写作业的作文完整版)人行道铺装施工组织设计
XXX
n One: n of Sidewalk Bricks and XXX
1.n n
广东猪脚姜The mechanical equipment includes a PC200 excavator。a bulldozer。two 15T transport trucks。and a water truck.
2.n Steps
1) The n of sidewalk bricks and curbstones should be carried out according to the design XXX and the n of the center stake。and the XXX.
2) The height difference XXX.
画角
3) Depending on the n on-site。the n XXX circumstances。a wind drill team should be ud to drill holes in the sidewalk bricks point-to-point to make them crack.
4) The excavator should be ud to load and XXX.
3.Safety Measures
XXX n。the following measures will be XXX:
1) Traffic safety warning signs should be t up 150 meters and 50 meters away from both ends of the n n。and the n site should be marked with "n site。slow down" and "n site。no entry for idle people"。There should be no XXX.
2) There should be one full-time safety officer at each end of the n n。and the on-site n XXX for safety。n should be XXX-XXX.
开会照片>女人爱爱
3) The site should be compresd。and the XXX should follow the steps of the excavator。with front XXX large stones on both sides of the road should be piled up in a XXX.
4) XXX should be XXX XXX.
5) XXX d of the half-width road surface。and safety XXX.
4.Civilized n and XXX
1) XXX vehicles。and no waste should be dumped along the road or in other XXX normal traffic on the old road after XXX.
2) XXX。and random stacking XXX.
3) XXX。and water trucks should be equipped to keep the XXX n environment。natural environment。and social XXX.
爱的告别式n Two: Sidewalk Brick Paving Special Plan
1.n XXX
细辛毒性
1) n Process
The n process of this project includes n n。mortar paving。road brick paving。shaping。and filling.