常用钻井英语缩写

更新时间:2023-05-22 01:59:59 阅读: 评论:0

钻井英语缩写
1.DP drill pipe 钻杆
2.HWDP heavy weight (wall)
drill pipe 加重钻杆
3.DC drill collar 钻铤
4.BHA bottom hole asmbly
井下钻具组合
5.STB stabilizer 钻杆扶正器
6.PNMDC pony non-magnetic
drill collar 短无磁钻铤
7.SMDC short non-magnetic
drill collar 短无磁钻铤
8.PDM positive displacement
motor 螺杆
9.BOP blowout preventer 封
井器
10.BOPE blow out preventer
equipment 封井器设备
11.IBOP inside blowout
preventer 内防喷工具
12.CSG casing 套管
13.TBG tubing 油管
14.JNT/JT joint 单根
15.XO cross-over 配合接头
16.IF internal flush 内平
17.FH full hole 贯眼
18.REG regular 正规
19.IU internal upt 内加厚
20.EU external upt 外加厚
21.EUE external upt 外加
22.IEU interna l&external
upt  内外加厚
23.OH open hole 裸眼
24.WOB weight on bit 钻压
25.RPM revolutions per minute
转速/分钟
26.SPM strokes per minute
冲程/每分钟27.ECD equivalent circulating
density 当量泥浆密度
28.MT metric ton 公制吨
29.DST drill stem test 钻具
测试
30.KS key at 键槽
31.KSW key at wiper 键槽
清洁器
32.STDS stands 立柱
33.VIS viscosity 粘度
34.PV plastic viscosity 塑性
粘度
35.YP yield point 屈服值
36.FL filtrate loss 滤失
37.WL water loss 失水
38.TVD true vertical depth
垂深
三角题
39.MD measured depth 测量
孟德尔分离定律
井深
40.TD total depth 总井深
不舍的英文
41.PBTD plug back total depth
人工井底
42.PCS piece 件,个万木争荣
经常头疼怎么办43.KOP kick off point 造斜
44.DIR direction 定向45.AZM azimuth 方位
46.DEV deviation 井斜
47.ROP rate of penetration 机
械转速
48.ID inside-diameter 内径
49.OD outside diameter 外径
50.FTG footage 进尺
51.PPG pounds per gallon
(密度)每加仑磅
52.PSI pounds per square inch
磅每平方英尺
53.SGL single 单根
54.LP low pressure 低压
55.HP high pressure 高压
56.H P horpower 马力
57.HHP hydraulic horpower
水马力猪八戒公司
58.HTHP high temperature
high pressure 高温高压
59.AD assistant driller 副司
60.LCM lost circulation
material 堵漏剂
61.API American petroleum
institute 美国石油协会
62.IADC international
association of drilling contractors 国际钻井承包商
协会
63PC China national
petroleum 中国石油天然气
总公司
64.P/N part number 零件型
65.S/N rial number 系列号
66.N/W net weight 净重
67.G/W gross weight 毛重
12的意思
68.P/U pick up 吊起
69.M/U make up 接上
70.L/D lay down 甩开
71.N/U nipple up 接上
72.N/D nipple down 卸开
73.R/U rig up 安装
74.R/D rig down 拆卸
75.WOC wait on cement 候
76.WOW wait on water 等水
77.WOW wait on weather 等
天气
78.WOO wait on order 等指
79.RIH run in hole 下钻80.POOH pull out of hole 起
81.DR drilling 钻进
82.DDR daily drilling report
钻井日报表
83.RM reaming 扩眼(划眼)
84.BR back ream 倒划眼
85.TOF top of fish 鱼顶
86.SX sacks 袋
87.MW mud weight 泥浆密
88.CBU circulate bottom up
循环一周那一刻我长大了作文

本文发布于:2023-05-22 01:59:59,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/82/726507.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:钻井   石油   泥浆   钻杆
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图