工程建筑词汇翻译(中英对照)

更新时间:2023-07-24 22:59:26 阅读: 评论:0

    Preamble to bill of quantities 清单序言
General Directions 总说明书
3
Measurement 测量
3
Pricing of Items 项目的定价
3
Road works Overall Requirements 道路工程的总体要求
3
Provisional Sums 暂定金额
4
‘Lump Sum’ Items 包干的项目
4
Abbreviations 缩写词
4
BILL OF QUANTITIES 清单
BILL OF QUANTITIES SUMMARY 清单汇总
6
Bill 1:  Preliminaries 预备
7
Bill 2 :  Site Clearance 清理场地
8
Bill 3 :  Earthworks 土方工程
9
Bill 4 :  Pavement Works 路面工程
10
Bill 5 :  Bridge Works 桥梁工程
11
Bill 6 :  Culverts 涵洞
12
Bill 7 :  Provisional Sums 暂定金额
13
BOQ details 清单明细
14关于梦想的词语
METHOD OF MEASUREMENT晶莹透亮 测量方法
SECTION 100:  PRELIMINARIES 预备
20
六传六习武侠风
Item 1.01:  Performance curity 履约保函
18
Item 1.02:  Provision of Insurances 提供保险
18
Item 1.03:  Contractor’s Office 承包商办公室
18
Item 1.04:  Maintenance of Contractor’s Office 承包商办公室维护
18
Item 1.05:  Removing Contractor’s office 拆除承包商办公室
18
Item 1.06:  Re-instatement of borrow areas 处置借土区
18
Item 1.07:  Signboards 告示牌
19
SECTION 200: QUALITY CONTROL  质量控制三大丘陵
20
SECTION 300: SETTING OUT  测量放线
21
SECTION 400: SITE CLEARANCE 场地清理
Item 2.01:  General Site clearance 一般场地清理
22
Item 2.02:  Cutting trees 砍树
22
Item 2.03:  Dismantling stone masonry/concrete(plain/reinforced) 拆除石头/砼(素/钢筋)
22
Item 2.04:  Dismantling timber structures 拆除木制结构
22
Item 2.05:  Dismantling pipes, guard rails, kerbs etc. 拆除管线、护栏和路缘石
23
SECTION 500: EARTHWORKS 土方工程
Measurement of earthworks 土方工程的测量
24
Item 3.01: Excavation, haulage and spreading of topsoil 挖掘、运输、表层土撒布
24
Item 3.02: Preparation of existing ground below embankment 准备原有低于地面的路基
24
Item 3.03: Earthwork in excavation 土方开挖
24
Item 3.04: Construction / Widening of embankment with material from borrow areas.用借土区的材料建设/加宽路基
25
Item 3.05: Compaction of fill for embankment / Sub Grade 路基夯实
25
Item 3.06 Construction of road side drain / Mitre drains / catch water drains 建设路边排水沟/
鱼子酱怎么吃才正确
26
Item 3.07: Reshaping of road side drains / Mitre drains  路边排水沟整形
26
Item 3.08: Construction of Scour Checks
26
Item 3.09: Construction of improved Sub-grade
26
SECTION 600 & 700: PAVEMENT WORKS 路面工程
Item 4.01:  Gravel Sub-ba 碎石基层
28
Item 4.02:  Steep slope treatment 陡坡处理
28
SECTION 800: CONCRETE WORKS 砼工程
Item 5.01: Excavation for structures 结构开挖
30
Item 5.02,5.03, 5.04 &5.5:  Cast in place concrete 现浇混凝土
30
Item 5.06:  Reinforcement 钢筋
31
Item 5.07: RCC Culverts  钢筋混凝土涵洞
31
SECTION 900:  MISCELLANEOUS
Item 5.07: Elastomeric bearing
32
Item 5.08 & 5.09: Filter Media & Back fill
32
Item 5.10: Filler type expansion joint
32
Item 5.11: Drainage spouts
33
DAYWORK SCHEDULE 日工表
十六天魔舞
General  一般
34
Daywork:  Labour 日工:劳动力
34
Daywork:  Materials 日工:材料
34
Daywork:  Contractor’s Equipment 日工:承包商设备
34
猪血

本文发布于:2023-07-24 22:59:26,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/82/1115396.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:拆除   承包商   建设
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图