索引
A B C D E F G H Istaff复数 J K L M N O P Q R S T U V W X Y Z
@
A
∙Acceptable early days delivery(可接受最早交货天数)
∙Acceptable rate changes(可接受比率更改)
∙Access level(访问层)
∙Alerts(预警)
∙Allocation percentage [2](分配百分比 [怒江魂2])
∙Alternate bills, forecasts(替代清单,预测)
∙Anchor date [2](停泊日期 [2])
∙Append planned orders [2](附加计划订单 [2])
ooverwrite all, in overwrite options(全部改写,在改写选项中)
ooverwrite none, in overwrite options(无改写,在改写选项中)
ooverwrite outside planning time fence, in overwrite options(改写外协计划时间栏,在改写选项中)
o机箱散热supply chain plan options(供应链计划选项)
∙Asmble-to-order items, forecast control(按订单装配件,预测控制)
∙Asmbly components, reviewing(装配件组件,复查)
∙Assigned to(已指定至)
∙Assigning Sourcing Rules and Bills of Distribution(指定来源规则和分配清单)
∙Assignment ts(指定集)
oplan options, in Supply Chain Planning(计划选项,在供应链计划中)
∙ATP
∙Audit Information Report(审计信息报表)
∙Auto-reduce MPS(自动冲减 MPS)
∙Auto-relea planned orders(自动释放计划订单)
属鸡和属蛇oDRP names, defining(DRP 名称,定义)
oMPS names, defining(MPS 名称,定义)
oMRP names, defining(MRP 名称,定义)
orelea time fence control(释放时间栏控制)
orepetitive items(重复项目)
osupply chain MRP names, defining(供应链 MRP 名称,定义)
∙AutoCreate Configuration(自动创建配置)
∙Available to promi(可承诺量)
odemand class to calculate, using(要计算的需求分类,使用)
ofor product family items(用于产品系列项目)
oformula(公式)
oinventory ATP, defining schedule names(库存 ATP,定义计划名称)
oinventory snapshot(库存快照)
omaterial requirements plans(物料需求计划)
onegative(负)
∙Average daily demand(日平均需求)
定时发送ocalculated by kanban planning(通过看板计划计算)
ocalculating for kanban items(计算看板项目)
B
∙Backward consumption days [2](反向冲减天数 [2])
ocarry forward days(挪前天数)
ocopy/merge forecast(复制/合并预测)
omaster schedule load options(主计划装入选项)
∙Batch mode planner(批模式计划员)
∙Bill of distribution, creating a(分配清单,创建)
∙Bill of Distribution window(分配清单窗口)
oCreating Bills of Distribution(创建分配清单)
oView bills of distribution(查看分配清单)
oViewing bills of distribution(查看分配清单)
∙Bill of material(物料清单)
ocalendar periods, in Planner Workbench(日历期间,在计划员工作台中)
oexample of two-level master scheduling(双层主计划的实例)
owalking up and down, in Planner Workbench(上下遍历,在计划员工作台中)
∙Bill of material attributes(物料清单属性)
oaffecting planning process(影响计划流程)
oBOM Item Type(BOM 项目类型) 长期黑眼圈
ophantom bills(虚拟件清单)
ostandard bills and routings(标准清单和工艺路线)
∙Bill of Material window(物料清单窗口)
omodel bills, defining(模型清单,定义)
ooption class bills, defining(选项类清单,定义)
∙Bill of Materials Parameters window, MPS explosion level(物料清单参数窗口,MPS 展开层)
∙Bill of resource, plan organizations(资源清单,计划组织)
∙Bill-to address, consume forecasts by(开单目的地地址,冲减预测依据)
∙Bills(清单)
odefinition, for two-level master scheduling(定义,用于双层主计划)
omultilevel(多层)
∙Bills of distribution(分配清单)
oplanning active [2](海龟能活多少年活动计划 [2])
oranking sources of supply(对供应来源进行分级)
osourcing percentages(来源百分比)
otime-phad make-buy planning(分期制造 - 采购计划)
∙Bills of material, changes to, engineering change planning(物料清单,更改为,工程更改计划)
∙Bills, standard(清单,标准)
∙Bucket type, display preferences, defining(时段类型,显示参数选择,定义)
∙Bucket types(时段类型)
∙Buckets(时段)
oforecasting bucket types(预测时段类型)
oreviewing bucketed information(复查分时段信息)
∙Build quence(建立序列)
oimplementing planned orders as firm jobs(将计划订单作为固定任务进行实施)
oimplementing repetitive schedules(实施重复性计划)
∙Bulk items(散件)
∙Buy from(购买处)
∙Byproducts(副产品)
C
∙Calculating, kanban size(计算,看板大小)
∙Calendar dates, repetitive planning periods [2](日历日期,重复性计划期间 [2])
otype ud in Planner Workbench(在计划员工作台中使用的类型)
∙Capable to promi, material requirements plans(可承诺能力,物料需求计划)
∙Capacity planning(能力计划)
oprerequisites(前提条件)
∙Capacity problems, identifyiing(能力问题,标识)
∙Carry forward days(挪前天数)
obackward consumption days(反向冲减天数)
ocopying/merging forecasts(复制/合并预测)
o超级淫欲系统forward consumption days(正向冲减天数)
omaster schedule load options(主计划装入选项)
omaster schedules, loading(主计划,装入)
∙Change Organization window, organization, changing(更改组织窗口,组织,更改)
∙Changing your organization(更改组织)
∙Component yield(组件产出率)
onew component usage, calculating(新组件使用,计算)
∙Components window, asmbly components, reviewing(组件窗口,装配件组件,复查)
∙Concurrent manager(并发管理器)
∙Configuration(配置)
oconsuming predefined(冲减预定义的)
oconsuming unique(冲减唯一的)
oforecasting predefined [2](预测预定义的 [2])
oforecasting unique(预测唯一的)
omaster schedules, adding to(主计划,添加至)
∙Consumption(冲减)
oabnormal demand(异常需求)