06_Operation

更新时间:2023-07-18 18:35:44 阅读: 评论:0

Heavy Duty Gas Turbine Operation
中考满分作文大全2/
GE /
Operator Responsibility
The operator must be aware of the power plant devices which are tied into the gas turbine mechanicaly
《稻草人》全文and electrically and could affect normal operation.General Operating Precautions
•Temperature limits
•Pressure limitsrow的过去式
•Vibration limits
•Load limit
•Fire protection system O.P.
•Combustion system O.P.
•Cooldown and Shutdown陌上花开可缓缓归矣
十月八号是什么星座金的繁体字4/
GE /
High wheelspace temperature may be caud by any of the following faults:
廉洁自律证明•Restriction in cooling air line
•Wear of turbine als
•Excessive distortion of the turbine stator
•Improper positioning of thermocouple
•Malfunctioning combustion system
•Excessive distortion of exhaust inner diffur
水瓶简笔画
Check wheelspace temperatures very cloly on initial strat up
5/
GE /
Temperatures in excess of the maximum are potentially harmful to turbine Hot-Gas-Path parts over a prolonged period of time.High wheelspace temperature reading must be reported to the Nuovo Pignone technical reprentative as soon as possible.

本文发布于:2023-07-18 18:35:44,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/82/1103550.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:作文   稻草人   星座   简笔画   中考   全文   八号
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图