The content of this rvice document is the subject of intellectual property rights rerved by DNV GL AS ("DNV GL"). The ur accepts that it is prohibited by anyone el but DNV GL and/or its licenes to offer and/or perform classification, certification and/or verification rvices, including the issuance of certificates and/or declarations of conformity, wholly or partly, on the basis of and/or pursuant to this document whether free of charge or chargeable, without DNV GL's prior written connt.DNV GL is not responsible for the conquences arising from any u of this document by others.
The electronic pdf version of this document, available free of charge CLASS PROGRAMME
Approval of manufacturers
DNVGL-CP-0346Edition May 2016DNV GL approval of manufacturer scheme
冬天的日记
FOREWORD
DNV GL class programmes contain procedural and technical requirements including acceptance criteria for obtaining and retaining certificates for objects and organisations related to classification.
© DNV GL AS May 2016
Any comments may be nt by e-mail to
This rvice document has been prepared bad on available knowledge, technology and/or information at the time of issuance of this document. The u of this document by others than DNV GL is at the ur's sole risk. DNV GL does not accept any liability or responsibility for loss or damages resulting from any u of this document.
C
h a n g e s - c u r r e n t CHANGES - CURRENT
This is a new document.
C o n t e n t s
CONTENTS
Changes - current (3)
Section 1 General (6)
1 Introduction (6)
2 Objective (6)
3 Scope (6)
4 Application (6)
5 Abbreviations (6)
Section 2 Approval procedure (8)
相面学1 General (8)
2 Initial approval (9)
3 Renewal of the approval (10)
4 Extension or change of approved range (10)
5 Survey report (11)
6 Final approval report by manufacturer (11)
7 Evaluation by DNV GL (11)
8 Issuance of certificate (11)
9 Validity (12)
10 Suspension or withdrawal of certificates (12)
Section 3 Documentation requirements (13)
跆拳道段位
1 Introduction (13)
2 Approval report (13)
3 Statistics of previous production (13)
4 General documentation of manufacturing route and equipment (13)
居然拼音5 Manufacturing summary (13)
disc测试6 Manufacturer products specification (14)
茶文化ppt课件
7 Manufacturers’ own certificate form (14)
Section 4 Approval testing (15)
1 General requirements (15)动漫歌曲
2 Manufacture of test products (15)
3 Witnessing of approval testing (15)
4 Testing requirements (15)
5 Retesting (16)
C o n t e n t s Appendix A : Typical procedure to be followed to obtain initial approval of manufacturer (17)
漂亮的头像
Changes – historic (18)