A.  General Information
Provide basic information about the project including: Project Title – The proper name ud to identify this project; Project Working Title – The working name or acronym that will be ud for the project; Proponent Secretary – The Secretary to whom the proponent agency is assigned or the Secretary that is sponsoring an enterpri project; Proponent Agency –The agency that will be responsible for the management of the project; Prepared by –The person(s) preparing this document; Date/Control Number –The date the plan is finalized and the change or configuration item control number assigned.
Project Title: Project Working Title:
Proponent
张飞穿针歇后语下一句是什么Secretary: Proponent Agency:
Prepared by: Date / Control Number:
五一劳动手抄报
厨艺大比拼B.  Funds Available
Provide the amount of funding identified in the Project Charter for each fund source category in the tables below.  Provide clear and specific reference for the source of funding within the categories listed.
音乐课英语
第1页,共6页
C.Planned Expenditures by WBS Element
Provide expen or cost breakdown for each WBS element by fiscal year and quarter using the expenditure categories below.  Balance expenditures at the WBS level with funds available in Section B.
腰痛怎么解决
第2页,共6页
虾滑煮多久
D.Contingency (Risk) Budgeting
The expenditures below are developed in the Risk Plan Section F and copied into this table.  The Tot
al Planned Contingency Expenditures must be balanced against the funds available identified in Section B.
第3页,共6页
E.  Planned Expenditures
Provide the total planned expenditures by year for the categories listed by summarizing Section C in this table.  Provide ments where necessary to clarify expenditures.  The totals are developed by balancing the estimated cost for all WBS Elements in a fiscal year against the available funding.
第4页,共6页
F.Project Spending Plan
In the columns below, document the spending plan by category for each quarter of the fiscal year.  Derive the estimates, using the tables in Sections C and D, by summing the cost for all WBS elements that occur during a particular quarter of a fiscal year.
第5页,共6页

本文发布于:2023-07-07 14:28:05,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/82/1083789.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:穿针   解决   歇后语   腰痛
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图