HAZARD IDENTIFICATION AND RISK ASSESSMENT FLOW 27Review the controls with tho
persons with responsibilities for the process.
2d网络游戏Review each hazard and identify the additional
controls (if required) to prevent or minimi the
risk identified. Record details on the Risk
Asssment Record
Produce and approve Method
Statements (if applicable)
Open a Risk AsssmentRecord
b) Task / Operations / Area
不同的英语c) Name of person undertaking
the asssment
d) Date of the asssment Where risks or hazards are identified establish
the category bad on Appendix A (next
flowchart)
云南腾冲旅游攻略
Record the Risk Rating of the hazard on the
消防员英雄
Risk Asssment Record
Issue RAMS to tho persons involved in the
process and provide training provided as
required
Enter the Method Statement
references on the Risk Asssment Record早操活动目标
File the Risk Asssment records in the Risk
Asssment folder on the shared drive
JHE Ltd Purpo To define the methods of identifying hazards in the work place and on site plus the methods of asssing the associated risks in tho areas.小幽默大智慧
Scope This is applicable to all areas where hazards may be encountered
Responsibilities THE QSHE Manager, Supervisors, Electricians, Labourers, Fitter农业报告>社会主义有点潮
Records Risk Asssment Records; Method Statements
Applicable Legislation Management of Health and Safety at Work Regulations 1999
ISO 18001 : 2007 4.3.1 Hazard Identification, risk asssment and determining controls May 2015Issue No: 1
Audit Findings