DELL PCB过程审核

更新时间:2023-05-16 15:05:49 阅读: 评论:0

8.0                  17.0 Packaging and OBE
古朗月行全诗#Audit Criteria Auditor's Comments
Supplier's
森林防火安全教案Self Scoring
Dell's
Scoring
各种花的含义Packaging
17.1Is the work instruction for packaging in place and under document control?
包装的作业指导书是否在制程使用而且有文件控制。
17.2Are lots properly parately part number to avoid mixing parts during packaging?
是否有适当的产品号码来区分批量以便在包装过程中防止混料。
卫校学什么17.3Are parts vacuum packaged?
是否使用吸真空包装。
17.4Are proper methods ud to prevent moisture absorption?
是否有合适的方法来防止湿气。
17.5Are weight restriction defined for boxes?
每一个箱子是否有重量限制。
17.6Are customers requirements for packaging accessible?
简单易学的英文歌是否达到客户对包装的要求标准。
17.7Does the suppliers have bar code capability?
供应商是否有条形码管控产品的能力
伯颜帖木儿17.8Are boxes properly labeled on outside with date code, qty, x-out, inspection reports?男人有福
包装箱外面的标签上面是否有日期、数量、检查报告等。梦见很多水果
Score Obtained00 Maximum Score1414 Score Percentage00 Pass Percentage80%80%

本文发布于:2023-05-16 15:05:49,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/82/655418.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:是否   包装   产品   使用   防止   制程
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图