版图软件laker的操作手册 L3_LabBook

更新时间:2023-05-21 12:15:57 阅读: 评论:0

Laker L3 Training Lab
3.1v2
Oct. 2006人力资源年终总结
为什么选择我们公司Laker L3 Training LAB_3.1v2 Overview
Follow the lessons provided in this LAB, you will gain more practices and advanced functionalities of Laker L3.
This LAB includes the following lessons:
• Lesson 1: Importing CDL Netlist
• Lesson 2: Opening Cell with Design Browr & Schematic window
• Lesson 3: Cross Probing
• Lesson 4: Floor Planning
• Lesson 5: Magic Cell
• Lesson 6: Cell Template & Stick Diagram
• Lesson 7: Matching Creation
• Lesson 8: Wiring by Connectivity Driven & Rule Driven
画画用英语怎么说• Lesson 9: ECO Flow
长跑作文• Lesson 10: Associate Legacy Cell (Reu Layout) with Connectivity Driven layout Flow
• Lesson 11: Copy Array & Manual Associate
• Lesson 12: Pattern Recognition
• Appendix I: Prepare Data
We will u the real demo ca as the examples to guide you learn L3 advance features in the connectivity driven custom layout flow.
> mkdir <working_dir>
> cd <working_dir>
钢琴怎么选
> cp 31v2_L3_ .
> gzip –cd 31v2_L3_ar xvf -
> cd L3
> laker &
z Lesson 1: Importing CDL Netlist
Laker provides an open system that can import various types of design databa, such as GDSII, ASCII, LEF, DEF and CDL netlist. In this lesson, we will import
a CDL netlist and construct the design bad on its connectivity information.
To import a CDL Netlist,
1. Select File -> Import -> to bring up the CDL In form.
2. In the CDL In form, indicate your design file by type ./demo.cir in the Design File box.
3. Assign the technology file by type demo.tf in the Technology File box.
4. Type demo_try in the Library Name box.
5. Type ./demo.map in the Model Map Table box.
6. When the assignments are done, click OK to import the design.
NOTE: The summary of CDLIn conversion will be displayed in the message window under Laker main window; and the detailed information is recorded in the
双核浏览器spicein.log file, which can be found under the working directory.
z Lesson 2: Opening Cell with Design Browr and Schematic Window
Opening a Cell
Next, we are going to open one of the schematic cells, top, from the demo library. Notice that the cells translated from CDL netlist containing schematic view only, when you open such kind of cell in the design window, Laker will estimate a cell boundary (soft instance) and create a layout view for the cell.
When the CDL In process is done, open a cell as follows:
1. Click on the Open Cell button to bring up the Open Cell form.
去湿气的食物2. In the Open Cell form, lect demo from the library list.
3. Select top from the cell list.
王娡
4. Click OK to open the cell in the design window.
In Laker design window. You can find three sub windows. There are Design Browr, Schematic Generator, and Layout window.
You can u the Design Browr to rearrange the design hierarchy for layout optimization. The built-in schematic generator generates the schematic drawing from the connectivity information and allows layout designers to easily brow the design. The layout window provides the automatic editing commands with controllable constraints to construct the layout and maintain the handcrafted quality.
Hierarchy Optimization in design browr
You can rearrange hierarchy of schematic in design browr by “Make node” & “Flatten” command.
Make Node
Change the schematic design hierarchy to group some objects to a new instance. This command functions only under Object tab.
Flatten
Change the schematic design hierarchy and flatten instances to a specified level. This command functions only under Object tab.
Example
1. Multi. lecting the instances then click-right button to do “Make Node” into TRY instance. (e figure)
2. The TRY instance return to original hierarchy in rever procedures by flatten in design browr. Detail procedures refer to the figures as below.

本文发布于:2023-05-21 12:15:57,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/82/719380.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:年终总结   选择   长跑
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图