ABS RULES

更新时间:2023-05-29 22:42:24 阅读: 评论:0

RULES FOR BUILDING AND CLASSING
MOBILE OFFSHORE DRILLING UNITS
冰箱怎么调温度2008
CORRIGENDA/EDITORIALS – 19 February 2008
Page No. Paragraph Comments
Part    3 Hull Construction and Equipment
Chapter 1 General
Section 1 Definitions
7 3-1-1/17.5Revi to read “Transit Conditions are all…”.
Part    3 Hull Construction and Equipment
Chapter 1 General形容春雪的优美句子
Section 2 Environmental
Loadings
15 3-1-2/1.11.3Reference “1-1-7/1 of the ABS Rules for Classification of Offshore Units and
Structures (Part 1)” to read “1-1-4/1”.
Part    3 Hull Construction and Equipment
Chapter 1 General
孟姜女的故事Appendix 1 Shallow Water Wave Theory
24 3-1-A1/5For wave period, “12 s” to read “12 c”.
Part    3 Hull Construction and Equipment
Chapter 1 General
Appendix    3 Guide for Material Selection for ABS Grades of High Strength Quenched and Tempered Steel
53 3-1-A3/Table 2In fourth column heading, add “%” after “Elongation”.
Part    3 Hull Construction and Equipment
Arrangements
and
Chapter 2 Hull
Structures
Section    4 Column-Stabilized Drilling Units
92 3-2-4/3.11Reference “1-1-7/1 of the ABS Rules for Classification of Offshore Units and
Structures (Part 1)” to read “1-1-4/1”.
Part    3 Hull Construction and Equipment
Chapter    3 Subdivision and Stability
Section    1 Stability and Watertight/Weathertight Integrity
124 3-3-1/1.3.3In title, 1.3.3(a), and 1.3.3(b), references “4-2-3/3.3” and 4-2-3/17.1” to read
“4-2-4/3.3” and 4-2-3/3.1”.
125 3-3-1/3.3.2Reference “1-1-7/1 of the ABS Rules for Classification of Offshore Units and
Structures (Part 1)” to read “1-1-4/1”.
130 3-3-1/3.11Reference “3-2-3/5.1.7” to read “3-2-3/5.3”.
131 3-3-1/9.1Reference “1-1-7/1 of the ABS Rules for Classification of Offshore Units and
Structures (Part 1)” to read “1-1-4/1”.
132 3-3-1/9.3Reference “1-1-7/1 of the ABS Rules for Classification of Offshore Units and
Structures (Part 1)” to read “1-1-4/1”.
133 3-3-1/11Reference “Appendix 3-3-A3” to read “Appendix 3-3-A2”.
Page No. Paragraph Comments
Part    3 Hull Construction and Equipment
Chapter    3 Subdivision and Stability
Appendix    2 Onboard Computers for Stability Calculations
154 3-3-A2/11.1In cond bullet, reference “3-3-A3/11.5” to read “3-3-A2/11.5”.
155 3-3-A2/11.1In last paragraph, reference “3-3-A3/15” to read “3-3-A2/15”.
Part    4 Machinery and Systems
Chapter    1 Machinery, Equipment and Their Installation
Section 1 General
5 4-1-1/9In first bullet, reference “Section 4-1-3” to read “Section 4-3-6”.
6 4-1-1/13Reference “4-2-3/3.7” to read “4-2-4/3.7”.
Part    4 Machinery and Systems
Chapter    1 Machinery, Equipment and Their Installation
Section    3 Jacking or Other Elevating Systems
9 4-1-3/1In cond-to-last line of first paragraph, reference “3-2-3/5.1.5” to read
“3-2-3/7.1.2”.
Part    4 Machinery and Systems
Chapter    1 Machinery, Equipment and Their Installation
Section    4 Thrusters and Dynamic Positioning Systems
13 4-1-3/1Reference “1-1-3/15 or 1-1-3/17 of the ABS Rules for Classification of
Offshore Units and Structures (Part 1)” to read “1-1-3/27 or 1-1-3/29 of the
ABS Rules for Conditions of Classification – Offshore Units and Structures
(Part 1)”.
Part    4 Machinery and Systems
Chapter    2 Pumps an Piping Systems
Section 1 General
23 4-2-1/9Renumber Subction 4-2-1/9 as 4-2-1/7.
24 4-2-1/9.7
[new 4-2-1/7.7]Reference “1-1-A3/1 of the ABS Rules for Classification of Offshore Unites and Structures (Part 1)” to read “1-1-A2/1 of the ABS Rules for Conditions of Classification – Offshore Unites and Structures (Part 1)”.
24 4-2-1/9.7.2(c)
[new 4-2-1/
7.7.2(c)]
Reference “4-2-1/9.7.3” to read “4-2-1/7.7.3”.
25 4-2-1/9.7.3
[new 4-2-1/
7.7.3]
沙场秋点兵Reference “4-2-1/9.7.2” to read “4-2-1/7.7.2”.
Part    4 Machinery and Systems
Chapter    2 Pumps an Piping Systems
Section    2 Pumps, Pipes, Valves, and Fittings
35 4-2-2/7.5.6i)In cond item i), reference “4-2-2/7.7.9” to read “4-2-2/7.7.7”.
38 4-2-2/7.7.7Reference “4-2-2/7.21” to read “6-1-1/19”.
38 4-2-2/7.9Reference “1-1-A3/5.3, 1-1-A3/5.5 of the ABS Rules for Classification of
Offshore Units and Structures (Part 1)” to read “1-1-A2/5.3, 1-1-A2/5.5 of the
我的同桌是班长ABS Rules for Conditions of Classification – Offshore Units and Structures
(Part 1)”. (3 places)
50 4-2-2/17.1Reference “Section 2-3-1” to read “Section 2-3-1 of the ABS Rules for
Materials and Welding (Part 2)”.
Page No. Paragraph Comments
Part    4 Machinery and Systems
Chapter    2 Pumps an Piping Systems
Section    2 Pumps, Pipes, Valves, and Fittings
50 4-2-2/17.5Reference “Section 2-3-11” to read “Section 2-3-11 of the ABS Rules for
Materials and Welding (Part 2)”.
50 4-2-2/17.5Reference “4-2-1/9.11” to read “4-2-1/7.11”.
50 4-2-2/17.7Reference “Section 2-3-1” to read “Section 2-3-1 of the ABS Rules for
Materials and Welding (Part 2)”.
51 4-2-2/19.3.1In table, “Ca Steel” to read “Cast Steel”.
52 4-2-2/21.3Reference “4-2-1/9.21” to read “4-2-1/7.21”.
53 4-2-2/21.9Reference “4-2-1/9.19” to read “4-2-1/7.19”.
54 4-2-2/23.3Reference “4-2-1/9.21” to read “4-2-1/7.21”.
Part    4 Machinery and Systems
Chapter    2 Pumps an Piping Systems
Section    3 Tank Vents and Overflows
58 4-2-3/1.5Reference “4-2-1/9.21” to read “4-2-1/7.21”.
58 4-2-3/1.9.2Reference “4-2-4/9.5” to read “4-2-5/9.5”.
58 4-2-3/1.9In last ntence before note, reference “4-2-3/15.3” to read “4-2-3/1.3”.
59 4-2-3/3.3.2Reference “4-2-1/9.21” to read “4-2-1/7.21”.
Part    4 Machinery and Systems
Chapter    2 Pumps an Piping Systems
Section    4 Bilge and Ballast Systems and Tanks
61 4-2-4/1.1Reference “4-2-1/9.11” to read “4-2-1/7.11”.
63 4-2-4/5.3Reference “4-2-1/9.21” to read “4-2-1/7.21”.
64 4-2-4/7.3Reference “4-2-3/9.1 or 4-2-3/9.3” to read “4-2-4/9.1 or 4-2-4/9.3”.
66 4-2-4/11.3Reference “4-2-1/9.21” to read “4-2-1/7.21”.
Part    4 Machinery and Systems
Chapter    2 Pumps an Piping Systems
Section    5 Fuel Oil Systems and Tanks
69 4-2-5/1.1.1Reference “4-2-1/9.29.1” to read “4-2-1/7.29.1”.
72 4-2-5/7.3Reference “4-2-1/9.29.1” to read “4-2-1/7.29.1”.
72 4-2-5/7.5Reference “4-2-1/9.21” to read “4-2-1/7.21”.
73 4-2-5/7.9Reference “5-3-1/15)” to read “5-3-1/15i)”.
Page No. Paragraph Comments
Part    4 Machinery and Systems
Chapter    2 Pumps an Piping Systems
Section    6 Other Piping Systems and Tank
76 4-2-6/1.9Reference “4-3-4/3.15” to read “4-3-4/3.13”.
77 4-2-6/3.9Reference “4-2-1/9.25” to read “4-2-1/7.25”.
77 4-2-6/5.1Reference “4-2-6/5.7” to read “6-1-1/21”.
80 4-2-6/7.1.2(b)References “4-1-3/3.3.ii)” and “4-1-3/3.5vii)” to read “4-3-6/3.3.ii)” and
“4-3-6/3.5vii)”.
80 4-2-6/7.1.2(c)Reference “4-2-3/1 through 4-2-3/7” to read “4-2-4/1 through 4-2-4/7”.
80 4-2-6/7.3.2References “4-6-4/7.1.2” and “4-6-4/7.1.3” to read “4-2-6/7.1.2” and “4-2-6/7.1.3”.
82 4-2-6/11.1Reference “4-2-1/9.15” to read “4-2-1/7.15”.
Part    4 Machinery and Systems
Installations
Chapter 3 Electrical
Section 1 General
95 4-3-1/5Reference “4-3-5/3.3” to read “4-3-5/3.1.2”.
96 4-3-1/9References “4-3-4/3.17.1”, “4-3-4/3.19.1” and “4-3-4/3.21.2” to read
“4-3-4/3.15.1”, “4-3-4/3.17.1” and “4-3-4/3.19.2”.
96 4-3-1/12Reference “4-2-6/7.1.2” to read “4-2-6/7.1.3”.
98 4-3-1/19References “4-3-5/1.1.4” and “4-3-4/7.11.6” to read “4-3-5/1.1.3” and
“4-3-4/7.9.6”.七步诗的故事
98 4-3-1/21Delete inadvertently duplicated 4-3-1/21.  (Requirements are now in 6-1-1/27).
Part    4 Machinery and Systems
Installations
Chapter 3 Electrical
Unit
Systems
Section 2 Drilling
105 4-3-2/3.1.6(a)Reference “4-3-4/7.15.2” to read “4-3-4/7.13.2”.
106 4-3-2/3.3.1i)Reference “4-3-4/3.19.2” to read “4-3-4/3.17.2”.
106 4-3-2/3.3.2iii)Reference “4-3-4/3.21.2” to read “4-3-4/3.19.2”.
107 4-3-2/5.1.2Reference “Section 3-4-1” to read “Section 5-1-1”.
112 4-3-2/5.17.2(d)Reference “4-4-1/27” to read “5-3-1/7”.
113 4-3-2/7.1.5Reference “4-3-4/7.17.2” to read “4-3-4/7.15.2”.
120 4-3-2/9.13.1Reference “4-3-4/7.17.2” to read “4-3-4/7.15.2”.
125 4-3-2/15.9.1Reference “4-4-1/27” to read “5-3-1/7”.
127 4-3-2/19.1.1(a)Reference “5-3-1/9” to read “5-3-1/9.1”.
127 4-3-2/19.3Reference “4-2-5/1.1” to read “5-2-5/1.1”.
Part    4 Machinery and Systems
Installations
Chapter 3 Electrical
Section    3 Drilling Unit Installation
135 4-3-3/3.13.2(a)Reference “4-3-4/7.17.2” to read “4-3-4/7.15.2”.
145 4-3-3/7.3.3Reference “4-2-1/9.27” to read “4-2-1/7.27”.
146 4-3-3/9.1.1Reference “4-6-3/11.7” to read “4-3-3/9.7”.
Page No. Paragraph Comments
Part    4 Machinery and Systems
Chapter 3 Electrical
Installations
Section    4 Machinery and Equipment
154 4-3-4/3.3Delete inadvertently duplicated 4-3-4/3.3.  (Requirements are now in 6-1-1/9.)
Renumber subquent Paragraphs of 4-3-4/3 accordingly.
157 4-3-4/3.17.1(a)i)
[new 4-3-4/
3.15.1(a)i)]
Reference “4-3-4/3.17.2” to read “4-3-4/3.15.2”.
157 4-3-4/3.17.1(c)
[new 4-3-4/
3.15.1(c)]References “4-3-4/3.17.1(a)”,“4-3-4/3.17.1(b)” and“4-3-4/3.17.1(a)ii)” to read “4-3-4/3.15.1(a)”,“4-3-4/3.15.1(b)” and “4-3-4/3.15.1(a)ii)”.
158 4-3-4/3.17.2
[new 4-3-4/
3.15.2]
Reference “4-3-4/3.15” to read “4-3-4/3.13”.
158 4-3-4/3.19.1(a)i)
[new 4-3-4/
3.17.1(a)i)]
Reference “4-3-4/3.19.2” to read “4-3-4/3.17.2”.
159 4-3-4/
3.19.1(a)ii)
[new 4-3-4/
3.17.1(a)ii)]
Reference “4-3-4/3.19.1(a)ii)” to read “4-3-4/3.17.1(a)ii)”.
159 4-3-4/3.19.1(c)
[new 4-3-4/
3.17.1(c)]References “4-3-4/3.19.1(a)”,“4-3-4/3.19.1(b)” and“4-3-4/3.19.1(a)ii)” to read “4-3-4/3.17.1(a)”,“4-3-4/3.17.1(b)” and “4-3-4/3.17.1(a)ii)”.
159 4-3-4/3.19.2
[new 4-3-4/
3.17.2]
Reference “4-3-4/3.15” to read “4-3-4/3.13”.
160 4-3-4/3.21.2(b)
[new 4-3-4/
3.21.2(b)]References “4-3-4/3.17.1” and“4-3-4/3.19.1” to read “4-3-4/3.15.1” and “4-3-4/3.17.1”.
161 4-3-4/3.23.1(c)
[new 4-3-4/
3.21.1(c)
Reference “4-3-4/7.15.3” to read “4-3-4/7.13.3”.
163 4-3-4/7.3Delete inadvertently duplicated 4-3-4/7.3.  (Requirements are now in 6-1-1/23.)
Renumber subquent Paragraphs of 4-3-4/7 accordingly.
167 4-3-4/7.15
[new 4-3-4/7.13
Reference “4-3-4/7.13” to read “4-3-4/7.11”.
167 4-3-4/7.17
[new 4-3-4/7.15
Reference “4-3-4/7.13” to read “4-3-4/7.11”.
168 4-3-4/7.19
[new 4-3-4/7.17
Reference “4-3-4/7.13” to read “4-3-4/7.11”.
168 4-3-4/7.19.2
[New 4-3-4/
7.17.2]
Reference “4-8-3/7.19.6(c)” to read “4-3-4/7.17.6(c)”.
169 4-3-4/7.19.5(b) Reference “43-3/3.7.2(d)” to read “4-3-3/3.7.2(d)”.
169 4-3-4/7.19.6(b)
写春天的诗
[new 4-3-4/
7.17.6(b)
Reference “4-3-4/7.19.6(a)” to read “4-3-4/7.17.6(a)”.
169 4-3-4/7.19.7(a)
[new 4-3-4/
7.17.7(a)
Reference “4-3-4/7.3.1” to read “6-1-1/23.1”.
精英主板
171 4-3-4/9.7Delete inadvertently duplicated 4-3-4/9.7.  (Requirements are now in 6-1-1/25).

本文发布于:2023-05-29 22:42:24,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/82/809490.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:春雪   温度   班长   精英
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图