STANDARD CONTRACT( 标准合同)

更新时间:2023-07-24 22:20:57 阅读: 评论:0

STANDARE CONTRACT
APPENDIX-C
SCHENGULE OF QUANTITIES, PRICING AND PAYMNET CONDRRIONS
1.0 WORK TO BE PERFORMED
Except as specified elwhere in the Contract, except for the Employer supplied material and equipment as detailed in the Scope of Work, Contractor shall supply all the materials, labor, technical support, supervision, tools, equipment and plant, transportation, consumable and perform all the works required for completion of decoration work of Continent supermarket Fuangzhuang Fengtai district, Beijing for employer. The construction area of the work is M2 more or less.
2.0 LUMP SUM PRICE
The Total Lump Sum Price for performing all work is temporarily
RMB 3,000,000.00Yuan, Say: RMB three million YUAN only (It is depend on the actual work performed by the contractor under the mutual agreement)
Price Notes
The lump Sum Price includes, but not limited to, the cost of  works, taxes and charges, overhead and profit and all the expens which could be required by Contractor for the completion of the Works under the Contract. Unless there will be change in the Scope of Wok shown by the current drawings, no variation daim will be entertained.
3.0 UNIT PRICES FOR CHANGES
Unit prices for changes shall be full and complete compensation for additional work or credit for deleted work. Prices include but not limited to, labor, material, rvices, overhead and profit. The Unit Prices shown in the bid package submitted earlier will be ud as a reference basis in evaluating future variations. Tho items of variation which do not have reference basis shall be priced in accordance with quota.
健康的生活英文4.0 ADJUSTMENTS
All prices are fixed for the duration of the Contract and are not subject to escalation for any cau. Payment of the Total Contract Price shall constitute full payment for performance of the Work and covers all costs of whatever nature incurred by Contractor in accomplishing the Work in accordance with the provisions of the Contract.
5.0 山茶花的养殖方法和注意事项REOUIRED SUBMITTALS
The following submittals are a prerequisite to the initial payment after the award of contract;
上嘴唇翘5.1 Contract Schedule
5.2 Execution Plan
6.0 TERMS AND CONDITIONS OF PAYMENT
6.1 The total sum value is temporarily RMB3,000,000.00.(Say: three million RMB yuan on
ly), Contract singed after and satisfying the conditions of down payment; Pay 30% of contract sum (RMB9000,000.00Yuan, Say: nine hundred thousand RMB Yuan for preparation fee);
6.2 40% finished :Pay 30% of contract sum (RMB600,000.00 Yuan, Say: nine hundred thousand RMB Yuan);
6.3 80% finished: Pay 20% of contract sum ( RMB6000,000.00 Yuan, Say: six hundred thousand RMBYuan);
are的过去式6.4 after final checking by employer, government,. The actual construction cost will be checked and confirmed by party A, party B, and supervisory company. The rest 15% to be paid after final checking. The principle as following;
目标的重要性
6.4.1 According to Beijing 96 Budget Price Book.
6.4.2 Becau it is night work, so the civil engineering labor fee is RMB40.00/day, the installation labor fee is RMB30.00/day. And the night work cut down efficiency fee can not
教人be charged.
6.5 Maintenance fee 5%of contract sum will be paid after one year of maintenance. For the progress payment, the Contractor shall submit to Employer his written request supported by a statement of accomplishment for review, then the Site Manager assigned by the Employer shall review the payment request. The Site Manager shall endor payment request after review to Employer for relea of payment. The whole process from the submission of the written request to the relea of payment shall be within two weeks.
STANDARD CONTRACT
APPENDIXD-1 WORK SCOPE
This appendix D-1(hereinafter referred to as work scope)is made on the day of 1 June 2000
开心图片大全可爱1. General rules
Fangzhuang store modification and reconstruction should be performed strictly in accordance with demand of owner, the drawing, technical specification, some concerned rules and the provisions stipulated in the contract, the work performed should meet the following national standard《Architectural Installment Quality Checking Evaluation Unified Standard》(GBJ300-80)
Except the equipment supplied by the Employer and the equipment installed and tested by the special contractor assigned by the Employer, all the work scope implement must be carried on according to concerned rules of testing, adjustment and operation.文秘工作
2. Work scope
2.1 Construction modification (including main entrance and exit modification)
2.2 Electric system modification (including fresh area lighting fitting)(the lamp supplied by party A)

本文发布于:2023-07-24 22:20:57,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/82/1115366.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:注意事项   开心   重要性   文秘   方法   图片   目标   工作
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图