Ramp-up Activity Plan
Key Points
The Ramp-up Activity Plan is a document that describes the additional activities that the supplier has to implement in order to ensure that quality and delivery requirements are maintained during the launch period. 爬产活动计划是描述供应商在项目启动阶段为确保质量和交付要求被维护的额外活动的一个文件。
Minimum Content Requirements
别人结婚怎么祝福
日记作业A documented Ramp-up Activity Plan is required. This Plan may exist independently but shall be consistent with the pre-production control plan and the production capacity plan
要求爬产活动计划这个文件。这一计划应该独立存在并必须与前期试制控制计划和生产能力计划一致。
蚂蚁简笔画图片
Examples of additional activities which may be included in the Ramp-up Activity Plan are: 爬产活动计划中所包含的额外活动举例:
∙ Off-line, parate and independent check from the normal production process whenever possible 线外,如果有可能与正常生产流程分开和独立的检查。
∙ 100% inspection 100%检查。
∙ Incread frequency/sample size of receiving, process and or shipping inspections. 增加接受/过程和/或发货检查的频次/干小妹样本大小。
∙ 传的组词Sub-supplier containment and or sub-supplier support/audits 分供方的遏制和/或分供方支持/审核。
∙ Addition of inspection/control items 增加检查/控制项目。
∙ Incread verification of label accuracy 增加标示准确性的确认。
The Ramp-up Activity Plan shall also specify clear exit criteria for the ramp-up period. Th难忘的一幕
e criteria shall cover: 爬产活动计划也必须清楚规定爬产时期的退出准则。准则必须包含:
∙ 每学期Internal & external defect ratios 内外部缺陷比率
∙ Capability 过程能力
∙ Capacity 产能
2002世界杯冠军∙ Duration of activity 活动持续时间
If the supplier is unable to meet the exit criteria, or the supplier's ramp-up activity continues to identify non-conformances, the supplier shall continue the necessary additional activities until the quality or delivery concerns have been resolved to the satisfaction of Renault/ Nissan.
如果供应商不能满足退出准则,或供应商的爬产活动计划连续发现不符合,供应商必须继续必要的附加行动直到质量和交付关注被解决并满足尼桑/雷诺要求。
The organization for the management of the ramp-up activity shall be identified on the Ra
mp-up Activity plan. 管理爬产活动计划的组织必须在爬产活动计划中被识别。