DELL机架式服务器导轨安装图释

更新时间:2023-05-08 15:06:48 阅读: 评论:0

DELL机架式服务器导轨安装图释
Server Depth w/ CMA Rail Compresd Rail Extended
1950 Sliding Rapid \ VersaRail26.98 inch29.5 inch
2950 Sliding Rapid \ VersaRail26.84 inch29.46 inch
Rail Conversion
The following procedure outlines converting the 9th generation PowerEdge rails from RapidRails to VersaRails. Converting from VersaRails to RapidRails follows the same procedure.
NOTE:
The rail in the example is a PowerEdge 1950 rail. The PowerEdge 2950 rails follow the exact same conversion process.
9th Generation Rail Conversion
1. Locate the rail conversion bracket on the end of the rail.
2.
3.
4.
5. Line the bracket up with the two posts and t it down.
6. Rotate the bracket clock wi until it snaps into place.

本文发布于:2023-05-08 15:06:48,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/82/557213.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:机架式   服务器   导轨   安装
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图