不间断电源(UPS)调试方案

更新时间:2023-05-14 00:04:36 阅读: 评论:0

Universal Beijing, Theme Park
北京环球主题公园项目
Method Statement of Testing & Commissioning for Uninterruptible Power
Supply (UPS)小英语怎么写
不间断电源调试方案
Package No.标段号: Package 1
Document No./文件编号:719-909-711-MS-E-SMCC-TC002
REV 版本号DATE
日期
REASON FOR
ISSUE
发布原因
ORIG
初稿
CHK
审核
中国环保产业协会APPR
批准
REV 版本:0
目录
TABLE OF CONTENTS
1目的PURPOSE (3)
2简介INTRODUCTION (3)
2.1参考规范及标准R EFERENCE C ODES AND S TANDARDS (3)
2.2定义D EFINITIONS (5)
2.3缩略语A CRONYMS AND A BBREVIATIONS (9)
3工作范围SCOPE OF WORK (10)
4测试及调试流程TESTING & COMMISSIONING PROCEDURE (12)
4.1测试前检查P RE-T ESTING I NSPECTION (12)
4.2性能测试P ERFORMANCE T ESTING (13)
4.3文件和可交付成果D OCUMENTATION AND D ELIVERABLES (14)
5测试及调试仪器TEST & COMMISSIONING INSTRUMENT (15)
5.1工具T OOLS (15)
5.2测试证书T EST C ERTIFICATES (16)
6测试及调试方法TEST & COMMISSIONING METHODOLOGY (16)
6.1预启动检查P RE-STARTUP C HECK (16)
6.2上电检查P OWER-O N C HECK (17)
6.3上电测试P OWER-O N T EST (18)
6.4切换测试S WITCHING T EST (18)
6.5负载测试L OADING T EST (19)
REV 版本:0 7测试及调试人员TEST & COMMISSIONING PERSONNEL (21)
8附录APPENDICES (22)
附录A:预启动检查清单A PPENDIX A:P RE-S TARTUP C HECKLIST (22)
附录B:上电检查清单A PPENDIX B:P OWER-O N C HECKLIST (23)
附录C:功能测试记录A PPENDIX C:F UCTIONAL P ERFORMANCE T EST R ECORD (24)
719-909-711-MS-E-SMCC-TC002
REV 版本:0 1 目的
PURPOSE
本测试方案将涵盖北京环球主题公园项目数据中心不间断电源(UPS)在技术规格书263353章节,GB标准及制造商建议下的性能测试。
This method statement will cover the performance testing of Uninterruptible Power Supply (UPS) for Data Centers, Universal Beijing Theme Park Project under the specification Section 263353, GB standard and manufacturer recommendations.
2 简介
INTRODUCTION
2.1参考规范及标准
Reference Codes and Standards
瘦出来的腹肌下列参考规范及标准将应用于不间断电源的性能测试:
The following references shall be ud for performance testing of Uninterrupted Power Supply (UPS):
-GB 7260.1-2008 “不间断电源设备第1-1部分: 操作人员触及区使用的UPS的一般规定和安全要求”
毕业生自我鉴定300字GB 7260.1-2008 “Uninterrupt ible power systems(UPS) - Part 1-1: General and safety
requirements for UPS ud in operator access areas”.
关于环保的宣传语-GB 7260.2-2009 “不间断电源设备(UPS) 第2部分:电磁兼容性(EMC)要求”
GB 7260.2-2009 “Uninterruptible power systems (UPS) - Part 2: Electromagnetic
compatibility (EMC) re quirements”.
-GB 7260.4-2008 “不间断电源设备第1-2部分:限制触及区使用的UPS的一般规定和安全要求”
719-909-711-MS-E-SMCC-TC002
REV 版本:0
GB 7260.4-2008 “Uninterruptible Power Systems(UPS) - Part 1-2: General and safety requirements for UPS ud in restricted access locations”.
-GB 4943.1-2011 “信息技术设备安全第1部分:通用要求”
GB 4943.1-2011 “Information technology equipment -Safety - Part 1: General requirements”.
排球用英语怎么说-GB/T 7260.3-2003 “不间断电源设备(UPS) 第3部分:确定性能的方法和试验要求”
GB/T 7260.3-2003 “Uninterruptible Power Systems (UPS) - Part 3: Method of specifying the performance and test requirements”.
-GB/T 18039.3-2017 “电磁兼容环境公用低压供电系统低频传导骚扰及信号传输的兼容水平”
GB/T 18039.3-2017 “Electromagnetic compatibility―Environment―Compatibility levels for low-frequency conducted disturbances and signaling in public low-voltage power supply systems”.
-GB/T 18039.4-2017 “电磁兼容环境工厂低频传导骚扰的兼容水平”
白石山风景区GB/T 18039.4-2017 “Electromagnetic compatibility―Environment―Compatibility levels in industrial plants for low-frequency conducted disturbances”.
-GB/T 17626 “电磁兼容试验和测量技术”
GB/T 17626 “Electromagnetic compatibility--Testing and measuremen t techniques”.
-GB/T 17625 “电磁兼容限值”
GB/T 17625 “Electromagnetic compatibility―Limits”.
-技术规格书263353 “静态不间断电源”
Specification 263353 “Static Uninterruptible Power Supply”.
-制造商的指导及推荐
Manufacturer’s instruction and recommendation.最长的电影mv
-已批准的不间断电源深化设计图纸
Approved Installation Shop Drawings for Uninterruptible Power Supply.
-已批准的不间断电源安装方案
Approved Method Statement of Installation for Uninterruptible Power Supply.

本文发布于:2023-05-14 00:04:36,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/82/620096.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:测试   电源   标准   性能   调试   部分
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图