Touax Cargo Worthy Criteria

更新时间:2023-06-16 08:35:20 阅读: 评论:0

TOUAX GLOBAL CONTAINER SOLUTIONS CARGOWORTHY INSPECTION STANDARD
(For Steel General Purpo Containers)英语辅音
Effective: May 1st, 2015
TOUAX GLOBAL CONTAINER SOLUTIONS CARGOWORTHY INSPECTION STANDARD
(For Steel General Purpo Containers)
1  INTRODUCTION
1.1  GENERAL
∙This guideline is designed for inspection of TOUAX containers off-hired with TIN Criteria: “C argoworthy”.
veral什么意思∙The repair method lected should be the most economical and suit the particular repair location.
1.2  ACCEPTABLE DAMAGE
lacoste怎么读This is defined as damage where repair is not required.  Acceptable damage includes:
∙Previous repairs should not be reworked unless the structural integrity of the container is compromid or it is unsuitable for cargo.职责英文>被时代
∙Steel plate floor patches are acceptable with dimensions not exceeding 200x200mm and plate thickness not less than 4mm
1.3  NON-ACCEPTABLE DAMAGE
This is defined as damage that must in all cas be repaired and includes items where following are prent:
∙The International Convention for Safe Containers, 1972, as amended (CSC) is violated and container safety is affected.
∙The Customs Convention is violated.
∙There is a reduction in the internal height dimension by more than 50mm, or internal width/length dimension by more than
ntencelady gaga alejandro50mm.
∙Cracks in welds.
∙Corrosion causing a loss of structural integrity (no hammer testing is permitted).
英语速成1.4  WEAR & TEAR
This is defined as deterioration of the general condition and cosmetic appearance brought about by routine operational u. Wear and tear conditions should only be estimated for repair when required to
restore a container to a cargoworthy condition. The following should be considered when judging whether repairs are required.
雅思g类培训
∙General paint deterioration = NO REPAIR.
中文翻译日文转换器
∙Deterioration of door gaskets and fittings = NO REPAIR, unless not light tight AND watertight, or if door operation/curement is impaired.
∙Flooring delamination resulting from routine cargo loading and unloading cycles = NO REPAIR, unless floor strength is affected.
2MAIN STRUCTURAL COMPONENTS
3OTHER COMPONENTS

本文发布于:2023-06-16 08:35:20,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/78/966604.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:职责   时代
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图