IQP: STA-400 Issued: Oct/28/2010 Page: 1 of 5
ATTACHMENTS: (N/A)
REFERENCES: (a)SPC Ur's Guide
(b) STA-200 X(bar)-R
口才班(c) STA-300 Capability Studies
1.0PURPOSE(目的 )
To define the Statistical Process Control applications for our production inspect process.
为了规范生产检验过程的SPC的控制。
2.0SCOPE(范围)
This procedure is applied to all the production part and process need to SPC control.
本文件适用于公司内有SPC监控要求的所有产品及工艺。
3.0 FUNCTIONS AFFECTED(涉及部门)
Quality(质量部)
Production (生产)
Project (项目)
Design (设计)
Engineering (工程)
Quality System (质量系统)
4.0DEFINITIONS(定义)
三角函数公式大全4.1 The primary determinate in control chart lection is Data Type.
选择控制图最基本的决定条件是数据类型。
4.1.1 Continuous data: the data from testing, for example: label dimensions.
计量型数据: 通过测量得到的数据,如标签尺寸。
4.1.2 Attribute data: the data from counting, the attribute data have two outcome (Pass/Fail, Good/NG).
计数型数据: 通过点数得到的数据, 计数型数据只有两个值(合格/不合格, 通过/不通过)。
考研英语在线培训
IQP: STA-400 Issued: Oct/28/2010 Page: 2 of 5
4.2 Statistical Process Control(SPC): Using the statistical technology(control chart)for analyzing the stability of the process or output data,proper measure to reach and keep the statistical control status to improve the process ability.
统计过程控制:使用统计技术(如控制图)去分析一个过程或输出数据的稳定性,采取适当的措施去达到和保持统计控制状态并改进过程能力。建筑管理
4.3 Control of chart:The classical and effective tools to be ud for reaching SPC control.
控制图:达到统计控制的典型和有效工具。
4.4 Ability of control: The ability of process under the SPC can be confirmed, the data must be random, independent, and normally distributed.
控制能力:只有过程在统计控制状态下才能被用于SPC控制,数据必须是随机,独立的和符合正态分布的。
5.0 PROCEDURE(程序)
reload
5.1 Parametric choice:Quality engineer, Design engineer or manufacture engineer together to confirm the way of collect data, information of each batch, frequency and which control of chart we need.
参数选择:质量工程师,客户工程师和制造工程师确定数据收集方法,分组信息,频率和所要使用的控制图。
SPC control need follow the customer 2Ddrawing key dimension or process key point information to t up. (Follow CP, BOO, 2D drawing info to make SPC control standard).
SPC控制需要按照客户图纸重要尺寸的管控或生产过程中重点需要管控的内容对过程进行控制。
5.2 SPC chart choice: For the continuous data and normal distribution, usually u the X bar-R, X bar-
S, I-MR. For the attribute data, usually u the failure rate P-chart.
SPC图形选择:对于计量型数据并且满足正态分布,通常采用的是:均值变差图(X bar-R),均值标准差图(X bar-S)和单值极差图I-MR。对于计数型数据,通常采用不合格品率的P图。
IQP: STA-400 Issued: Oct/28/2010 Page: 3 of 5
5.3 Confirm the control limit and alarm rule:
SPC system will bring about the control limit according to the historic data; it will make alarm for the data out of control limit and tolerance of customer requirement. When make a issue alarm, we need to take a action for improving as soon as possible.
确定控制线及报警规则:
SPC系统将根据原始数据建立控制线,而且超出控制线及客户公差线将报警。当发生问题警报,我们需要尽可能快的采取行动改善。
The Western Electric Rules are a common method of identifying special cau variation.
一般都遵循西部电器原则进行识别特殊原因引起的变异
5.4 Execution performer: Production operator and IPQC need to collect the data and record it into SPC system. Recorder need to follow the CP, BOO and customer drawing requirement.
生产操作员和IPQC按规定收集并记录数据。记录需要依据控制计划,BOO和客户图纸要求进行。
5.5 Action plan:Operator and recorder---leader---technician---engineer(ME, QE, DE)--manager
beware
IPQC and operator need to judge the process stability at any time, when found the control chart issue to notice DE, ME and QE
IPQC和生产人员应随时判断工序是否处于稳定受控状态,当控制图上的点发生异常时应及时通知工艺工程师,制造工程师和质量工程师。英语能力描述
IQP: STA-400 Issued: Oct/28/2010 Page: 4 of 5
When the control chart have issue, DE, ME and QE must analyze the issue with QE, and make actions improve and avoid this issue.
当控制图上点排列发生异常时,工艺工程师,制造工程师和质量工程师应及时对此问题组织分析,必要时采取纠正和预防措施。
5.6 Control limit modification:
Design engineer or process engineer can change the control limit and midline according to the customer requirement and process control requirement.
客户工程师或工艺工程师必要时修订控制界限,中心线根据客户要求及过程控制要求。
5.7 SPC SYSTEM MAINTENANCE (SPC 系统维护)
Using the SPC system to manage and maintain the production data, cooperate with customer to analyze and study the historic production data. IT needs to maintain the uful of SPC software and related SPC rver.
使用SPC系统对相关生产数据进行管理和维护,协助客户对SPC中生产历史数据进行分析和研究。IT协助对SPC软件及相关SPC rver 进行维护。
6.0 RESPONSIBLITIES(职责)
6.1 Manufacturing Engineer will:
制造工程师责任:
(A) Determine the measuring samples and operators for the machine.
cdb(A) 决定机器测量的产品和相关测量人员。
(B) Responsible for the analysis of SPC system information for product.
(B) 负责对生产产品的SPC系统数据进行分析。
(C) Follow the measurement data and SPC control chart to improvement the dome punch
process.
(C) 通过数据测量和SPC控制图的分析达到对dome 成型过程的控制。
(D) Using the SPC system manage and maintain the production data, cooperate with
customer to analyze and study the historic production data.
(D) 使用SPC系统对相关生产数据进行管理和维护,协助客户对SPC中生产历史数据进行分析和
研究。
6.2 Quality Engineer will:
质量部责任:
学会计有方法(A) Responsible for the analysis of SPC system for parts issue.
(A) 负责对生产在SPC系统中出现问题的产品进行分析管理。
IQP: STA-400 Issued: Oct/28/2010 Page: 5 of 5
(B) Responsible for re-giving training to operators and inspector who fail to meet the target.
(B) 需要对没有达到要求的操作员和检验员进行在培训。
(C) Follow the measurement data and SPC control chart to require the production who improve
the process.
( C) 通过测量的数据和SPC控制图要求生产及时的改进相关工艺。
air horn
6.3 Production will:
生产责任:
(A) Support Quality and ME to find out the solution for the production defect issue, and online
control the machine stability.
(A) 协助ME和质量找出生产不良问题的解决方法,同时控制生产机器的稳定性。
(B) Production specialist supports Quality to perform the SPC capability for the production.
(B) 生产负责人支持质量部门一起提高生产中SPC的能力。
6.4 Designer Engineer will:
设计责任:
(A)Cooperation with others department to make the SPC control standard follow customer requirement.
(A)与其他部门一起根据客户要求为SPC控制制定标准。
(B)Support Quality and ME to find out the solution for the production defect issue, and online control the machine stability.
( B ) 协助ME和质量找出生产不良问题的解决方法,同时控制生产机器的稳定性。
7.0 QUALITY RECORDS(数据记录)
Quality records will be maintained in accordance with STA-400, Quality Records will input into SPC software(X bar-R,SPC analysis and improvement action)
8.0 REVISION HISTORY(版本历史记录)
O Oct-28-2010 New procedure first relead. Yuelin. Qiu