1 General Provisions 一般规定
1.1
Definitions 定义  ..........  1.2
Interpretation 解释  .......  1.3
Communications 通信交流  ............................................  1.4
Law and Language 法律和语言  .......................................  20 1.5
Priority of Document 文件优先次序  ....................................  21 1.6
Contract Agreement 合同协议书  .......................................  21 1.7
Assignment 权益转让  ................................................  22 1.8
Care and Supply of Document 文件的照管和提供  .........................  22 1.9 Confidentiality 保密性 (23)
1.10 Employer ' s U of Contractor 's Docume 雇nt 主s 使用承包商文件 (24)
1.11 Contractor ' s U of Employer 's Docume 承nt 包s 商使用雇主文件 (25)
1.12 Confidential Details 保密事项 (26)
1.13 Compliance with Laws 遵守法律 (26)
1.14 Joint and Several Liability 共同的和各自的责任 ............................  27 2 The Employer 雇主  .. (28)
2.1
Right of Access to the Site 现场进入权  .................................  28 2.2
Permits, Licences or Approves 许可、执照或批准  .........................  29 2.3
Employer ' s personnel 雇主人员  .....................................  30 2.4
Employer ' s Financial Arrangements 雇主的资金安排  ....................  31 2.5 Employer ' s Claims 雇主的索赔  ......................................  31 3 The Employer ' s Administration 雇主的管理 (33)
3.1
The Employer ' s Reprentative 雇主代表  ............................  33 3.2
12月30日是什么星座
The Employer ' s personnel 其他雇主人员  .............................  34 3.3 Delegated Persons 受托人员  .. (34)
CONTENTSadd的名词
目录
8  .....  8  ...  18 19
3.4 Instructions 指示 (36)
3.5 Determinations 确定 (36)
4 The Contractor 承包商 (37)
4.1 The Contractor 's General Obligations承包商的一般义务 (37)
4.2 Performance curity 履约担保 (38)
4.3 Contractor 's Reprentative承包商代表 (41)
4.4 Subcontractors 分包商 (42)
4.5 Nominated Subcontractors 指定的分包商 (43)
4.6 Co-operation 合作 (43)防艾图片
4.7 Setting out 放线 (45)
4.8 Safety procedures 安全程序 (45)
4.9 Quality Assurance 质量保证 (46)
4.10 Site Data 现场数据 (47)
4.11 Sufficiency of the Contract Price 合同价格 (47)
4.12 Unforeeable Difficulties 不可预见的困难 (48)
4.13 Rights of way and Facilities 道路通行权于设施 (49)
4.14 Avoidance of Interference 避免干扰 (49)
4.15 Access Route 进场通路 (50)
4.16 Transport of Goods 货物运输 (51)
4.17 Contractor ' s Equipment承包商设备 (52)
4.18 Protection of the Environment 环境保护 (52)
4.19 Electricity, Water and Gas 电、水和燃气 (52)
4.20 Employer ' s Equipment and Free -Issue Material 雇主设备和免费供应的材料  53
4.21 Progress Reports 进度报告 (55)
4.22 Security of the Site 现场保安 (57)
4.23 Contractor ' s Operations on Site 承包商的现场作业 (58)
4.24 Fossils 化石 (59)
5 Design 设计. (60)
5.1 General Design Obligations 设计义务一般要求 (60)
5.2 Contractor ' s Documents承包商文件 (61)
5.3 Contractor ' s Undertaking承包商的承诺 (64)
5.4 Technical Standards and Regulations 技术标准和法规 (64)
5.5 Training 培训 (65)
5.6 As-Built Documents 竣工文件 (66)
5.7 Operation and Maintenance Manuals 操作和维修手册 (67)
5.8 Design Error 设计错误 (67)
6 Staff and Labour 员工 (68)
6.1 Engagement of Staff and Labour 员工的雇用 (68)
6.2 Rates of Wages and Conditions of Labour 工资标准和劳动条件 (68)
6.3 Persons in the Service of Employer 为雇主服务的人员 (69)
6.4 Labour Laws 劳动法 (69)
6.5 Working Hours 工作时间 (69)
6.6 Facilities for Staff and Labour 为员工提供设施 (70)
6.7 Health and Safety 健康和安全 (71)
6.8 Contractor 's Superintendence 承包商的监督 (72)
6.9 Contract or ' s Personnel 承包商人员 (72)
6.10 Records of contractor ' s Personnel and Equipmen承t 包商人员和设备的记
录 (73)
6.11 Disorderly Conduct 无序行为 (74)
故宫博物院课文7 Plant, Materials and Workmanship 生产设备、材料和工艺 (74)
7.1 Manner of Execution 实施方法 (74)
7.2 Samples 样品 (75)
7.3 Inspection 检验 (75)
7.4 Testing 试验 (76)
7.5 Rejection 拒收 (79)
7.6 Remedial Work 修补工作 (79)
7.7 Ownership of Plant and Materials 生产设备和材料的所有权 (80)
7.8 Royalties 土地(矿区)使用费 (81)
蛔虫对人体的危害8 Commencement,Delays and Suspension 开工、延误和暂停 (82)
8.1 Commencement of Works 工程的开工 (82)
8.2 Time for Completion 竣工时间 (82)
8.3 Programme 进度计划 (83)
8.4 Extension of Time for Completion 竣工时间延长 (85)
8.5 Delays Caud by Authorities 当局造成的延误 (86)
8.6 Rate of Progress 工程进度 (87)
8.7 Delay Damages 误期损害赔偿费 (88)
8.8 Suspension of Work 暂时停工 (89)
8.9 Conquences of Suspension 暂停的后果 (89)
8.10 Payment for Plant and Materials in Event of Suspension 暂停时对生产设
备和材料的付款 (90)
英国硕士预科8.11 Prolonged Suspension 托长的暂停 (91)
8.12 Resumption of Work 复工 (91)
9 Tests on Completion 竣工试验 (92)
9.1 Contractor ' s Obligations承包商的义务 (92)
9.2 Delayed Tests 延误的试验 (94)
9.3 Retesting 重新试验 (95)
9.4 Failure to Pass Tests on Completion 未能通过竣工试验 (95)
10 Employer ' s Taking Over 雇主的接收 (96)
10.1 Taking Over of the Works and Sections 工程和分项工程的接收 (96)
10.2 Taking Over of Parts of the Works 部分工程的接收 (98)
10.3 Interference with Tests on Completion 对竣工试验的干扰 (98)
11 Defects Liability 缺陷责任 (99)
11.1 Completion of Outstanding Work and Remedying Defects 完成扫尾工作和修补缺
陷99
11.2 Cost of Remedying Defects 修补缺陷的费用 (100)
11.3 Extension of Defects Notification Period 缺陷通知期的延长 (101)
11.4 Failure to Remedy Defects 未能修补的缺陷 (102)
11.5 Removal of Defective Work 移出有缺陷的工程 (103)
11.6 Further Tests 进一步试验 (104)
11.7 Right of Access 进入权 (104)
11.8 Contractor to Search 承包商调查 (105)
11.9 Performance Certificate 履约证书 (105)
11.10 Unfulfilled Obligations 未履行的义务 (106)
11.11 Clearance of Site 现场清理 (107)
12 Tests after Completion 竣工后试验 (107)
12.1 Procedure for Tests after Completion 竣工后试验的程序 (108)
12.2 Delayed Tests 延误的试验 (109)
12.3 Retesting 重新试验 (110)
12.4 Failure to Pass Tests after Completion 未能通过的竣工后试验 (110)
13 Variations and Adjustments 变更和调整 (112)
13.1 Right to Vary 变更权 (112)
13.2 Value Engineering 价值工程 (113)
13.3 Variation Procedure 变更程序 (114)
13.4 Payment in Applicable Currencies 以适用货币支付 (115)
13.5 Provisional Sums 暂列金额 (115)
13.6 Daywork 计日工作 (117)
13.7 Adjustments for Changes in Legislation 因法律改变的调整 (118)
13.8 Adjustments for Changes in Cost 因成本改变的调整 (119)
14 Contract price and Payment 合同价格和支付 (119)喝醋对身体有什么好处
营养师就业现状
14.1 The Contract Price 合同价格 (120)
14.2 Advance payment 预付款 (120)
14.3 Application for Interim Payments 期中付款的申请 (122)
14.4 Schedule of Payments 付款价格表 (124)
14.5 Plant and Materials intended for the Works 拟用于工程的生产设备和材料

本文发布于:2023-07-05 20:41:42,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/82/1080487.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:承包商   雇主   设备   竣工   工程
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图