土建移交精装工作面交接单

更新时间:2023-07-24 05:58:51 阅读: 评论:0

土建移交精装工作面交接单
XXX
Record Number: Project Name
n Unit
张智源n Unit
XXX
雨后天空Brief n
XXX project for No。1262 Yan'an West Road
XXX。Ltd.
茯苓作用Shanghai Yanlong
青椒炒香肠
n areas from the first to the fifth floor of Building 15 (excluding the roof)
XXX
Partial handover。a total of
维新派Unfinished n
男虎女龙婚姻相配好吗n: XXX n work。all materials have been cleared。all garbage has been cleared。XXX。
The first to fifth floors of Building 15 and all safety measures (excluding the roof) have been handed over。Maintenance of all safety measures。XXX。safety and civilized n management of workers。n site cleaning。and material stacking in Building 15 are XXX。
The XXX on each floor are in place and intact。all floor openings are clod and protected。the lighting is in place and intact。and there are no XXX
XXX is in place。and the protective measures are intact.
Agree to XXX
Disagree to XXX
n Unit: n Unit: Handover n
XXX
n of responsibilities
XXX at the time of handover
XXX
寂寞轰炸XXX
XXX
Note: This article had no format errors or usly problematic paragraphs.
>甲鱼补什么

本文发布于:2023-07-24 05:58:51,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/82/1114055.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:精装   相配   茯苓   香肠   移交   男虎   工作面   婚姻
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图