等的意思
1.适用范围:A-6330A-6350压缩机厂房,挤压造粒厂房室内楼地面。追风舒经活血片
Applicable scope:the ground and floor of A-6330,A-6350 Compressor building and extrusion building.
2.硬化剂材料采用广州西卡建筑材料有限公司的彩色矿物骨料干撒式地面硬化剂
(Sikafloor-3 Quartz Top Colored Mineral Dry Shake Floor Hardener)。
The hardener should be Sikafloor-3 Quartz Top Colored Mineral Dry Shake Floor Hardener of Guangzhou Sika construction material LTD.
3.压缩机厂房室内硬化剂地面基层为20mm水泥砂浆,挤压造粒厂房室内楼地面硬化剂层
的基层为C20细石砼。
The ba cour of hardener on the compressor building floor should be concrete mortar 20mm in thickness and that is C20 fine aggregate concrete on the extrusion building floor.
4.基层施工:按图纸要求进行水泥砂浆与细石砼施工,待表面抹平后,除去表面泌水。The construction of ba cour:the concrete mortar and fine gravel concrete should be poured in accordance with the drawing and remove the surface water after finishing is completed.
5.硬化剂层面层施工:当基层表面找平,除去表面泌水、初凝后进行。
The construction of hardener ba cour:this work should be executed after the ba cour surface is leveled and the water is removed and the concrete is initial t.
5.1散布材料:按5KG/m2的用量将硬化剂材料手工均匀撒布在初凝的砼或砂浆表面,分两次完成撒布作业。
单杠引体向上训练方法Dispersing materials: the hardener should be equally disperd twice onto the surface of concrete or mortar by hand with the dosage of 5KG/m2.
5.2机械圆盘作业:待地面硬化剂吸收一定水分,进行专门的镘抹机作业。镘抹机作业应纵横交错进行,将地面硬化剂与砼(砂浆)充分混合。
小白菜炖排骨Mechanical disc work: trowel work should be performed by machine after the hardener has absorbed some water. The trowel work should be carried out vertically
生活中的美作文
加拿大留学签证and horizontally and mix the hardener with concrete completely.
香菇种植5.3表面抹平:镘抹机将地面硬化剂与砼(砂浆)充分混合后,在砼(砂浆)终凝前完成表面的抹平压光工作。微信头像女生卡通
Surface finishing:the work should be completed after the hardener has mix with concrete and before the final t of concrete.
6、养护:抹平压光完成后,及时对地面进行覆盖、浇水等养护工作。
Curing:the curing should be executed after the completion of finishing.