Contract No.
Method Statement
Document Ref. No.:
Document Title:
`
Reviewed By S/C’s DHK Internal Review Prepared
By Safety
Rep(For
SI Only)
QA
Rep(For
QASI
Only)
Reviewed & Endord By
DHK Internal
Approval
External
Review and
Approval
COMPANY NAME POSITION SIGNATURE DA TE
DOCUMENT STATUS
Detail of Review
Revision Rev. Date Sections Amendment Source And /Or Detail
Status of Page Revision
Page No A B C Page No A B C
Contents
Item Description Page No Cover
Document Status
Contents
Preliminaries
SECTION 1-GENERAL
1.Introduction
SECTION 2- MAJOR CONSTRUCTION
1. General
2. General Construction Sequence
3. Access/ Transportation
4. Site Condition At Erection Point
5. Height Restriction家务手抄报
6. Hoisting Method
7. Stability Check
8. Working Platforms / Safety Access
SECTION3- METNOD / CONSTRUCTION / INSTALLATION
SEQUENCE
1. Preliminary Works
2. Survey Check
安全生产方案3. Adjustment
4. Installation Procedure (Column/ Beam At East Concour&MPH)
SECTION4-INSPECTION AND TESTING
1. Inspection And Test Plan元宵节舞龙
2. TWC and CE Checking Requirement
SECTION 5-SAFETY, RISK ASSESSMENT & ENVIRONMENTAL
疲惫的心1. Safety
2. Risk Asssment
3. Environmental Management Plan
APPENDIX
Appendix 1
Appendix 2
Appendix 3
Appendix 4
Appendix 5
Appendix 6
Appendix 7
Appendix 8
Appendix 9
Appendix 10
Appendix 11
Appendix 12
Preliminaries
Column &beam erection method statement review
I have completed a review of this column & beam erection method statement and recommend it for u on the erection of the structural steelwork for the international exhibition center at Hong Kong Airports.
Project engineer
Column & beam erection method statement approval
心开头成语I approve this column & beam erection method statement and recommend it for u on the erection of the structural steelwork for the international exhibition center at Hong Kong Airports.
Deputy project mangager
Distribution
DHK
File
References:
a.ISO 9001:2000
SECTION 1 – GENERAL
1.Introduction
1.1 has been awarded the sub-contract to fabricate, deliver and erect approximately tons for structural steelwork for . this method statement for “column & beam erection “particularly explains the installation procedures for Columns & Beams Erection in the East Concour and Multi-Purpo Hall.
我方为项目的钢构加工、运输和安装分包。本文为东部广场及综合大厅的梁柱安装程序的施工组织设计。
爱小动物SECTION 2- MAJOR CONSTRUCTION CONSIDERATIONS 主要施工设想
1.General
才敢与君绝一般
1.1 an organization chart identifying all key personnel is at appendix 1. the duties
of all key personnel shall refer to project quality plan.
主要人员的组织设计机构图见附录1,各主要人员的职责参见项目质量计划。
1.2the works described in this method statement includes the preliminary works,
general steel columns and beams in the east concour and multi-purpo hall. A general site plan identifying all relevant work areas is at appendix 2.
插入图
本施工组织设计的工作描述包括东部广场及综合大厅主要钢柱及钢梁的准备工作。现场平面图见附录2。
1.3The construction quences stated in this document outline a general idea for the
erection quence for different structural elements. The quences are bad on the sub-contract
master programmer but the actual construction quences are subject to amend according to the actual site situation.
本文中的施工程序概括了不同钢构的安装工序。此安装程序是基于分包程序要求,但也可按现场实际情况做相应调整。
1.4Documents related to this method statement are as follows:
相关文件包括:
a.permanent formwork installation method statement for structural steelwork
Ref: IEC/ST02/MS/ST/GE/0014
钢结构永久性框架的安装计划
高强握力螺栓装配计划
防火喷涂的施工计划
膨胀油漆的施工组织设计
e.painting method statement for structural steelwork