KALIMANTAN ISLAND
1) Apar Bay
Anchor/loading position : 01 – 54 – 00 South / 116 – 37 – 00 East
Loading rate : abt 8,000 – 10,000 mt per day by ship’s gear (iagw)
Loading facility : Ship’s gear / Floating Crane on subject *)
Port restriction : No restriction, except max draft abt 19m (open a)
Shipper : Various
Port charges : – Harbour dues : GRT x Usd. 0.035
– Light dues : GRT x Usd. 0.034
就业力2) Adang Bay
Anchorage : 01 – 49 – 03.68 South / 116 – 09 – 30 East
Loading position as per shipper advi :
A) 01– 42 – 00 South / 116 – 38 – 30 East
B) 01 – 42 –30 South / 116 – 38 – 30 East
C) 01 – 43 – 00 South / 116 – 38 – 30 East
D) 01 – 43 – 30 South / 116 – 38 – 30 East
Loading rate : abt 8,000 – 10,000 mt per day by ship’s gear (iagw)
abt 10,000 – 15,000 mt per day per Floating Crane*on subject (iagw)
Loading facility : Ship’s gear
Port restriction : No restriction (open a)
Draft in anchorage : 16 – 29 mtrs
Shipper : PT. Kideco Jaya Agung
Port charges : – Harbour dues : GRT x Usd. 0.035
– Light dues : GRT x Usd. 0.034
3) Banjarmasin, Taboneo
Anchor/loading position : * Handy 03 – 40 – 00 South / 114 – 26.5 – 00 East (max draft abt 12 – 13m, depth abt 13m)
* Panamax 03 – 41 – 00 South / 114 – 26.5 – 00 East (max draft abt 14 – 15m, depth abt 17m)
* Capesize 03 – 42 – 00 South / 114 – 26.5 – 00 East (max draft abt 18 – 19m, depth abt 20-22m)
Loading rate : abt 10,000 – 15,000 mt per day by ship’s gear (iagw)阚姓
abt 15,000 – 20,000 mt per day per Floating Crane (iagw)
Loading facility : Ship’s gear / available one unit Floating Crane (various shippers)
available 4 units floating crane (PT. Adaro Indonesia)
Port restriction : No restriction (open a)
坦率的近义词Shipper : Various / PT. Adaro Indonesia
Port charges : – Harbour dues : GRT x Usd. 0.080 + 10% VAT
冰箱有异味– Light dues : GRT x Usd. 0.034
4) Jorong
Anchor/loading position :* Handy 004 – 07.6 South / 115 – 04.5 East (max draft abt 13m)
* Panamax 004 – 11.5 South / 115 – 05.9 East (max draft abt 16m)
* Capesize 004 – 11.5 South / 115 – 05.9 East (max draft abt 16m)
Loading rate : abt 8,000 – 10,000 mt per day by ship’s gear (iagw)
Loading facility : Ship’s gear
Port restriction : No restriction (open a)
Shipper : PT. Jorong Barutama
Port charges : – Harbour dues : GRT x Usd. 0.035 + 10% VAT
– Light dues : GRT x Usd. 0.034
5) Satui
Anchor/loading position : * Handy 03 – 53.50 South / 115 – 30.50 East (max draft abt 10m)
* Panamax 03 – 56.00 South / 115 – 31.50 East (max draft abt 12m)
* Capesize 03 – 57.00 South / 115 – 37.00 East (max draft abt 16m) 宣誓仪式
For Arutmin 03 – 57.80 South / 115 – 31.80 East ( max draft abt 14m)
03 – 53.00 South / 115 – 36.00 East (max draft abt 16m)
Loading rate : abt 8,000 – 10,000 mt per day by ship’s gear (iagw)
Loading facility : Ship’s gear / Floating Crane on subject *)
Port restriction : No restriction (open a)
鲮鱼怎么做好吃
Shipper : Various / PT. Arutmin Indonesia
Port charges : – Harbour dues : GRT x Usd. 0.080 + 10%VAT
– Light dues : GRT x Usd. 0.034
6) Samarinda
怎样自我介绍Anchor/loading position : * Jan – Jun : Ma. Jawa 01 – 05 – 00 South / 117 – 15 – 00 East (max draft abt 20m)
* Jul – Dec : Ma. Berau 00 – 15 – 00 South / 117 – 34 – 00 East (max draft abt 25m)
Loading rate : abt 8,000 – 10,000 mt per day by ship’s gear (iagw)
abt 15,000 – 20,000 mt per day per Floating Crane (iagw)
Loading facility : Ship’s gear / Floating Crane
Port restriction : No restriction (open a)
Shipper : Various
Port charges : – Harbour dues : GRT x Usd. 0.080 + 10% VAT
– Light dues : GRT x Usd. 0.034
玉石背景墙– Pilotage : (GRT x Usd. 0.02 + 47.3) x 2 (at Ma Jawa only)
7) Muara. Pantai, Berau
*Shipper PT. Berau Coal
Anchor/loading position : * Capesize 01 – 59 – 80 North / 118 – 09 – 10 East
* Handy & Panamax
Position A) 01 – 59.10 North / 118 – 08.50 East
Position B) 01 – 59.20 North / 118 – 08.90 East
Position C) 01 – 58.60 North / 118 – 08.90 East
Position D) 01 – 58.35 North / 118 – 08.55 East
Position E) 01 – 58.70 North / 118 – 08.20 East
Position F) 01 – 59.20 North / 118 – 08.10 East
Loading rate : abt 8,000 – 12,000 mt per day (iagw) by ship’s gear
abt 15,000 – 20,000 mt per day (iagw) by SST (Semi Submersible Transshipper)
abt 15,000 mt per day(iagw) per Floating Crane, available 2 units
Port charges (Lumpsum) : -Less 40,000 Mt DWT = Usd. 16,000.00
: 40,001-70,000 Mt DWT = Usd. 18,000.00
:
Over 70,000 Mt DWT = Usd. 20,000.00
: Cape Size = Usd. 22,000.00
**Shipper PT. Bara Jaya Utama
Anchor/loading position : * Position A) 01 – 57.40 North / 118 – 07.32.40 East
* Position B) 01 – 57.10 North / 118 – 07.22.40 East
Loading rate : abt 8,000 – 12,000 mt per day (iagw) by ship’s gear
abt 15,000 mt per day(iagw) per Floating Crane, available 2 units
Port restriction : No restriction (open a)
Shipper : PT. Berau Coal / PT. Bara Jaya Utama
Port charges : – Harbour dues : GRT x Usd. 0.035
– Light dues : GRT x Usd. 0.034
– Pilotage In/Out : 2 x (GRT x Usd. 0.036) + Usd. 180
Sebuku
Anchor/loading position : * Handy 03 – 41 – 30 South / 116 – 13 – 00 East (max draft abt 10m)
* Panamax 03 – 41 – 50 South / 116 – 24.4 East (max draft abt 18m-19m)
Loading rate : abt 8,000 – 10,000 mt per day by ship’s gear (iagw)
abt 17,500 mt per day per Floating Crane (iagw)
Loading facility : Ship’s gear / available one unit Floating Crane
Port restriction : No restriction (open a)
Shipper : PT. Bahari Cakrawala Sebuku
Port charges : – Harbour dues : GRT x Usd. 0.080 + 10% VAT
– Light dues : GRT x Usd. 0.034
9) Tanjung Pemancingan
Anchor/loading position : 03 – 11.5 – 00 South / 116 – 21 – 50 East (max draft 17m)
Loading rate : abt 8,000 – 10,000 mt per day by ship’s gear (iagw)
Loading facility : Ship’s gear / Floating Crane on subject *)
Port restriction : No restriction (open a)
Shipper : PT. Arutmin Indonesia / various
Port charges : – Harbour dues : GRT x Usd. 0.080 + 10% VAT
– Light dues : GRT x Usd. 0.034