HPAC Engineering,Dec 1, 2010
Office-Tower Hydronic Update
The heating or cooling-plant replacement at a Chicago office building features electric chillers and gas boilers, Located in the Chicago Loop, the Michael A. Bilandic Building is a 21-story office tower rving State of Illinois agencies, including the Illinois Supreme Court. In 1989, the existing building structure was gutted and renovated. At that time, a new top floor was added to hou major mechanical equipment, including three gas-fired, two-stage absorption chiller-heaters. Each unit had an output of 600 tons of cooling and 7,200 mbh of
谈话的英语华侨大学研究生heating. Dedicated dual-cell cooling towers with 20-hp high or low-speed fans were installed on the roof.
Since then, the chiller-heaters have been replaced with equivalent-capacity modular electric chillers and ts of duplex hydronic gas boilers. The update resulted in enhanced equipment reliability, easier maintenance, and, during the first year of operation, a 15-percent savings in measured thermal-energy u.
Out With the Old
The existing hydronic system clearly needed an update. With pumps mounted on the 21st floor in the vicinity of the chiller-heaters, four-pipe primary heating and cooling mains rved multiple variable-air-volume (VAV) air-handling units and perimeter radiant ceiling coils throughout the building. Hydronic return mains fed into four 30-hp primary heating pumps and four 40-hp chilled-water pumps. Three of each type pumped into the respective chiller-heaters, while the fourth heating and chilled-water pumps provided manual standby duty. Likewi, four 100-hp condenr-water pumps (which since have b
een replaced with 40-hp pumps) took in water from the cooling-tower supply header, pumped cool water into an absorption chiller, and returned hot condenr water to a dedicated cooling tower.
Becau of year-round u, one chiller-heater broke down after only about 16 years of uful life and became unrviceable. The building continued to sustain itlf comfortably on the remaining two functional chiller-heaters but no longer benefited from emergency standby capacity. The building's facility-management staff urgently replaced the old absorption chiller-heaters with new units, one at a time. Melvin Cohen and Associates Inc. was chon by the State of Illinois Capital Development Board to prepare design documents for bid and construction. Primera Engineers in Chicago was chon to provide commissioning.
Challenges Ahead
Absorption chiller-heaters are heavy, bulky machines that weigh up to 40,000 lb each. Replacing the chiller-heaters on the building's 21st floor required disasmbling the units 搓火
into smaller pieces for rigging by helicopter, creating a large opening in the roof, and procuring special permits to clo downtown streets around the building on veral occasions during the construction period. Further, the new absorption units were unavailable locally and required a minimum of six months of lead time before they could be shipped from Japan.
Given the urgency of the task at hand, the scenarios were daunting. Additionally, absorption chiller-heaters are not well-known for thermal efficiency. Therefore, a new approach was needed. One option was to u modular electric chillers and modular gas boilers that could be transported via the building's freight elevator. Although convenient, obtaining the vast amount of new electric power needed on the top floor as well as guaranteeing a proper fit for all of the required modular equipment within the space vacated by the old absorption units, would have been difficult. However, building surveys indicated that existing 480-v electric switchboards in the bament had the sufficient physical and electrical capacity available to rve new power needs. It also was feasible to run new power rirs from the bament switchgear room up to the 21st floor, and suffi让我拥有你
煤改电补贴政策
cient storage space was available to expand the existing chiller-heater room if necessary. This strategy generally was acceptable to the project team.
竹篮子打水一场空
Final Design and Construction
The three old gas-absorption chiller-heaters each were replaced (in three distinct contiguous phas) with a bank asmbly of eight modular electric chillers rved by existing spare 800-amp bolted pressure switches in the bament's existing switchgear. Power feeders were extended from each bolted pressure switch to a modular chiller bank on the 21st floor.
At 28 in. by 49 in. by 69 in. and 2,200 lb, the chillers feature two 35-ton, R-410a scroll compressors (with independent refrigerant circuits) and stainless-steel plate heat exchangers. Each chiller-bank asmbly was accompanied by two duplex gas-fired boilers for replacement heating. At 39 in. by 41 in. by 85 in. and 2,400 lb, the boilers feature 2,640-mbh output and a variable-frequency-drive (VFD) forced-draft burner.

本文发布于:2023-07-02 03:46:31,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/82/1073388.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

下一篇:专业术语
标签:简笔画   养殖   补贴   打水   政策   一场空
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图