RULES FOR CLASSIFICATION OF
桎梏
法语谚语Ships
PART 6 CHAPTER 35
NEWBUILDINGS
SPECIAL EQUIPMENT AND SYSTEMS – ADDITIONAL CLASS
Tentative rules for Gas ready ships
JANUARY 2015
The electronic pdf version of this document found through is the officially binding version The content of this rvice document is the subject of intellectual property rights rerved by Det Norske Veritas AS (DNV). The ur accepts that it is prohibited by anyone el but DNV and/or its licenes to offer and/or perform classification, certification and/or verification rvices, including the issuance of certificates and/or declarations of conformity, wholly or partly, on the basis of and/or pursuant to this document whether free of charge or chargeable, without DNV's prior written connt. DNV is not responsible for the conquences arising from any u of this document by others.
D ET N ORSK
E V ERITAS AS
FOREWORD
DNV is a global provider of knowledge for managing risk. Today, safe and responsible business conduct is both a licen to operate and a competitive advantage. Our core competence is to identify, asss, and advi on risk management. From our leading position in certification, classification, verification, and training, we develop and apply standards and best practices. This helps our customers safely and responsibly improve their business performance. DNV is an independent organisation with dedicated risk professionals in more than 100 countries, with the purpo of safeguarding life, property and the environment.
The Rules lay down technical and procedural requirements related to obtaining and retaining a Class Certificate. It is ud as a contractual document and includes both requirements and acceptance criteria.
© Det Norske Veritas AS January 2015
Any comments may be nt by e-mail to
If any person suffers loss or damage which is proved to have been caud by any negligent act or omission of Det Norske Veritas, then Det Norske Veritas shall pay compensation to such person for his proved direct loss or damage. However, the compensation shall not exceed an amount equal to ten times the fee charged for the rvice in question, provided that the maximum compensation shall never exceed USD 2 million.
In this provision “Det Norske Veritas” shall mean the Foundation Det Norske Veritas as well as all its subsidiaries, directors, officers, employees, agents and any other acting on behalf of Det Norske Veritas.
Pt.6 Ch.35 CHANGES – CURRENT – Page 3
CHANGES – CURRENT
General
This is a new document.
The rules enter into force 1 July 2015.
Det Norske Veritas AS, company registration number 945 748 931, has on 27th November 2013 changed its name to DNV GL AS. For further information, e Any reference in this document to “Det Norske Veritas AS” or “DNV” shall therefore also be a reference to “DNV GL AS”.
Pt.6 Ch.35 Contents – Page 4
CONTENTS
CHANGES – CURRENT (3)
Sec. 1General (5)
产品需求分析1Introduction (5)
1.1Objective (5)
1.2Scope (5)
1.3Application (5)
1.4Definitions (5)
2Class notation - Gas ready (5)
3Documentation (6)
3.1Documentation requirements for qualifier D (6)
3.2Documentation requirements for qualifier S (7)
大班生活活动目标
3.3Documentation requirements for additional qualifiers (7)
Sec. 2Ship installations preparing for later liquefied natural gas fuel conversion (8)
1Gas ready with qualifier S included (8)
2Gas ready with qualifier T included (8)
颈背部疼痛的原因3Gas ready with qualifier P included (8)
4Gas ready with qualifiers MEc or AEc included (8)
5Gas ready with qualifiers MEi, AEi or B included (8)
6Gas ready with qualifier Misc included (8)
Sec. 3Manufacture, workmanship and testing (10)
1General (10)
Pt.6 Ch.35 Sec.1 General – Page 5
SECTION 1 GENERAL
1Introduction
1.1Objective
The rules apply to ships which during the new building pha are planned for and partly prepared for later conversion to liquefied natural gas (LNG) fuel.
1.2Scope
The notation has more levels and corresponding requirements. The minimum mandatory level includes:—verification of compliance with GAS FUELLED rules for a future LNG fuelled ship design
—the main engine(s) installed can be converted to duel fuel operation (or are of dual fuel type from new-building stage).
In addition optional levels may be included, i.e. it can be chon to include different preparations of the ship for a later conversion, and include certification and installation of parts of the LNG fuel systems in the new-building.
1.3Application
第十二英语怎么读1.3.1The Gas ready class notation provides the basis for compliance with rules in force at the time of contract for construction for the new-building. The rules in force at the time of a later ship conversion to LNG fuel shall be complied with regardless of the Gas ready notation.
代表希望的花
Guidance note:
At time of conversion, documentation should be submitted for approval. The design verification from the new building stage will be ud to support the approval.
不省人事---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
1.3.2The Gas ready class notation does not include survey requirements for follow up of the ship when in operation.
Guidance note:
At time of conversion a survey and evaluation of the condition of the equipment or systems installed from new building stage will be done. The test scope will depend on time elapd from new building, and in what way the systems and components have been prerved/ maintained.
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
1.3.3The rules are applicable for installations where natural gas, stored as LNG, is intended to be ud as fuel. If the rules are applied to designs with other gas fuels, special considerations will have to be done.
1.4Definitions
Definitions for terms ud in this chapter are found in Pt.6 Ch.13 Sec.1.
2Class notation - Gas ready
A ship complying with the relevant parts of this chapter can be given a Gas ready(X1, X2, X3 …) notation, with a number of possible qualifiers as outlined in Table 1.