS is a three component system, Pack A, Pack B and Pack C, all supplied in pre-weighed packages.  The three Bimagrip LS materials should be properly mixed and applied as soon as possible after the Acraprime SP has cured to a tack-free finish.
b) Equipment
The esntial equipment required is a slow speed high
torque drill and mixing paddle (Refina Megamixer type),
suitable power source, mixing vesl, rrated squeegees, shovels/scoops and stiff bristled brooms and wheelbarrows. Empty sacks are required to store the recovered excess aggregates.
c) Pot Life
The three blended components of Bimagrip LS react
very rapidly and conquently the mix has a short pot
life of approximately 10 minutes at 20°C.  It is very important that mixing times are not exceeded as over-
mixing will reduce the pot life of Bimagrip LS and therefore, workability time.
d) Mixing Area and Tools
The area and tools ud to prepare the materials for mixing must be protected from pollution or contamination from dust, water, oils, greas, naked flames or excessive temperatures of heat or cold.
好烦的图片If working outside it is advisable to protect the working
area if rain is likely to occur.
Personal protective equipment must be worn in accordance with the Health & safety information provided by R.S. Clare.
Marine Industry
METHOD STATEMENT
Page 2 of 3
e) STEP ONE – Mixing Pack A and Pack B
All of Pack A, the curing agent, and all of Pack B, the resin component, are poured into the mixing vesl and blended together with the drill and paddle.  The two components are to be thoroughly mixed for some 15-20 conds into a smooth consistency.
f) STEP TWO – Mixing Pack C
After the first mixing cycle in Step One, all of the graded
fillers in Pack C are then added slowly to avoid lumps,
书法作品图片硬笔to the blend of Pack A and Pack B, whilst continuing to
mix.
Mixing lasts for a further 30-40 conds after all of Pack
C has been added, until a smooth, lump free blend is
produced.
g) STEP THREE – Applying the Bimagrip Resin
哇哈哈官网T he blended resins are then immediately poured from the mixing vesl onto the prepared and primed surface and spread with a rrated spreader (squeegee) at the specified coverage rate.  The Bimagrip LS is allowed to lf-level.
h) STEP FOUR– Applying the Anti-slip Aggregates
The lected anti-slip aggregate is then generously scattered by hand over the freshly applied Bimagrip LS
resin to excess, ensuring no bare resin is visible through the aggregate dressing.  The process of casting aggregates onto the Bimagrip LS resin is achieved by shovel (spade) and by hand in small confined areas.
i) STEP FIVE – Removal of Excess Aggregates
After a minimum of one hour (at 20o C) has elapd all
the excess aggregate may be swept up, removed and correctly stored.  U stiff brushes or a mechanical sweeping machine to ensure efficient removal.  Such sweeping operations must be carried out vigorously to ensure full removal occurs.
Provided the aggregates have not become contaminated in any way they may be re-ud.
Contamination includes dust, water, oils, greas, wood, paper, etc. j) STEP SIX – Top Coating考研一般多少分过线
For ea of cleaning and consolidation of the aggregates we recommend the application of a coating of either an epoxy or polyurethane paint (in the colours to match the general décor of the vesl).
There is no loss of surface profile or anti slip properties as long as the coatings are correctly applied.
For PCTC’s such a coating must be applied in accordance with the following specification:
As soon as is logistically possible following application and curing of the Bimagrip surfacing all excess aggregates must be thoroughly and vigorously swept up and removed.  Such sweeping operations should be carried out 2-3 times.  The u of a small mechanical sweeper for the initial pass is beneficial.
小猫咪简笔画可爱Immediately prior to applying the coating the Bimagrip surface should be blown clean with compresd air to ensure the thorough removal of any remaining dust and deleterious matter.
An application of the lected coating should then be made at a minimum dft of 250 microns.
Immediately prior to handover of the vesl a cond application of a minimum100 microns dft should be made. FAILURE TO CARRY OUT THE SWEEPING AND COATING PROCEDURES CORRECTLY WILL RESULT IN THE DISLODGING OF AGGREGATE PARTICLES DURING INITIAL LOADING AND UNLOADING OPERATIONS.
ON PCTC’S THIS CAN HAVE SERIOUS IMPLICATIONS.
挟制
k) STEP SEVEN – Opening to Traffic
At an ambient temperature of 20°C the site can be re-
opened to trafficking two hours following application.
At 5°C the open to traffic time extends to four hours.
BIMAGRIP LS Marine Industry
METHOD STATEMENT
6月3日什么星座Page 3 of 3
OTHER INFORMATION
a) Gradients
Where the area to be treated is on an incline, the
application of the aggregate dressing must be delayed
to prevent surface rippling.  Plea contact RS Clare’s
Technical Department for advice.
b) Storage
All materials should be stored in a cure place free
from contamination and pollution from dust, water and
spillage of hydrocarbon fuels.  Protection from
extremes of temperatures is advisable.
c) Disposal of Containers
See the Health & Safety Information.

本文发布于:2023-06-18 10:06:29,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/89/1043853.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

下一篇:Introduction
标签:硬笔   考研   简笔画   图片   分过
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图