5CHA1M09C Doc.No. :XYZ / QA / 01
Rev.No. :00Eff.Date :
21-12-09
Fresh / Repetitive : Complaint No :后脑勺反骨
Batch Code Affected : D 1D 2STATUS OF ACTION TAKEN Sl.No
1D 3 TEAM FORMED
#
Contact No
1DESIGN & CONCEPTS 2MOULDS & TOOLS 3ANALYSIS & VALIDATION 4MATERIAL INSPECTION 5
IN PROCESS Q C
D3 /1PROBLEM STATEMENT (Problem description) :
D3 /2Sl.No
Yes
No
D3/3#Yes
No
1a 2a 3a 4
a
Part No.& Description :Prior to despatch
Nil
a
CORRECTIVE ACTION REPORT
Ud for resolving
Customer Complaints / Process & Product Audits / Rework / Scrap / DMP points
ISSUE REPORTED:(Fill here the effect of the problem on customer)
包饺子活动方案
Source of problem :Internal / External
F2209000 / Combination Switch
Category: (Severity)
Circle the lected category .
/ B / C / Z
XYZ Engineering
REASON FOR SENDING 'NOT OK' PARTS : Could not identify the problem during testing
Customer end
金型人
Concern Where should the non conforming parts have been detected ? ( Choo from the 4 choices given below)INITIAL ANALYSIS
Area
Remarks If Any
1
Lot qty
Ok qty
Name
THE FUSE IN THE VEHICLE WAS FOUND BURNING FREQUENTLY WHEN WIPER SWITCH WAS OPERATED
QC
QC TOOL ROOM Comment/Result
Dept
70 Nos Mfg date & shift
When Obrved Designation 25-11-09
25-11-09
16 / 2009-10
SKETCH / PHOTO
Fresh
ACTION TAKEN
EFFECTIVE %
友情的花
DATE IMPLEMENTED
Have the concern/symptoms appeared in the past part history?.
QTY AFFECTED : 70 Nos
萨摩耶怎么养Mr. GHI
During Process/manufacture
After manufacture(e.g Final inspection)26-11-09
1. REPLACEMENT MATERIALS ARE GIVEN TO COMPENSATE THE DEFECTIVES.
2. 100% SWITCHES ARE BEING INSPECTED & ONLY DEFECT FREE COMPONENTS ARE SUPPLIED.阿克苏人口
Mr. DEF The moving contact in the wiper switch gets short circuited with two live fixed contacts in OFF position to Wiper 1 and vi versa.
1. THE FUSE BURNS & WIPER DOES NOT FUNCTION.
2. THE SWITCH FAILS TO MEET THE SPECIFICATION REQUIREMENTS.
3. DISSATISFACTION OF THE END USER.
Mr. PQR R & D Ms. HER PROBLEM (Symptom description)
THE FUSE IN THE VEHICLE WAS FOUND BURNING FREQUENTLY WHEN WIPER SWITCH IS OPERATED
八五砖250 Nos 180 Nos IMMEDIATE RESPONSE ACTION
2009-10-11
Not OK qty
100%Mr. ABC R & D A BEFORE
Terminal 1 & 3 short due to shorter ribs
回师
5CHA1M09C