白费力气
TITLE/EQUIPMENT 标题/设备: | |
|
PROJECT NO 动静界项目编号: | | DEPARTMENT/AREA 部门/区域: | |
|
INSPECTION DATE 检查时间: | 害怕死亡怎么办 | |
| | | | | 400分能上什么大学
The PSSR team concludes that the installation is consistent with design specifications and that the equipment is safe to start-up after completion of recommendations required before start-up. (Note: If recommendations are not completed as originally intended attach information to explain alternative solution). PSSR小组确认安装符合设计规范且在完成必要的整改后可安全的启动。(注:若不能完成附件要求的整改则需说明另可选择的解决方案)
Approved批准:
劈吊
__________________________ _____________________________
群众评议意见
(Area Coordinator) Date (Maintenance Coordinator) Date
(区域管理者)公务员职业 日期 (维修管理者) 日期
下的笔顺怎么写__________________________ _____________________________
(Safety Coordinator) Date (LMT Member) Date