电气工程施工方案中英文

更新时间:2023-08-01 21:05:45 阅读: 评论:0

电气工程
Electric Works
一、工艺流程图  Technological process Diagram
二、电气安装质量控制点及控制措施  Quality Control Point and Control Measure on Electric Installation
梦到被人欺负我的创业故事
分项工程
Sub-item
质量控制点
Quality Control Point
质量控制措施
Quality Control Measure
备注
Remark
施工准备 Construction Preparation
材料计划、材料送审、施工方案
Material plan, material review and approval, and construction program
认真编制
Work out carefully
明管安装
Openpipe installation
位置、标高正确、接地良好
The position and elevation are correct, and the grounding is good
绘制综合图及管路接地大样图
Draw integrated drawing and detail of pipeline grounding
桥架线槽安装
Installation on crane span structure slot
标高准确、吊架安装、穿墙、楼板的防火处理、与其它专业管道的间距
Correct level, installation on hanger frame, fire protection treatment of through-wall and floor, clearance with other special pipeline
绘制综合图、吊架安装图、防火处理大样图
Draw integrated drawing, installation drawing of hanger frame, and detail of fire protection treatment
穿线配线
Threading distribution
接线正误、导线涮锡、导线损伤
Wiring correct error, conducting wire with rinsing tin, conducting wire with damage
严格执行接线图、涮锡
穿线时注意保护导线
Strictly carry out wiring drawing, rinsing tin, pay attention to protecting the wire when threading
电缆敷设
Cable lay
电缆平直、固定牢固、电缆弯扁度、标识
Straight cable, firm fixing, cable bending, and identification
落实图纸、规范相关要求
Implement requirements relating to drawing and specification
焊接点
Soldered dot
焊接部位的接地电阻、焊点表面光滑饱满
Ground resistance at welded position, and the surface at welded point is smooth and full
焊接完成后测试焊接部位的接地电阻
Test the ground resistance of welded position after finishing the welding.
器具安装
Appliance installation
位置正确、安装牢固、观感良好
The position is correct and installed firmly, the appearance is good.
按绘制的机电综合图、表面器具布置平面图安装
Arrange the plan installation according to electromechanical drawn integration diagram and surface appliance
调试
方案策划书
Debugging
系统运行的稳定性、运行的可靠性、绝缘摇测
Operating stability, reliability, and insulating shake-measure in system
制订专项调试方案
Work out the special debugging plan
高中男生
三、关键工序技术及质量控制保证措  Key Working Procedure and Quality Control Guarantee Measure
1、镀锌钢管明敷设  Open Lay of Galvanized Steel Pipe
本工程明敷设钢管均采用了镀锌钢管明敷设工艺。
All open-lay steel pipes in the project adopt the open-lay technology of galvanized steel pipe.
(1)工艺流程  Technological process:
(2)可上人的吊顶内以及不封闭式竖井通道内的配管为明配管,其管路走向及支架固定均应按明配管要求施工。
The distributing pipe in suspended ceilings that can be entered into and shaft passages that are not clod is open. Both its pipeline direction and support fixture should construct according to requirements of open distributing pipes.
(3)按设计要求用冷煨法把管子煨出所需的弯度,20mm以下管径的管子用手板煨管器,25mm以上管径用液压煨管器(或专用煨管器),煨弯处凹扁度应符合规范规定。
剖腹产可以吃什么U the simmering method to simmer pipes with a necessary bend according to design requirements. Pipes that the pipe diameter is less than 20mm may adopt a palm simmer pipe machine. Pipes that the pipe diameter is more than 25mm may u a hydraulic simmer pipe machine (or special simmer pipe machine). The concavity at simmering bends should accord with specifications and regulations.
(4)断管采用钢锯或无齿锯,需断切的管子尺寸准确,将管子置于压力钳口中心卡紧,断口平齐。断口处用锉将管口内外锉光,无毛刺,管内铁屑清除干净。
Broken pipes adopt a hacksaw or a saw without teeth. The size of pipe needing to cut should be exact. Put pipes on the center of pressure jaw, and keep fractures even. At fracture, fill the inner or outer of pipe orifice smoothly without any burr. The scrap iron in pipe should be cleaned clearly.
(5)管子套丝采用套丝机,根据管子外径及扣距选用相应板牙,将管子用台虎钳或龙门压架钳紧牢固,再把绞板套在管端,均匀用力,不得过猛,随套随浇冷却液。丝扣不乱且干净清晰,管箍上好后,管口应对严,外露丝扣不应过长。外露丝扣不得超过3扣
The mantle fiber of pipe may adopt a mental fiber machine. Select corresponding dies according to the outer diameter and of pipe the pitch. Clamp the pipes firmly by using a vice or planer pressing pliers. Then cover the capstan on pipe ends. Exert evenly not too strongly, and pour the cooling fluid on it while covering. The clasp is not in disorder and cleaned clearly. After pipes are hoped well, pipe orifices should be aimed at accurately. And the expod clasp should not be too long.
(6)镀锌钢管必须采用通丝管箍连接。不得采用熔焊跨接地线,应在连接处的两端用专用接地卡固定跨接接地线,镀锌钢管丝扣连接也可以直接用导电膏不采用跨接如下图所示:
Galvanized steel pipes must adopt harness cord pipe hoops to connect. Do not adopt fusion-welding bridge ground wires. U the special ground card at two ends of joints to fi
x and bridge the ground wires. The connection of galvanized steel pipes is shown in the following figure.
镀锌钢管连接方法
Connection on Galvanized Steel Pipe
符号说明:Symbol Explanation
1-镀锌钢管 Galvanized steel pipe
2-接地卡Ground card
3-接地线Ground wire
4-通丝管箍 Harness-cord pipe hoop
(7)严格按图纸要求敷设管线,坐标与标高准确,固定牢固。管路敷设按规范要求加装接线盒,管箍连接处采用专用接地线卡跨接地线,线管进入盒、箱处,按设计要求预留孔、洞,待稳住盒、箱后再进行下道工序,需加装护口处应及时加装护口。
Lay pipelines strictly according to requirements in drawing. Both coordinates and levels a
re accurate and the pipelines should be fixed firmly. The pipe lay is asked to add a terminal box according to specification requirements. The joint of pipe hoop adopts special ground wire cards to bridge the ground wire. Spools are put into boxes. And holes and orifices are asked to pre-leave according to design requirements. Only after boxes have been stable, carry out the next working procedure. A protective orifice should be added in time at the position that needs to add.
(8)钢管沿墙过沉降缝敷设,按照下图进行敷设:
Lay steel pipes through ttlement joints along with wall, and carry out laying according to the following figure.
烟花英语怎么读
镀锌钢管明配过沉降缝安装方法
Installing Method of Galvanized Steel Pipe openly Laying Settlement Joints
符号说明:Symbol Explanation
1-预埋接线盒 Built-in terminal box
2-伸缩缝 Expansion joint
3-接地线 Ground wire
4-金属软管 Metal ho
5-锡焊 Soldering
(9)管路固定及接地线做法详见下图:
Pipeline fixture and ground wire are shown in the following figure.
管路固定及接地线做法
Pipeline Fixture and Ground Wire
符号说明:Symbol Explanation:
1-镀锌钢管 Galvanized steel pipe
2-接地卡 Ground card
3-跨接地线 Bridge ground wire
4-过路盒 Passing box
5-接地线固定螺丝 Fixed screw in ground wire
牛骨汤的做法6-通丝管箍 Harness cord pipe hoop
(10)管路过梁做法详见下图  The pipeline astillen is shown as in the following figure:
管路过梁做法
Pipeline Astillen
符号说明:Symbol Explanation
1-塑料胀栓 Plastic expanding bolt
2-自攻螺钉 Self-tapping bolt
3-离墙管卡 Wall-away pipe strap
4-镀锌钢管养老金发放标准 Galvanized steel pipe
5-接地管卡 Ground pipe strap
6-接地线 Ground wire
7-管接头 Union joint
8-过路盒 Passing box

本文发布于:2023-08-01 21:05:45,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/82/1126087.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:安装   管子   采用   钢管   要求   敷设   镀锌   管路
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图