1. | DNV-DS-J102 | Design and Manufacture of Wind Turbine Blades, Offshore and Onshore Wind Turbines | |
2. | DNV-OS-A101 | Safety Principles and Arrangements | April 2011 |
3. | DNV-OS-B101 | Metallic Materials | April 2009 |
4. | DNV-OS-C101 | Design of Offshore Steel Structures, General (LRFD Method) | April 2011 |
5. | DNV-OS-C102 | Structural Design of Offshore Ships | October 2011 |
6. | DNV-OS-C103 | Structural Design of Column Stabilid Units (LRFD Method) | April 2012 |
7. | DNV-OS-C104 | Structural Design of Self-Elevating Units (LRFD Method) | April 2012 |
8. | DNV-OS-C105 | Structural Design of TLPs (LRFD Method) | April 2011 |
9. | DNV-OS-C106 | Structural Design of Deep Draught Floating Units (LRFD Method) | April 2012 |
10. | DNV-OS-C201 | Structural Design of Offshore Units (WSD Method) | April 2012 |
11. | DNV-OS-C301 | Stability and Watertight Integrity | April 2012 |
12. | DNV-OS-C401 | Fabrication and Testing of Offshore Structures | October 2010 |
13. | DNV-OS-C501 | Composite Components | October 2010 |
14. | DNV-OS-C502 | Offshore Concrete Structures | October 2010 |
15. | DNV-OS-C503 | Concrete LNG Terminal Structures and Containment Systems | October 2010 |
16. | DNV-OS-D101 | Marine and Machinery Systems and Equipment | October 2011 |
17. | DNV-OS-D201 | Electrical Installations | April 2011 |
18. | DNV-OS-D202 | Automation, Safety, and Telecommunication Systems | October 2008 |
19. 终止合同 | DNV-OS-D203 | Integrated Software-Dependent System (ISDS) | June 2011 |
20. | DNV-OS-D301 | Fire Protection | 中士的工资是多少一月October 2009 |
21. | DNV-OS-E101 | Drilling Plant | October 2009 |
22. | DNV-OS-E201 | Oil and Gas Processing Systems | October 2010 |
23. | DNV-OS-E301 | Position Mooring | October 2010 |
24. | DNV-OS-E302 | Offshore Mooring Chain | October 2009 |
25. | DNV-OS-E303 | Offshore Mooring Fibre Ropes | October 2010 |
26. | DNV-OS-E304 | Offshore Mooring Steel Wire Ropes | October 2009 |
27. | DNV-OS-E401 | Helicopter Decks | April 2012 |
28. | DNV-OS-E402 | Offshore Standard for Diving Systems | October 2010 |
29. | DNV-OS-E403 | Offshore Loading Buoys | October 2008 |
30. | DNV-OS-E406 | Design of Free Fall Lifeboats | April 2010 |
31. | DNV-OS-F101 | Submarine Pipeline Systems | October 2010 |
32. | DNV-OS-F201 | Dynamic Rirs | October 2010 |
33. | DNV-OS-H101 | Marine Operations, General | October 2011 |
34. | DNV-OS-H102 | Marine Operations, Design and Fabrication | January 2012 |
35. | DNV-OS-H201 | Load Transfer Operations | April 2012 |
36. | DNV-OS-H203 | Transit and Positioning of Offshore Units | February 2012 |
37. | DNV-OS-J101 | Design of Offshore Wind Turbine Structures | October 2011 |
38. | DNV-OS-J201 | Offshore Substations for Wind Farms | October 2009 |
39. | DNV-OS-J301 | Standard for Classification of Wind Turbine Installation Units | April 2011 |
Recommended Practices | |||
40. | DNV-RP-A201 | Plan Approval Documentation Types – Definitions慈善征文 | April 2012 |
41. | DNV-RP-A203 | Qualification of New Technology | July 2011 |
42. | DNV-RP-A204 | Quality Survey Plan (QSP) for Offshore Class New-building Surveys | September 2011 |
43. | DNV-RP-A205 | Offshore Classification Projects - Testing and Commissioning | March 2012 |
44. | DNV-RP-B101 | Corrosion Protection of Floating Production and Storage Units | April 2007 |
45. | DNV-RP-B401 | Cathodic Protection Design | April 2011 |
46. | DNV-RP-C101 | Allowable Thickness Diminution for Hull Structure of Offshore Ships | April 2007 |
47. | DNV-RP-C102 | Structural Design of Offshore Ships | February 2002 |
48. | DNV-RP-C103 | Column-Stabilid Units | April 2012 |
49. | DNV-RP-C104 | Self-elevating Units | January 2012 |
50. | DNV-RP-C201 | Buckling Strength of Plated Structures | October 2010 |
51. | DNV-RP-C202 | Buckling Strength of Shells | October 2010 |
52. | DNV-RP-C203 | Fatigue Design of Offshore Steel Structures | October 2011 |
53. | DNV-RP-C204 | Design against Accidental Loads | October 2010 |
54. | DNV-RP-C205 | 伯仁Environmental Conditions and Environmental Loads | October 2010 |
55. | DNV-RP-C206 | Fatigue Methodology of Offshore Ships | October 2010 |
56. | DNV-RP-C207 | Statistical Reprentation of Soil Data | 垃圾分类画 January 2012 |
57. | DNV-RP-C301 | Design, Fabrication, Operation and Qualification of Bonded Repair of Steel Structures | April 2012 |
58. | DNV-RP-C302 | Risk Bad Corrosion Management | April 2012 |
59. | DNV-RP-D101 | Structural Analysis of Piping Systems | October 2008 |
60. | DNV-RP-D102 | Failure Mode and Effect Analysis (FMEA) of Redundant Systems | January 2012 |
61. | DNV-RP-D201 | Integrated Software Dependent Systems | October 2009 |
62. | DNV-RP-E101 | Recertification of Well Control Equipment for the Norwegian Continental Shelf | January 2012 |
63. | DNV-RP-E102 | Recertification of Blowout Preventers and Well Control Equipment for the US Outer Continental Shelf | June 2010 |
64. | DNV-RP-E301 | Design and Installation of Fluke Anchors in Clay | May 2012 |
65. | DNV-RP-E302 | Design And Installation of Plate Anchors in Clay | December 2002 ps图章 |
66. | DNV-RP-E303 | Geotechnical Design and Installation of Suction Anchors in Clay | October 2005 |
67. | DNV-RP-E304 | Damage Asssment of Fibre Ropes for Offshore Mooring | April 2005 |
68. | DNV-RP-E307 | Dynamic Positioning Systems - Operation Guidance | January 2011 |
69. | DNV-RP-E401 | Survey of Diving Systems | April 2007 |
70. | DNV-RP-E402 | Naval Rescue Submersibles | October 2010 |
71. | DNV-RP-E403 | Hyperbaric Evacuation Systems | October 2010 |
72. | DNV-RP-F101 | Corroded Pipelines | October 2010 |
73. | DNV-RP-F102 | Pipeline Field Joint Coating and Field Repair of Linepipe Coating | May 2011 |
74. | DNV-RP-F103 | Cathodic Protection of Submarine Pipelines by Galvanic Anodes | October 2010 |
75. | DNV-RP-F105 | Free Spanning Pipelines | February 2006 |
76. | DNV-RP-F106 | Factory Applied External Pipeline Coatings for Corrosion Control | May 2011 |
77. | DNV-RP-F107 | Risk Asssment of Pipeline Protection | October 2010 |
78. | DNV-RP-F108 | Fracture Control for Pipeline Installation Methods Introducing Cyclic Plastic Strain | January 2006 |
79. | DNV-RP-F109 | On-Bottom Stability Design of Submarine Pipelines | November 2011 |
80. | DNV-RP-F110 | Global Buckling of Submarine Pipelines Structural Design due to High Temperature/High Pressure | October 2007 |
81. | DNV-RP-F111 | Interference Between Trawl Gear and Pipelines | October 2010 |
82. | DNV-RP-F112 | Design of Duplex Stainless Steel Suba Equipment Expod to Cathodic Protection | October 2008 |
83. | DNV-RP-F113 | Pipeline Suba Repair | October 2007 |
84. | DNV-RP-F116护肝的中药 | Integrity Management of Submarine Pipeline Systems | October 2009 |
85. | DNV-RP-F118 | Pipe Girth Weld AUT System Qualification and Project Specific Procedure Validation | October 2010 |
86. | DNV-RP-F201 | Design of Titanium Rirs | October 2002 |
87. | DNV-RP-F202 | Composite Rirs | October 2010 |
88. | DNV-RP-F203 | Rir Interference | April 2009 |
89. | DNV-RP-F204 | Rir Fatigue | October 2010 |
90. | DNV-RP-F205 | Global Performance Analysis of Deepwater Floating Structures | October 2010 |
91. | DNV-RP-F206 | Rir Integrity Management | April 2008 |
92. | DNV-RP-F301 | Suba Separator Structural Design | April 2007 |
93. | DNV-RP-F302 | Selection and u of Suba Leak Detection Systems | April 2010 |
94. | DNV-RP-F401 | Electrical Power Cables in Suba Applications | February 2012 |
95. | DNV-RP-G101党性锻炼不够 | Risk Bad Inspection of Offshore Topsides Static Mechanical Equipment | October 2010 |
96. | DNV-RP-G103 | Non-Intrusive Inspection | January 2011 |
97. | DNV-RP-H101 | Risk Management in Marine and Suba Operations | January 2003 |
98. | DNV-RP-H102 | Marine Operations during Removal of Offshore Installations | April 2004 |
99. | DNV-RP-H103 | Modelling and Analysis of Marine Operations | April 2011 |
100. | DNV-RP-H104 | Ballast, Stability, and Watertight Integrity - Planning and Operating Guidance | September 2011 |
101. | DNV-RP-J101 | U of Remote Sensing for Wind Energy Asssments | November 2011 |
102. | DNV-RP-J201 | Qualification Procedures for CO2 Capture Technology | April 2010 |
103. | DNV-RP-J202 | Design and Operation of CO2 Pipelines | April 2010 |
104. | DNV-RP-J203 | Geological Storage of Carbon Dioxide | April 2012 |
105. | DNV-RP-O401 | Safety and Reliability of Suba Systems | April 1985 |
106. | DNV-RP-O501 | Erosive Wear in Piping Systems | January 2011 |
本文发布于:2023-06-25 13:19:14,感谢您对本站的认可!
本文链接:https://www.wtabcd.cn/fanwen/fan/82/1036470.html
版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。
留言与评论(共有 0 条评论) |