The Bidder Price for the Scope of SERVICES defined in Exhibit I is ALL INCLUSIVE lump sum price USD.
1.0 GENERAL TERMS
小书架
1.1. The bidder shall receive remuneration for the satisfactory execution of the work as t out below in
四大名著的读后感this bid. No payment shall be due by DPOC other than tho specifically mentioned in this bid. The Rates shall be applied in accordance with EXHIBIT III hereto.
1.2. The rates t out below shall be deemed to include all costs incurred by the bidder in connection with
this bid. Such Rates shall be deemed to cover such items as stipulated in GENERAL TERMS AND CONDITIONS, but not limited to, direct costs, the supply of catering and associated unit materials not supplied by DPOC under the terms hereof, replacement equipment, spare parts, together with all other items necessary for the proper execution of the work.
1.3. Rental Charge should be quoted on monthly rate. For periods less than one month, the Rental
Charge shall be calculated with 1/30 of the monthly rate and, fraction of a day shall be considered as one day if greater than 12 hours and neglected if less.赔偿协议书怎么写
怎样拍月亮1.5. Operating Charge should be quoted on daily rate and during this period the Rental Charges shal
l not
be apply. For periods less than one day, the Operating Charge shall be calculated with 1/24 of the daily rate and, fractions of an hour shall be considered as the hour if greater than 30 minutes and neglected if less.
治保
1.8. The Rental Charge shall commence on the day the equipment is delivered to the DPOC storage site
and shall cea on expiry date of the contract.
1.10. Mobilization and de-mobilization cost shall deem to be inclusive to all equipments in the Rental
Charges
1.11 DPOC shall have the right to reject any of the equipment offered by Bidder and Bidder shall replace
same at Bidder's sole cost. All rental rates shall remain firm throughout the term this Contract and any extension thereto.各种发型图片女
1.1
2. The Operating Charges shall commence on the day the Bidder Equipment after acceptance test at
引言的作用
the Work Site and shall cea when the said equipment is returned to the DPOC storage site.
1.13 Mobilization and de-mobilization cost shall deem to be inclusive to all equipments in the Operating
Charges
2.0 CONTRACT PRICE SCHEDULE