一、抽水试验目的
此次试验目的主要是确定Rumela Spillway开挖区域的水文地质参数:渗透系数K、导水系数T、给水度μ等,为Rumela Spillway基坑开挖排水提供计算依据。
二、抽水试验地段的地质及水文地质条件
The surface of Spillway Area consists of topsoil, alluvial gravel and sand, weathered sandstone and mudstone, light grey, poorly packed, low strength, argillaceous, soft rock.
According to the geological synthesis drawing provided by DIU, rock mass of spillway area is Nubian sandstones; quence of the strata from top to bottom in this area is topsoil &alluvial gravel and sand →Upper sandstone(about 15m)→ Lower mudstone(about 22m)→ Lower sandstone (about 11m)→ Basic Mudstone (hard rock).
Tectonic of the area is veral basaltic医保卡怎么改密码 dykes, weak zones, and some streams.
贫血有哪些症状
Hydrological condition of the site:
Sandstone and basalt is aquifer, the two aquifers being connected of upper Atbara River, recharge for the two aquifers were expected to take place from the Upper Atbara River.
For the sandstone aquifer, the transmissivity is 280m2/day and the average permeability is 0.75 m/day. For the basalt aquifer, the transmissivity is 100 m2/day with an hydraulic gradient of 1/160.
三、抽水试验类型确定
此次抽水试验采用多井、完整井、非稳定流抽水试验方式。
四、抽水试验井平面布置
根据溢流坝基坑结构及控制意义,共选择3组抽水试验点,每组实验点包括1个抽水井和2个观测井。以抽水井为中心,分别与2个观测井组成2条观测线,其中1条观测线垂直河水流向,另1条观测线平行河水流向。抽水试验井具体布置及剖面详见附图1:Layout of Pum
p test和附图2:Sections and details of Pump test hole。各组试验井地面高程及井底高程如下表1.
表1--各组试验井地面高程及井底高程
NO. | NAME | GROUND LEVEL(m) | BOTTOM LEVEL(m) | 深度(m) |
1 | 抽水井1-0 | 490.50 | 464.00 | 26.0 |
观测井1-1 | 490.50 | 464.00 | 26.0 |
观测井1-2 | 490.50 | 464.00 | 26.0 |
2 乌镇在哪 | 抽水井2-0 | 489.00 | 458.00 | 31.0 |
观测井2-1 | 489.00 | 458.00 | 31.0 |
如何写书评观测井2-2 | 489.00 | 458.00 | 31.0 |
3 | 抽水井3-0 | 485.00 | 460.00 | 25.0 |
观测井3-1 | 485.00 | 460.00 | 25.0 |
观测井3-2 | 485.00 | 460.00 | 25.0 |
| | | | |
五、钻井
5.1、先钻抽水井,后钻观测井。
5.2、抽水井采用HXY-4T型钻机钻井,井直径为127mm;Obrvation well采用HXY-4T型钻机钻井,井直径为76mm。
5.3、井钻进时,保持井壁铅直,取好岩芯,为岩层地质分析做准备。
5.4、抽水井和观测井的钻进方法:松散含水层钻井时采用跟管钻进,跟管外径为127mm;基岩含水层钻井采用清水钻进。抽水试验井段严禁使用泥浆循环钻进或植物胶护壁钻进。
语文的英语六、抽水试验设备
6.1、过滤器:抽水井与观测井均采用钢丝网骨架过滤器,抽水井过滤器骨架的井隙率不小于30%,观测井过滤器骨架井隙率不小于15%。过滤器的长度和放置深度根据实际地下水位确定,要求是过滤器上部超出实际地下水位1m。其下端设置2m长的管底封闭的沉淀管。
6.2、抽水设备:采用潜水泵,型号为:QDX1.5-32-0.55(1.5英寸、扬程:32m、功率:0.55kw、流量:1.5m3/h)。备用一台型号为:QDX3-30-1.1(3英寸、扬程:30m、功率:1.1kw、流量:3.0m3/h)。
6.3、观测水位工具:自动测试水位计,观测读数精确到1cm,设备如下图所示。
6.4、观测出水量工具:水表,观测读数精确到0.0001m3。
6.5、观测水温、气温工具:普通温度计。
6.6、供电设备:一台100kw的柴油发电机。
6.7、Desanding basin:
6.8、设备清单
序号 | 设备名称 | 型号 | 数量 | 备注 |
1 | 水表 | | 巴黎香榭丽舍大街 3个 | 精确:0.0001m3 |
2 | 自动电测水位计 | | 3个 | 精确:1cm |
3 | 普通温度计 | | 3个 | |
4 | 潜水泵 | QDX1.5-32-0.55 | 3个 | |
QDX3-30-1.1 | 1个 | |
5 | 过滤器 | 直径70mm | | 长度根据实际水位确定 |
山楂英文直径120mm | |
6 | 钻机 | HXY-4T | 1台 | |
7 | 套管 | 直径70mm | | 长度根据实际水位确定 |
直径120mm | |
8 | 发电机 | 100kw | 1台 | |
9 | Desanding basin | 2m*1m*1m | 1个 | With a V-notch |
| | | | |
两个少女
七、抽水试验设备安装
7.1、抽水井和观测井下过滤器前,用清水将井内泥质物冲洗干净。
7.2、观测井过滤器长度及深度均与抽水井过滤器的长度和高程相同。
7.3、水泵吸水龙头在各次降深中放置于同一深度。吸水龙头放在潜水层的最大降深动水位以下0.5m到1m处。