4231HS JAMES HARDIE SCYON® STRIA® CLADDING
1. GENERAL
This ction relates to the supply and installation of James Hardie Scyon® Stria®廉政
Cladding on a drained cavity installed with CLD Structural Cavity Battens.
It includes James Hardie Villaboard® Soffit Lining and James Hardie lected soffit lining.
1.1 RELATED WORK
满的组词
Refer to ~ for ~
1.2 ABBREVIATIONS AND DEFINITIONS
Refer to the general ction 1232 INTERPRETATION & DEFINITIONS for abbreviations
and definitions ud throughout the specification.
The following abbreviations apply specifically to this ction:
CLD Ceramic Low Density
NASH National Association of Steel-Framed Housing Inc.
RAB Rigid air barrier
Documents
装睡的人叫不醒1.3 DOCUMENTS
Refer to the general ction 1233 REFERENCED DOCUMENTS.  The following
documents are specifically referred to in this ction:
NZBC E1/AS1 Surface water
NZBC E2/AS1 External moisture
AS/NZS 1170.2 Structural design actions - Wind actions
AS/NZS 2908.2 Cellulo-cement products - Flat sheet
AS/NZS 3404.1 Steel structures standard - materials, fabrication and construction
NZS 3602Timber and wood-bad products for u in building
NZS 3603Timber structures standards
NZS 3604Timber-framed buildings
NASH 3405 An alternative solution for steel framed buildings
1.4 MANUFACTURER/SUPPLIER DOCUMENTS
James Hardie documents relating to this part of the work:
James Hardie Stria® Cladding, Technical Specification
James Hardie Fire and Acoustic Design Manual
James Hardie Bracing Design Manual
Eaves and Soffit Linings Installation Manual
Manufacturer/supplier contact details
Company: James Hardie New Zealand Limited
Web:
Email: *******************.nz
Telephone: Ask  James  Hardie™  on  0800  808  868
Warranties
1.5 WARRANTY - MANUFACTURER/SUPPLIER
Provide a material manufacturer/supplier warranty:
15 years: For  James  Hardie™~
(refer  to  James  Hardie™  product  warranty.
- Provide this warranty on the manufacturer/supplier standard form.
-
Commence the warranty from the date of purcha of the material.
Refer to the general ction 1237 WARRANTIES for additional requirements.
Requirements
1.6 QUALIFICATIONS
Installers to be experienced, competent trades people.
1.7 NO SUBSTITUTIONS
亚克提恩大兜虫
Substitutions are not permitted to any of the specified systems, components and
associated products listed in this ction.
1.8 MAINTENANCE REQUIREMENTS
Provide relevant James Hardie maintenance requirements at completion of the work.
Performance - Wind
1.9 PERFORMANCE - WIND
The design wind pressures are to NZS 3604, up to and including Extra High Wind Zone.
This is within the scope of James Hardie literature and details.
1.10 PERFORMANCE, SPECIFIC DESIGN, WIND
The design wind pressures are to AS/NZS 1170.2, for specific design wind zone (beyond
Extra High Wind Zone) up to 2.5kPa.  Only the details in Stria® Cladding technical
specification, specifically designed details or approved details included in the Contract
Documents can be ud.
2. PRODUCTS
Materials
2.1 STRIA CLADDING
James Hardie Stria® Cladding, low density autoclaved panel, 4200mm long x 405mm
wide x 14mm thick, manufactured from treated cellulo fibre, Portland cement, sand and
water.  Cured by high pressure autoclaving and manufactured to AS/NZS 2908.2.  Both
faces and all edges pre-aled.
2.2 RIGID AIR BARRIERS
Refer to ction 4171HR JAMES HARDIE RIGID AIR BARRIERS.
2.3 WALL UNDERLAY
Refer to ction 4161 UNDERLAYS, FOIL AND DPC.
2.4 CLD STRUCTURAL CAVITY BATTENS
James Hardie CLD® Structural Cavity Batten, 2450mm long x 70mm wide x 19mm thick,
manufactured from treated cellulo fibre, Portland cement, sand and water.  Cured by
high pressure autoclaving and manufactured to AS/NZS 2908.2.  Both faces and all
edges pre-aled.
2.5 EXTERIOR CAVITY CLOSER
Stria® moulded aluminium cavity clor.
2.6 FLUSH JOINTED SOFFIT LINING
James Hardie Villaboard® Lining 6mm and 9mm thick manufactured from treated
cellulo fibre, Portland cement, sand and water, cured by high pressure autoclaving and
manufactured to AS/NZS 2908.2.
2.7 SOFFIT LINING
James  Hardie  4.5mm  Hardiesoffit™  Lining,  HardieFlex™  Eaves  Lining,  Silkline® Soffit
Lining  Eclipsa™  Eaves  Lining,  HardiGroove™  Lining  and  6mm  HardieFlex™  Lining  soffit
manufactured from treated cellulo fibre, Portland cement, sand and water, cured by
high pressure autoclaving and manufactured to AS/NZS 2908.2.
Components
2.8 NAIL/SCREWS FOR CLD STRUCTURAL CAVITY BATTEN FIXING
Hot dipped galvanized 65mm x 2.87mm RounDrive ring shank nail or stainless steel
65mm x 2.87mm RounDrive ring shank nail for fixing to timber framing.  40mm x 10g lf
embedding wing tek galvanized steel screw for fixing to steel framing.
2.9 THERMAL BREAK FOR STEEL FRAMING
7-10mm XDP (extruded polystyrene grade) to be applied between steel frame and wall
underlay/RAB™ Board, to provide a thermal break.
2.10 NAILS FOR STRIA CLADDING FIXING TO CLD STRUCTURAL CAVITY BATTEN
Paslode 30mm 304 stainless steel Trim Master Angle Brad nails.
2.11 ADHESIVE FOR STRIA CLADDING FIXING TO CLD STRUCTURAL CAVITY BATTEN
Bostik 'Seal n Flex 1' or Sika Sikaflex 11FC.
2.12 VERTICAL JOINT FLASHING
Stria® aluminium extrusion available in 3.0m lengths.  Refer to SELECTIONS.
2.13 INTERNAL AND EXTERNAL CORNER FLASHINGS
Stria® purpo made anodid aluminium extrusion, available in 3.0m lengths.  Refer to
SELECTIONS.
2.14 ALUMINIUM WINDOW JAMB FLASHING
Stria® aluminium moulding ud beside window opening to end butt the Stria® Cladding,
available in 3.0m lengths.
Accessories
2.15 FLEXIBLE WINDOW OPENING FLASHING TAPE
Flexible lf-adhesive tape.  Refer to SELECTIONS.
2.16 JAMES HARDIE RIGID AIR BARRIER VERTICAL JOINT SEALING TAPE
女硕士
Flexible lf adhesive tape.  Refer to SELECTIONS.
2.17 FLEXIBLE SEALANT
One component moisture curing elastomeric alant.  Sikaflex AT Facade or Sikaflex MS.
2.18 PAINT FOR SEALING CUT EDGES OF CLD STRUCTURAL CAVITY BATTENS
Dulux Acraprime 501/1 or Rene Quick Dry.
3. EXECUTION
Conditions
3.1 DELIVERY/STORAGE AND HANDLING
Take delivery of materials and goods and store on site and protect from damage.  Store
Stria® Cladding flat on a smooth level surface, keep dry prior to fixing.  Protect surfaces,
edges and corners from damage.
Move/handle goods in accordance with manufacturer's requirements; carry panels in a
vertical position to avoid excessive bending.
Reject and replace goods that are damaged or will not provide the required finish.
3.2 PRE-INSTALLATION REQUIREMENTS
Check work previously carried out and confirm it is of the required standard for this part of
the work.
游东湖Moisture content of framing must not exceed the requirements specified by NZS 3602 to
minimize shrinkage and movement after panels are fixed.
3.3 PRE-CLADDING REQUIREMENTS
Check work previously carried out and confirm it is of the required standard for specified
finish.  Do not commence work until the substrate is of the standard required by James
3.4 TIMBER FRAMING REQUIREMENTS
Check timber framing stud and nog spacing is in accordance with NZS 3604 and framing
蒙古兔complies with NZS 3602.  For projects with specific engineering design check compliance
with AS/NZS 1170 and NZS 3603.
Where 600mm spacing of studs apply provide an intermediate means of support for
building underlay and insulation using either 75mm galvanid mesh or polypropylene
tape.  Not required where studs spaced at 400mm centres or where rigid air barriers are
provided in place of building underlay.
3.5 STEEL FRAMING REQUIREMENTS
Check steel framing complies with AS/NZS 3404 and NASH 3405, or to specific
engineering design requirements.
3.6 CLADDING CLEARANCES
Bottom edge clearance of cladding, ground clearances and overhang to bottom plate to
comply with the requirements of NZBC E2/AS1.
3.7 SITE REQUIREMENTS
Building site to comply with NZBC E1/AS1.
Installation
3.8 STANDARDS AND TOLERANCES
Refer to the general ction 1270 CONSTRUCTION for general requirements.
Installation - fire rated walls
3.9 INSTALL FIRE RATED WALLS
Install fire rated walls in accordance with James Hardie Stria® Cladding Technical
留学申请书Specification and James Hardie Fire and Acoustic Design Manual.
Installation - braced walls
3.10 INSTALL BRACED WALLS
Install braced walls using RAB™ Board in accordance with James Hardie Bracing Design
Manual.  Install Stria® Cladding in accordance with James Hardie Stria® Cladding
Technical Specification.
Installation - general
3.11 RIGID AIR BARRIER
Refer to 4171HR JAMES HARDIE RIGID AIR BARRIERS.
3.12 FIX WALL UNDERLAY
Refer to 4161 UNDERLAYS, FOIL AND DPC.
3.13 INSTALL CAVITY CLOSURE/VENT STRIP
Install cavity closure/vent strip in accordance with James Hardie Stria® Cladding
Technical Specification.  Install cavity clor at ba of walls, on horizontal (or raking)
open junctions and over openings (windows, meter boards, etc).
3.14 INSTALL CLD STRUCTURAL CAVITY BATTENS
Install battens in accordance with James Hardie Stria® Cladding Technical Specification.
Fix to studs over wall underlay or James Hardie Rigid Air Barrier, run battens
continuously over studs and provide a gap at first floor joist level to allow for shrinkage
and deflection in joists.  Alternatively, batten can be scarf-jointed over the studs within the
floor height.  Join battens with ends cut at 20° to 45° to deflect moisture to the exterior.
Prime all site cut ends of battens with Dulux Acraprime 501/1 aler or Rene Quick Dry
before installation.  Seal ends using an adhesive alant in the joint.
3.15 FIXINGS BATTENS TO TIMBER
Fix battens with 65 x 2.8mm RounDrive ring shank nails at 250mm centres for timber
studs at 400 or 600mm centres maximum where wind pressures of up to 1.5 kPa apply
(50m/s VH wind speed), and fix at 200mm centres with studs spaced at 400mm centres
maximum where wind pressures of above 1.5 and up to 2.5 kPa apply (above VH 50m/s
to 64.55m/s wind speed).  Refer to SELECTIONS for centres.
3.16 FIXING BATTENS TO STEEL
For steel framing of thickness 0.55 - 0.75 BMT u 10g x 40mm lf embedding wing tek
screw with same fixing as for timber.  Ensure a minimum 15mm penetration of screw into
steel frame.  Install thermal break over steel frame before installing underlay/James
Hardie Rigid Air Barrier.
3.17 PENETRATIONS AND FLASHINGS
Confirm that exterior wall openings have been prepared ready for the installation of all
window and door frames and other penetrations through the cladding.  Required
preparatory work includes the following:
- Wall underlay appropriately incorporated with penetration and junction flashings.
- Materials lapped in a way that water tracks down to the exterior face of the wall
underlay.
- Wall underlay to openings finished and dresd off ready for the installation of window
and door frames and other penetrations
- Claddings neatly finished off to all sides of openings
- Installation of flashings (tho required to be installed prior to installation of penetrating
elements).
3.18 INSTALL STRIA CLADDING
Install cladding in accordance with James Hardie Stria® Cladding Technical Specification.
Fix panels using combination nailing and adhesive method, comprid of Paslode 30mm
304 stainless steel TrimMaster Angle Brad Nails, a minimum of three nails per stud for
each panel.  Apply a 6mm thick continuous bead of adhesive alant to the face of the
batten, panel by panel, prior to fixing Stria® Cladding.  Finish nail heads flush with panel
surface.
3.19 INSTALL JOINTING SYSTEMS
Install vertical, horizontal, internal and external corner joints in accordance with James
Hardie Stria® Cladding Technical Specification.
3.20 INSTALL FLASHINGS
Install flashings at all wall openings, penetrations, junctions, connections, window sills,
heads and jambs to NZBC E2/AS1.
Installation - soffit
3.21 INSTALL SOFFIT
Cut sheets dry and ensure all edges and joints are fully supported.  Nail and inrt uPVC
fasteners to James Hardie requirements.  Fit complete with jointers and capping moulds.
Refer to Eaves and Soffit Linings Installation Manual.
3.22 INSTALL FLUSH JOINTED SOFFIT SHEETS
Cut sheets dry and ensure all edges and joints are fully supported.  Fit expansion joints to
limit finished areas to 7.2 metres x 4.8 metres for large soffits or 7.2 metres for narrow
soffits.  Flush joints with James Hardie Ba Coat, paper reinforcing tape and James
Hardie Top Coat to flush width of 180mm.  Refer to Eaves and Soffit Linings Installation
Manual.
Completion
3.23 ROUTINE CLEANING
Carry out routine trade cleaning of this part of the work including periodic removal all
debris, unud and temporary materials and elements from the site.

本文发布于:2023-06-30 06:50:00,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/82/1069712.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:装睡   提恩   不醒   大兜虫
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图