DATE:SUPPLIER NAME:VOLUME QUOTED:PART #:PLANT LOCATION:TOOLING CAPACITY:
PART NAME:MFG DUNS CODE:@ HRS/DAY:DWG LEVEL:
LOCAL CURRENCY:@ DAYS/WEEK:RFQ #:
EXCHANGE RATE:
PREPARED BY:
RAW MATERIAL AND PURCHASED COMPONENTS:
NET UNIT
GROSS UNIT % MAT'L AMOUNT
AMOUNT
UOM
UTILIZATION
PC
TOTAL MATERIAL:
PERCENTAGE OF SALES PRICE:
0%
LABOR & BURDEN:
---------------------------LABOR DETAIL ---------------------------------------MACHINE DATA ------------------------------------BURDEN DETAIL -----------------------------
TOTAL LABOR:- PERCENTAGE OF SALES PRICE:
0%
(TOT FIXED)
PERCENTAGE OF SALES PRICE:
0%% SALES TOTAL MANUFACTURING COST (MATERIAL + LABOR + BURDEN):0%SELLING, GENERAL & ADMINISTRATIVE EXPENSE:
0%PROFIT:0%PACKAGING:SELLING PRICE:
TRANSPORTATION & FREIGHT
TOTAL TRANSPORTATION COST:
PIECE PRICE AND TOOLING COST BREAKDOWN FORM
MATERIAL COST
- ITEM DESCRIPTION
ITEM I.D.
COST/ UNIT
SCRAP RECLAIM TOTAL (COST/#, YD, SQ FT, ETC.)
COST/UNIT
- - - - - - -
Op #
OPERATION /
DESCRIPTION
LABOR RATE
THROUGHPUT (PCS/HR)
# OPER
LABOR COST
MACHINE SIZE
MACHINE TYPE
VAR COST
醋椒豆腐
FIXED COST
TOTAL BURDEN
COST
BURDEN COST / HR身体过敏
TOTAL ANNUAL
COST
-
0.00
- - - TOTAL ANNUAL
- 0.00-
TAX
吻英文
FREIGHT DUTY ITEM DESCRIPTION
TOTAL
COST
This transportation & freight cost should be the estimate of the cost to deliver the goods to the Nexteer dock from the Named Place, if applicable. If a cost should be captured for delivering the goods from your facility to the Named Place, plea include that in the Burden Detail listed above.
Note: This "Total Transportation Cost" will NOT be included in your lling price.
PRODUCTION TOOLING DETAILS:马家窑文化彩陶
绵谷回寄蔡氏昆仲
PRE-PRODUCTION PROTOTYPE INVESTMENT DETAILS:
广播电台英语
TOTAL PRE-PRODUCTION TOOLS COST:
PRE-PRODUCTION PROTOTYPE INVESTMENT COSTS:
PRE-PRODUCTION PIECE COSTS:
薛道衡腹压-