冲压英语
笛卡尔冲压常用词汇
stamping, press冲压
punch press, dieing out press冲床
uncoiler & strainghtener整平机
feeder送料机
rack, shelf, stack料架
cylinder油缸
robot机械手
taker取料机
conveyer belt输送带
transmission rack输送架
top stop上死点
bottom stop下死点
one stroke一行程
inch寸动
to continue, cont.连动
to grip(material)吸料
location lump, locating piece, block stop 定位块ret复位
smoothly顺利
dent压痕
scratch刮伤
deformation变形
filings铁削
to draw holes抽孔
inquiry, arch for查寻
to stock, storage, in stock库存
receive领取
approval examine and verify审核
processing, to process加工
delivery, to deliver 交货
to return delivenry to.
to nd delinery back
to retrn of goods退货
registration登记
registration card登记卡
to control管制
to put forward and hand in提报
safe stock安全库存
非常的近义词acceptance = receive验收
to notice通知
application form for purcha请购单
consume, consumption消耗
to fill in填写
abrasion磨损
rever angle = chamfer倒角character die字模
to collect, to gather收集
failure, trouble故障
statistics统计
demand and supply需求
career card履历卡
to take apart a die卸下模具
to load a die装上模具
to tight a bolt拧紧螺栓
to loor a bolt拧松螺栓
to move away a die plate移走模板easily damaged parts易损件
standard parts标准件
breaking.(be)broken,(be)cracked 断裂to lubricate润滑
common vocabulary for die engineering 模具工程常用词汇
die 模具
figure file, chart file图档
cutting die, blanking die冲裁模progressive die, follow (-on)die 连续模compound die复合模
punched hole冲孔
panel board镶块
to cutedges=side cut=side scrap切边
to bending折弯
to pull, to stretch拉伸
Line streching, line pulling线拉伸engraving, to engrave刻印
upsiding down edges翻边
to stake铆合
designing, to design设计
design modification设计变化防水工程
die block模块
folded block折弯块
sliding block滑块
location pin定位销
lifting pin顶料销
die plate, front board模板
padding block垫块
stepping bar垫条
upper die ba上模座
(Jun 01 2007 02:52PM )
lower die ba下模座
upper supporting blank上承板
upper padding plate blank上垫板
spare dies模具备品
spring 弹簧
bolt螺栓
冲压英语
冲压常用词汇
stamping bench, press冲压
punch bench press, dieing out press冲床
uncoiler & strainghtener整平机
feeder送料机
rack, shelf, stack料架
美国公司的模具设计细节指导(中英文)
字体大小:大| 中| 小2007-06-28 16:10 - 阅读:341 - 评论:2
I. Purpo 目的
A. The purpo of this metal stamping die standard is to provide detailed instructions for u in the design, construction, and testing of all metal stamping dies supplied to the Su-dan Corporation
本份模具标准是向所有提供给Su-dan公司的五金模具的设计、组立、试模提供细节指导。
1. Su-dan requires die(s) to produce finished parts that conform to:
Su-dan要求模具制造的产品应与以下保证一致:
a. The part drawing. 产品图面
b. Including geometric dimensioning and tolerancing.
形状尺寸及公差
c. Requirements for first parts approval process.
首件承认程序要求
2. This standard and the specifications referenced herein are issued to:
本标准是应用:
a. Define the general classifications of metal stamping dies for Su-dan. 定Su-dan五金模具分类
b. Reduce the dies design and build costs by: 通过以下条款降低模具设计及组立成本
(1) Standardization of design, which will decrea review time and expen.
设计标准化将降低审图时间及成本
(2) Using commercially available die components. 使用标准件
c. Assure the safety of Su-dan personnel. 确保Su-dan员工安全
d. Promote superior tool design and consistent die making practices.
提升模具设计能力及协调模具制造习惯
II. Scope
A. All metal stamping dies supplied to Su-dan will comply with the requirements specified herein and as stated in the die design and construction data sheets.
所有供应给Su-dan的铁件模具必须遵守这份指定的及在模具设计及组装表册里规定的要求III. Die Classifications 模具级别
A. All dies will be constructed for inter-changeability of perishable die blocks, punches, retainers, die buttons, and pilots.
模具需保证易坏的镶快、冲头、固定器、引导冲组装的易换性。
B. Die material requirements: 模具材质要求
Die Component Description模具组件名称Die Material Type材质种类
Die steel 模板D2 or better
Filler steel 导料板HRS/CRS
Buttons 镶件M-2
黄蘑菇怎么做好吃Pilots 引导冲M-2
Punches 冲头M-2
Buttons & punch retainers 镶件及冲头固定装置A2, 6150,
- 4140 steel - hardened
Pressure pads 压料垫板6150 or 4140 steel -hardened
(See p.17, S-16)
Stripper windows 脱料板快拆窗口6150, 4140 or 0-1 steel hardened
- (See p. 17, S-16)
Form steel 成型D2 or better
In any application where Su-dan is stamping a high strength or high carbon material the u of CPM-4, CPM10V, and CRU-Wear material with a surface coating should be discusd.
在Su-dan冲压高强度及高碳材质的地方,如应用……表面强化需讨论
IV. Metal Stamping Dies - General Requirements:五金模具——一般要求
A. Die design and construction data sheet: 模具设计与组立数据表
1. The Su-dan Engineer shall complete and submit data sheet with each die proposal request (Including shut height, feed levels,parallels, etc.).
Su-dan工程师应填写及提供每一套模具方案要求的资料表(包括闭模高度、送料高度、垫脚等)
2. Data sheet will be updated at final die design review, including the Project Engineer and the vendor’s recommendations, which will become part of the general die specifications.
资料表在最终模具审核时应该更新,项目工程师及供应商的建议都将成为普通模具规范的一部分。
B. Die design approval: 模具设计审核宝宝肌张力高的3大表现
1. A strip layout is required on all parts before formal design is started. The strip layout is to reflect the stock width, the progression, and the tonnage required to produce the stamping. Strip layouts should be developed so that scrap pieces are not left in the die.
在正式设计之前必须提供料带排布,料带包含料带宽,步距,冲床吨位,料带应保证废料不停留在模具上.
2. To conrve material, the edge of the part may be the edge of the coil material wherever the part design will permit. Using edge of coil material as part entity will require written approval from the Tool Engineer.广州市长热线
为了节约料,产品边可使用材料边,如使用卷料边,需要模具工程师的书面批准!
3. The strip should be developed to maintain maximum strip strength for the greatest possible distance through the die.
料带应该强化到最大强度以通过最大的模板距离
4. A die should be designed to minimize any strip distortion which would tend to change the distance between pilot holes (alter the progression).
模具设计应保证最少的任何改变料带步距的料带扭曲.
5. All die designs will include part number, stamped on the part if indicated on the part print and
a Su-Dan ID. stamp if required.
如果产品图面指示或Su-Dan 有号码要求所有模具设计应包含部件号码并刻印在零件上. 6. All die designs that involve both single and/or double progressive dies that produce the following:
在一出一及一出二的连续模设计中,产品应该符合以下标准:
a. A right and l eft hand part, if symetrically opposite, will be equipped with either “R” and “L金融论文
identification on each part.
左右对称相反的零件,必须在每个零件上刻上字符L 及R
b. If parts are not symmetrically opposite a 1/8” letter “T” identificatio n should be ud on one of the parts.
十大古镇
如果左右不是对称相反的零件,在其中的一个零件必须加上1/8” 高的T加以区别。
c. In some cas, a part number destination will be an dated by the part print or requested by the
Project Manager.
在有些案例中,根据图面或项目工程师的要求,零件料号将有一个日期区别
d. Julian date stamps (interchangable) will be required on all safety parts.
7. All die capable of producing multiple level designs from that die, must be equipped with a provision for interchangable part identification to distinguish all variations capable of being produced from that die. Consult with Project Manager for specific identification.
在共用模具设计中,必须预先对快换入子提供一个可区别的方法,可以与制定标准的项目经理商量
8. All die drawing numbers plus special die drawings will be supplied at preliminary review.
在初级设计中所有模具图纸必须完全提供。
9. Provision for loading and unloading of raw materials for all dies, as well as part ejection and scrap removal will be covered during the die design.
在所有模具设计中,必须提供未加工和已加工的工序图,以及产品顶出及废料脱落方式。
10. Designs will avoid excessive u of lubrication to produce stampings。
在模具设计中应该避免过多的使用润滑油去制造产品。
11. If stock does not start against a pitch notch (positive stop) a start mark for first hit will be necessary.