8.5.6.1.1 过程控制的临时更改 【SI-11:2018-07】-IATF16949条款解读

更新时间:2023-07-15 15:31:55 阅读: 评论:0

8 运行
8.5生产服务提供
8.5.6.1.1过程控制的临时更改【SI-11:2018-07】组织应识别过程控制手段,包括检验、测量、试验和防错装置,形成文件化的清单并予以保持,清单包含主要过程
蒜台
主要过程控制和已批准的备份或替代方法,如果存在备份或替代方法。
泳池
组织应有一个形成文件的过程,对替代控制方法的使用进行管理。组织应基于风险分析(例如FMEA )和严重程度,在本过程中包含要在生产中实施替代控制方法之前获得的内部批准。
幼儿园中班春季学期工作计划
在发运采用替代方法检验或试验的产品之前,如有要求,组织应获得顾客批准。组织应保持一份控制计划中提及的经批准替代过程控制方法的清单并定期评审。
每个替代过程控制方法应有标准的工作指导书。组织应至少每日评审替代过程控制手段的运行,以验证标准作业的实施,旨在尽早返回到控制计划规定的标准过程。方法范例包括但不限于:
a)以质量为关注的每日审核(如:分层过程审核,如
幼儿园会议记录
汉字谜语大全
适用);
b)每日领导会议
基于严重程度,并在确认防错装置或过程的所有特征得以有效恢复的基础上,在规定时期内对重新启动验证形成文件。
在使用替代过程控制装置或过程期间,组织应实现生产的所有产品的可追溯性(如:验证并保留每个班次的首件和末件)。
8 Operation
8. 5 Production and rvice provision
8. 5.6 .1 .1 Temporary change of process controls
The organization shall identify,document,and maintain a list of the process controls,including inspection,measuring,test,and error-proofing devices,that includes the primary process
list of process controls shall include the primary process controls and the approved back-up or alternate methods, if back-up or alternate methods exist.
个人教学计划The organization shall document the process that manages the
u of alternate control methods. The organization shall include in this process,bad on risk analysis(such as FMEA),verity,and the internal approvals to be obtained prior to production implementation of the alternate control method.
Before shipping product that was inspected or tested using the alternate method,if required,the organization shall obtain approval from the customer(s). The organization shall maintain and periodically review a list of approved alternate process control methods that are referenced in the control plan.
Standard work instructions shall be available for each alternate process control method. The organization shall review the operation of alternate process controls on a daily basis,at a minimum,to verify implementation of standard work with the goal to return to the standard process as defined by the control plan as soon as possible. Example methods include but are not limited to the following:
a)Daily quality focud audits(e.g., layered process
audits,as applicable);
b)Daily leadership meetings.
Restart verification is documented for a defined period bad on verity and confirmation that all features of the
error-proofing device or process are effectively reinstated.
The organization shall implement traceability of all product produced while any alternate process control devices or process are being ud(e.g.,verification and retention of first piece and last piece from every shift)
凤凰画法
不管是内部提出的变更,还是外部提出的变更,都要得到客户批准,特别是产品相关变更,如产品结构、材料、性能和功能。工艺变更要征求客户意见,如果在保证品质和安全的情况下,可不知会客户,但公司内部要验证评审变更的可行性。
认证审核容易失控点:
①工程变更没有评审到变更造成的影响。
②客户满意度监控没有监控超额运费和市场退货。
③客户投诉没有用客户指定的方式回复,如8D。静影沉壁
④临时控制没有SOP。

本文发布于:2023-07-15 15:31:55,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/82/1098071.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。