产品开发阶段名词解说

更新时间:2023-07-26 13:31:29 阅读: 评论:0

关于ETPT等缩写的解说
1)S-lot
S-lot is "Development trial".
开发试制
  Mainly,we will confirm the specification performance.
And we will check the quality of the part,too.

2)ET-lot
事与愿违的反义词ET-lot is "Engineering trial".
工厂试制
Mainly,we will confirm the asmbling performance.
And we will check the quality of the part,too.

3)PT1
PT1 is "production trial 1".
男性延时药哪个好
量产准备1
We will confirm all things for production.童年诗句
For exsample)Quolity,Asmbling performance,and so on. 周二快乐

青豆炒虾仁4)PT2
PT2 is "production trial 2".
立志的诗句量产准备2
This is the final trial stage.
蝴蝶怎么剪If some parts are bad in PT1,we check them in this stage.
This is the last confirmation stage before SOP.

5)SOP调休通知
SOP is "Start Of Production"
量产开始
SOP means "manufacture start".


6SOS
SOS is "Start of Sale"
销售上市

本文发布于:2023-07-26 13:31:29,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/82/1118260.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

上一篇:试航大纲
下一篇:ICON1
标签:试制   量产   解说   男性   青豆   诗句   通知
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图