手动单梁起重机安装检验记录
Hand Operated Single Beam Crane
Installation Inspection Record
工程名称:
Project Name:
单位工程名称:
Unit Name:
Description Item No.
Model Lifting
Capacity t Span m
Manufacturer Working
Duty Lifting Height m
Rail Length m Installation
Position
Working Environment
Sketch Showing Locations of Check Points
Unit: mm Inspection Item Allowable Value Actual Value Conclusion Crane Span, S
Relative Difference between Span S1 and S2,|S1-S2|
Relative Difference between Diagonal L1 and L2,|L1-L2|
Girder Camber, F
Remarks:
Conclusion:
Owner/Supervision Contractor General Contractor Construction Contractor
Discipline Engineer: Date: Discipline Engineer:
Date:
Foreman:
Quality Inspector:
Discipline Engineer:
生活的真谛Date:
416
拔丝茄子
SH/T 3503—J803
手动双梁起重机安装检验记录
Hand Operated Double Beam Crane
Installation Inspection Record
工程名称:
Project Name:
单位工程名称:
Unit Name:
Description Item No.
Specification &
Model
Lifting
Capacity t Span m
Manufacturer Working Duty Lifting Height m Rail Length m Installation
Position Working Environment
Sketch Showing Location of Check Points Unit: mm
Inspection Item Allowable Value Actual Value Conclusion Crane Span, S
出没风波里
Relative Difference between Span S1 and S2,|S1-S2|
Girder Camber, F
Relative Difference between Diagonal L1 and L2,|L1-L2|
Trolley Rail Gauge, K
Relative Difference between Trolley Rail Gauge K 1 and K 2,|K1-K2|
Remarks:
Conclusion:
Owner/Supervision Contractor General Contractor Construction Contractor
Discipline Engineer: Date: Discipline Engineer:
Date:
Foreman:
Quality Inspector:
励志文章短文
Discipline Engineer:
Date:
417
SH/T 3503—J804
手动单梁悬挂起重机安装
检验记录
陪伴教育Hand Operated Single Beam Suspending
Crane Installation Inspection Record
工程名称:
Project Name:
单位工程名称:
Unit Name:
Description Item No.
Specification &
Model
Lifting Capacity t Span m Manufacturer Working Duty Lifting Height m
Rail Length m Installation
Position
Working
Environment
Sketch Showing Location of Check Points
Unit: mm
Inspection Item Allowable Value Actual Value Conclusion Crane Span, S
Relative Difference between Span S1 and S2, |S1-S2|
Girder Camber, F
Relative Difference between Diagonal L1 and L2,|L1-L2|
Girder Side Deflection, f
Remarks:
Conclusion:
Owner/Supervision Contractor General Contractor Construction Contractor
Discipline Engineer: Date: Discipline Engineer:
Date:
Foreman:
Quality Inspector:
拉黑和删除有什么区别Discipline Engineer:
Date:
418
荣事达冰箱怎么样

本文发布于:2023-07-24 05:34:04,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/82/1114009.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:安装   工程   起重机   手动   检验   名称   短文
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图