Contract
此合同参照MES生产物料一般采购条款以及相关的价格协议和供应商质量管理要求而定。This Contract is subject to our General Terms & Conditions of Purcha for production materials in conjunction with the corresponding price agreement and Quality Management requirements for suppliers (refer to METHODE Quality Assurance Guidelines for Suppliers)
合同双方需要遵守:
设备通用采购条款
This file been kept in:
cpu哪个好
2.交付条件:送货至电子有限公司,到厂
3.若本合同与之前协议之条款有冲突,以本合床头柜一般多宽
同为准.
开胃山药contract are part of this contract, both parties need agreed with it.“General Terms and Conditions - Standard Equipment”
This file been kept in:
deliver parts to MES plant.
3.If there is conflict between this
contract and other
男生抱女生contract/agreement before, this
contract shall prevail.
为了保证首样和量产日期,我们达成以下一致意见:
To ensure the initial sample and launch deadlines are adhered to, the following procedure is hereby agreed:
1.)具体开模时间Detailed tooling dates
您的合同确认必须包含以下信息:
Your contract confirmation must include the following details:
模具设计的开始日期Start of tool design
零件模具设计调整(不包括发生费用的模具修改)的日期
Date by which design modifications on the parts do not incur tool-change expen
展示产品和模具布局Prentation of tooling and production concepts
模具开始制造的最后日期Last date for start of tooling manufacture
模具结束制造的日期Tool completion
展示有效过程控制的初始样品时间Initial sample prentation with proof of process capability
METHODE乐意接受任何与时间节点问题相关的提醒
METHODE is to be notified voluntarily of any problems with deadlines
基于技术可行性的模具维护计划
Evidence of tooling maintenance planning in accordance with the state-of-the-art
绿色技术创新我们将择机参观你们公司并监督工具和模具的制造进度。如果你们分包了模具制造,我们希望也能够去你们分包商那里监督进度。
4英文
We will take the opportunity to visit your company and monitor the progress of work on the tools & dies. If you subcontract the manufacture of tools, we assume that we will also be able to monitor progress at your contractor's facility.
2.) 控制规划  Control planning
一旦你决定了产品和模具的布局,你必须要举行一个技术会议向我们METHODE介绍你是如何构思模具外形尺寸和位置精度的,以及哪里必须和可能需要图纸变更和测试上达成一致。在你设计工具和模具以及实施序列化生产控制计划的时候,必须要确认尺寸精度与产品规格要求严格保持一致。
Once you have determined the production and tooling concept, a technical meeting is necessary to allow you to explain to us the conceived tooling condition shape and position tolerances and, where necessary and possible, drawing modifications and agreements on testing.
When designing tools & dies and performing control planning for ries production, it is esntial to ensure absolute adherence to dimensional accuracy taking into account production-specific requirements.
3.) 初始样品测试Initial sample testing

本文发布于:2023-07-30 00:18:50,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/82/1123134.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:模具   控制   时间   条款   生产   制造
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图