Preamble to bill of quantities 清单序言 | ||
General Directions 总说明书 | 3 | |
Measurement 测量 | 3 | |
Pricing of Items 项目的定价 | 3 | |
Road works Overall Requirements 道路工程的总体要求 | 3 | |
Provisional Sums 暂定金额 | 4 | |
‘Lump Sum’ Items 包干的项目 | 4 | |
Abbreviations 缩写词 | 4 | |
BILL OF QUANTITIES 清单 | ||
BILL OF QUANTITIES SUMMARY 清单汇总 | 6 | |
Bill 1: Preliminaries 预备 | 7 | |
Bill 2 : Site Clearance 清理场地 | 8 | |
Bill 3 : Earthworks 土方工程 | 9 | |
Bill 4 : Pavement Works 路面工程 | 10 | |
Bill 5 : Bridge Works 桥梁工程 | 11 | |
Bill 6 : Culverts 涵洞 | 12 | |
Bill 7 : Provisional Sums 暂定金额 | 13 | |
BOQ details 清单明细 | 14关于梦想的词语 | |
METHOD OF MEASUREMENT晶莹透亮 测量方法 | ||
SECTION 100: PRELIMINARIES 预备 | 20 | |
Item 1.01: Performance curity 履约保函 | 18 | |
Item 1.02: Provision of Insurances 提供保险 | 18 | 六传六习|
Item 1.03: Contractor’s Office 承包商办公室 | 18 | |
Item 1.04: Maintenance of Contractor’s Office 承包商办公室维护 | 18 | |
Item 1.05: Removing Contractor’s office 拆除承包商办公室 | 18 | |
Item 1.06: Re-instatement of borrow areas 处置借土区 | 18 | |
Item 1.07: Signboards 告示牌 | 19 | |
SECTION 200: QUALITY CONTROL 质量控制三大丘陵 | 20 | |
SECTION 300: SETTING OUT 测量放线 | 21 | |
SECTION 400: SITE CLEARANCE 场地清理 | ||
Item 2.01: General Site clearance 一般场地清理 | 22 | |
Item 2.02: Cutting trees 砍树 | 武侠风22 | |
Item 2.03: Dismantling stone masonry/concrete(plain/reinforced) 拆除石头/砼(素/钢筋) | 22 | |
Item 2.04: Dismantling timber structures 拆除木制结构 | 22 | |
Item 2.05: Dismantling pipes, guard rails, kerbs etc. 拆除管线、护栏和路缘石 | 23 | |
SECTION 500: EARTHWORKS 土方工程 | ||
Measurement of earthworks 土方工程的测量 | 24 | |
Item 3.01: Excavation, haulage and spreading of topsoil 挖掘、运输、表层土撒布 | 24 | |
Item 3.02: Preparation of existing ground below embankment 准备原有低于地面的路基 | 24 | |
Item 3.03: Earthwork in excavation 土方开挖 | 24 | |
Item 3.04: Construction / Widening of embankment with material from borrow areas.用借土区的材料建设/加宽路基 | 25 | |
Item 3.05: Compaction of fill for embankment / Sub Grade 路基夯实 | 25 | |
Item 3.06 Construction of road side drain / Mitre drains / catch water drains 建设路边排水沟/ | 鱼子酱怎么吃才正确 26 | |
Item 3.07: Reshaping of road side drains / Mitre drains 路边排水沟整形 | 26 | |
Item 3.08: Construction of Scour Checks | 26 | |
Item 3.09: Construction of improved Sub-grade | 26 | |
SECTION 600 & 700: PAVEMENT WORKS 路面工程 | ||
Item 4.01: Gravel Sub-ba 碎石基层 | 28 | |
Item 4.02: Steep slope treatment 陡坡处理 | 28 | |
SECTION 800: CONCRETE WORKS 砼工程 | ||
Item 5.01: Excavation for structures 结构开挖 | 30 | |
Item 5.02,5.03, 5.04 &5.5: Cast in place concrete 现浇混凝土 | 30 | |
Item 5.06: Reinforcement 钢筋 | 31 | |
Item 5.07: RCC Culverts 钢筋混凝土涵洞 | 31 | |
SECTION 900: MISCELLANEOUS | ||
Item 5.07: Elastomeric bearing | 32 | |
Item 5.08 & 5.09: Filter Media & Back fill | 32 | |
Item 5.10: Filler type expansion joint | 32 | |
Item 5.11: Drainage spouts | 33 | |
DAYWORK SCHEDULE 日工表 | ||
General 一般 | 34 | |
Daywork: Labour 日工:劳动力 | 34 | |
Daywork: Materials 日工:材料 | 34 | |
Daywork: Contractor’s Equipment 日工:承包商设备 | 34 | |