完整版)工程客户满意度调查分析表
Engineering XXX
Number:
n Unit:
Project Name:
XXX:
周作人散文n Level:
Very Satisfied。Satisfied。Average。Dissatisfied。Very Dissatisfied
70 and below
Sequence:
1.Timeliness and accuracy of XXX
暑期活动XXX with the progress plan
XXX sufficient
Whether the key process control during XXX
2.Handling of problems after the fact青少年教育基地
Quality of sub-projects
Safety and civilized measures and pre-control plans
XXX work measures
3.n of capabilities
高跟鞋摄影XXX
XXX
XXX
4.Engineering usage XXX
5.XXX
6.Post-XXX
7.XXX
XXX:
Customer reprentative: (Ur al) Disposal and reply status:
XXX:
Project:
Investigator: Date:
XXX
n Unit:
Project Name:
XXX:
n Level:
90 and above
85 and above
80 and above
75 and below
70 and below
Sequence:
葡萄种植技术
1.Engineering usage XXX
2.XXX
3.Post-XXX
4.XXX
XXX:
Customer (Supervisor) reprentative: (Ur al) Investigator: Date:
Engineering XXX
XXX: Date
XXX): XXX):
Secondary Indicators
Customer XXX
Tertiary Indicators
Overall
Quaternary Indicators
XXX/rvice quality (including quality standards。rvice methods。etc.) XXX when compared to what was hoped for.
Very Satisfied。Satisfied。Average。Dissatisfied。Very Dissatisfied
n documents (including ns。n approval。n n design。special technical schemes。etc.) XXX.
XXX。scientific。safe。XXX.
XXX controlled according to the plan and XXX.
XXX.
成都银杏XXX the technical data。such as n (n) drawings。XXX.
XXX after the project is put into n according to XXX.
XXX contract price agreed upon by the customer.
李叔同名言Whether the price or cost is reasonable compared to the same or different industries under the same quality ns.
XXX.
Comparison of n/rvice quality with the us year (or the same industry).
XXX n site is safe。civilized。clean。and orderly。with no barbaric n phenomena。and no n (noi) to the surrounding environment.