隧道英语词汇

更新时间:2023-05-12 05:52:51 阅读: 评论:0

隧道掘进机 tunnel boring machine                    
围岩自稳时间 rock-lf stability time                  
松散压力 loosing pressure                            
形变压力 clastic pressure                              
全断面开挖法 full face excavation method                
正台阶法 bench cut method                            
环形开挖预留核心土法 ring cut method                  
双侧壁导坑法 both side drift method                     
中洞法 center drift excavation method                    
中隔壁法(CD法) center diagram method                
交叉中隔壁法(CRD法) center cross diagram method      
岩爆 rock burst                                        
浅孔爆破 short hole blasting                            
深孔爆破 long hole blasting                            
光面爆破 smooth blasting 
预裂爆破 presplitting 
锚喷支护 shotcrete and rock bolt support 
钢架 steel frame or beam support
超前支护 advanced support 
管棚 pipe-roof protection 
小导管预注浆 small pipe-roof protection 
超前锚杆 pioneer rock bolt 
预注浆 pioneer grouting 
回填注浆 back filling grouting
干喷 dry shotcrete 
初喷 first shotcrete(aplication of first shotcrete)
复喷 subquent shotcrete(aplication of shotcrete)
锚杆 rock bolt 
中岩墙(中岩柱、中夹岩) wall of rock in neighborhood tunnel 
监控量测 monitoring measurement 
超前地质预报 geological prediction
瓦斯 gas 
瓦斯浓度 gas concentration 
围岩 surrounding rock 
围岩压力 surrounding rock pressure 
围岩分级 surrounding rock classification
初始地应力场 initial ground-stress field
作用 action 
荷载 load 
容许应力设计法 allowable stress design method
破损阶段设计法 plastic stage design method
概率极限状态设计法 probability limit state design method 
可靠性 reliability 
设计基准期 design relerence period 
安全等级 safty class 
承载能力极限状态 ultimate limit states 
正常使用极限状态 rvice-ability limit states 
可靠指标 reliability index 
失效概率 probability of structural failure 
作用代表值 reprentative value of actions 
作用标准值 characteristic value of actions 
作用设计值 design value of actions
作用效应 effects of actions 
作用的组合 combination of actions 
材料性能标准值 characteristic value of a material property 
几何参数标准值 nominal value of geometrical parameter 
几何参数设计值 design value of geometrical parameter 
分项系数 partial coefficient 
抗力 reaction 
地震动参数 ismic ground motion parameter
地震动峰值加速度 ismic peak ground acceleration 
公路隧道 road tunnel 
山岭隧道 mountain tunnel 
岩石质量指标 Rock Quality Designation(RQD) 
岩体分级 rock mass classification 
环境调查 environmental survey 
水文调查 hydrological survey 
地质调查 geological survey 
隧道涌水 water inflow into tunnel 
偏压 unsymmetrical pressure 
新奥法 NATM(New Austrian Tunneling Method) 
净空断面(内轮廓) inner ction 
洞门 portal 
衬砌 lining 
仰拱 invert 
小净距隧道 neighburhood tunnel 
联拱隧道 multi-arch tunnel 
竖井 vertical shaft 
斜井 incline, incline shaft 
横通道 horizontal adit 
超前导坑 advancing drift 
通风 ventilation 
照明 lighting
地铁 metro,underground railway, subway 
设计使用年限 designed lifetime 
运营概念 operation concept 
旅行速度 operation speed 
限界 gauge 
正线 main line 
辅助线 assistant line
联络线 connecting line 
试车线 testing line 
轨道结构 track structure 
轨距 gauge of track 
无缝线路 amless track 
整体道床 monolithic track-bed 
路基 subgrade
车站公共区 public zone of station 
站台计算长度 computed length of platform 
无缝线路纵向水平力 longitudinal horizontal force of amless track 
无缝线路断轨力 broken rail force of amless track 
明挖法 cut and cover
盖挖顺筑法 cover and cut-bottom up 
盖挖逆筑法 cover and cut-top down 
矿山法 mining method 
盾构法 shield method 
沉管法 immerd tube method 
防水等级 grade of waterproof 
变形缝 deformatio joint 
刚柔结合的密封区 rigid-flexible joint of aled zone 
开式运行 open made operation 
闭式运行 clo made operation 
活塞通风 piston action ventilation 
合流制排放 combined wer system 
集中式供电 centralized power supply mode 
分散式供电 distibuted power supply mode 
混合式供电 combined power supply mode 
主变电所 high volyage substation 
牵引降压混合变电所 combined substation 
杂散电流 stray current 
同步数字传输系统 synchronous digital hierarchy transmission system(SDH)
全球定位系统 global position system(GPS)
列车自动控制 automatic train control(ATC) 
列车自动监控 automatic train supervision(ATS) 
列车自动防护 automatic train protection(ATP) 
列车自动运行 automatic train operation(ATO) 
调度集中 centralized traffic control(CTC) 
自动人行道 moving pavement 
自动售检票系统 automatic fare collection 
火灾自动报警系统 fire alarm system(FAS) 
区域报警系统 local alarm system 
集中报警系统 remote alarm system
环境与设备监控系统 building automatic system (BAS) 
系统集成 system integration(SI)
运营控制中心 operation control center(OCC)

本文发布于:2023-05-12 05:52:51,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/82/595524.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:设计   自动   隧道   系统
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图