输变电工程施工合同英山220kv输变电工程

更新时间:2023-07-06 13:29:37 阅读: 评论:0

输变电工程施工合同英山220kv输变电工程
Contract for Construction of English Mountain 220kV Transformer Substation Project
Party A: Power Construction Corporation of China Hubei Electric Power Engineering Co., Ltd.
Party B: English Mountain Power Transmission and Transformation Co., Ltd.
Article 1 Project Overview
The English Mountain 220kV Transformer Substation Project is located in English Mountain, Jingzhou, Hubei Province, China. The project includes the design, construction, and installation of the substation and related facilities, as well as the commissioning and testing of all equipment and systems. The total investment for the project is estimated to be 50 million RMB.
对同学的祝福语Article 2 Contractual Obligations
Party A shall undertake the design, construction, and installation of the substation, and shall ensure that all work is carried out in accordance with the technical specifications, quality standards, and relevant regulations and codes. Party A shall also provide all necessary technical and operational support to ensure that the substation is commissioned and tested successfully.
Party B shall provide all necessary land, permits, and approvals required for the construction of the substation, as well as the necessary funds to cover the costs of the project. Party B shall also ensure that all necessary safety and curity measures are taken during construction and operation of the substation.
Article 3 Project Schedule
The construction of the substation shall commence on October 1, 2021, and will be completed by April 30, 2022. This includes the design, construction, installation, commissioning, and testing phas of the project.
Article 4 Payment Terms
军训小结500字The total project cost shall be 50 million RMB, which shall be paid by Party B to Party A in installments. The payment schedule is as follows:二百字
- 10% of the total cost to be paid upon signing the contract
- 30% of the total cost to be paid upon completion of the design pha
- 50% of the total cost to be paid upon completion of the construction and installation phas
- 10% of the total cost to be paid upon successful commissioning and testing of the substation
Article 5 Quality and Safety Standards
Party A shall be responsible for ensuring that all work carried out in the construction of the substation is of high quality and meets the necessary safety standards. Party A shall also ensure that all equipment and systems installed in the substation are tested and commissioned successfully, and that the substation is fully operational upon completion.
Party B shall ensure that all necessary safety and curity measures are taken during construction and operation of the substation, and shall bear the responsibility for any damages or loss incurred due to negligence or failure to meet safety standards.
Article 6 Dispute Resolution
Any disputes arising from the implementation of this contract shall be resolved through friendly negotiation between the parties. If no agreement can be reached, either party may refer the matter to a court of law for ttlement.
Article 7 Confidentiality
Both parties shall keep all information related to this contract confidential and shall not disclo it to any third party without the other party's written connt.
Article 8 Termination of Contract
This contract may be terminated by either party if the other party breaches any of the ter
ms or conditions of this contract. Termination shall be done in writing and shall take effect immediately upon receipt of the written notice.我的家
Article 9 Applicable Law and Jurisdiction
This contract shall be governed by and construed in accordance with the laws of the People's Republic of China. Any disputes arising from the implementation of this contract shall be ttled by the court in the jurisdiction where the project is located.
梦见打针Article 10 Contract Validity
This contract shall be effective from the date of signing and shall remain valid until the completion of the project and the successful commissioning and testing of the substation.
Party A: Power Construction Corporation of China Hubei Electric Power Engineering Co., Ltd.
Authorized Reprentative:
Signature:
Date:
Party B: English Mountain Power Transmission and Transformation Co., Ltd.
军机处的作用Authorized Reprentative:
火腿炖甲鱼
Signature:
Date:日本经营四圣

本文发布于:2023-07-06 13:29:37,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/82/1081815.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:英山   经营   小结   梦见
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图