设备开箱验收报告
Equipment Open-package Inspection Report
项目号Poject NO: 项目名Poject code:
春天水果编制者Prepared by: 编制时间Date:
目录CONTENTS
感知电流1 开箱记录表I nspection record sheet (2)
2 装箱清单Packing list (4)
梦见旧衣服
3 会议纪要Minutes of meeting .............................................................................
4 附件Attachment ...................................................................................................
This document must be treated as confidential. It shall not be copied, or be distributed to others, or it´s contents be ud or communicated, either in whole or in part, except with written permission. All intellectual property rights are rerved, such as but not limited to grant of a patent, registration of a utility model or of an industrial design.春训心得体会范文
设备开箱验收记录表
Equipment open-package inspection record sheet 编号packing No:
认知度是什么意思Minutes of meeting 会议纪要舜的父亲
湿润的近义词是什么
蔓越莓胶囊