备案号:J11787-2011 DB
塘上行
重庆市工程建设标准
DBJ50-123-2010
重庆市建筑护栏技术规程
Technical specification for Building Guardrail Chongqing
2011-05-01实施
重庆市城乡建设委员会 发布
重庆市工程建设标准
人生理想
重庆市建筑护栏技术规程
Technical specification for Building Guardrail Chongqing
DBJ盒子手工制作50-123-2010
批准部门:重庆城乡建设委员会
施行日期:2011年05月01日
2010年 重 庆
前 言
建筑护栏作为重要的建筑非结构构件,其安全性、耐久性直接影响到人民群众财产和生命的安全,一旦出现质量问题后患无穷。为规范建筑护栏的设计、施工、检测、验收以及对原材料和产品的要求,消除建筑护栏事故隐患,确保建筑护栏的安全和正常使用,根据重庆市城乡建设委员会《关于下达2006年度建设科研项目计划的通知》(渝建【2006】187号)的要求制定本规程
本规程的主要内容是:总则;术语;基本规定;设计;施工;检查验收;保养和维护。
本规程中武汉东湖绿道3.1.1、3.1.3、4.1.4、4.2.5、4.2.2、4.2.6电磁炉排行榜,以黑体字标示的条文为强制性条文,必须严格执行。
本规程由重庆市城乡建委负责管理,重庆市建设工程质量监督总站负责具体技术内容的解释。在执行过程中,请各单位结合工程实践,认真总结经验,并将意见和建议寄交重庆市渝中区长江一路58号重庆市建设工程质量监督总站(邮编:400014;E-mail:c***************** )
本规程主编单位:重庆市建设工程质量监督总站
本规程参编单位:重庆市设计院
重庆市建筑科学研究院
本规程参加单位:
本规程主要起草人员:周祖怀 邱 峰 李正春 林文修 邓小华 付建华 庄 浩
余 波 赵启林 谷 军 沈治宇 陈 建 朱 宇 颜丙山
王若冰 陈雄武 刘 静 黄 刚 黎 明 刘 影
本规程主要审查人员:
目 次
1 总则 ··························································1
2 形容英雄的成语>豆腐制作方法 术语···························································2
3 基本规定·······················································3
3.1 一般规定 ··················································3
3.2 材料 ······················································3
4 设计···························································4
4.1 一般规定 ··················································4
4.2 建筑设计···················································4
4.3 护栏计算 ··················································5
4.4 护栏构造 ··················································9
4.5 防雷接地 ·················································14
5 施工 ·························································15
5.1 一般规定··················································15
5.2 砌体及混凝土护栏··········································15
5.3 金属类护栏················································16
5.4 玻璃组合护栏··············································16
5.5 木质护栏··················································17
5.云南滑雪场6 防雷接地··················································17
6 检验和验收 ····························································18
6.1 一般规定··················································18
6.2 施工前检验················································18
6.3 施工检验··················································19
6.4 施工后检验················································19
6.5 验收资料核查检验··········································20