Test Pha:Test Type:Sample Type:ED Virtual CAE DV Comp PHM PV
明代四大奇书>成长的快乐作文600字Sub-System PT System Pre-VP Vehicle
FDV VP PVP Job 1 Offline V1Alpha Beta Gamma Pre-Pilot Pilot
The quantifiable/measurable statement that is to be verified through testing, evaluation, etc.
Specific test title and applicable reference procedure or standard. If needed provide a brief/conci description.
墙上涂鸦The quantifiable time or performance value that each test sample must achieve (i.e. < 22cc/m @ 5psi).Test Target
Specific statement regarding test requirements (i.e. R90/C90,R90C70, P90/C90, P99/C90, No Failures per requirements, etc
Alpha (P/T) Beta (P/T) Gamma (P/T) Pre-Pilot (P/T) Pilot (P/T)State quantifiable test results bad on specified Acceptance Criteria & Test Target.空气炸锅的食谱大全集
宫崎骏动画音乐
CAE - Virtual Analysis扑克牌两人玩法
PHM = Prototype-hand made. PT = Prototype-tooled.
湛江步行街Pre-VP = Pre-Verification of Process.
胃胀气怎么办快速排气VP = Verification of Process. PVP = Pre Volume Production. Job 1 Offline.
Alpha (P/T) Beta (P/T) Gamma (P/T) Pre-Pilot (P/T) Pilot (P/T)State quantifiable test results bad on specified Acceptance Criteria & Test Target.
CAE - Virtual Analysis
PHM = Prototype-hand made. PT = Prototype-tooled.
Pre-VP = Pre-Verification of Process.
VP = Verification of Process. PVP = Pre Volume Production. Job 1 Offline.