延锋伟世通注塑模具采购标准

更新时间:2023-05-09 21:12:25 阅读: 评论:0

延锋伟世通注塑模具采购标准
Specification for Yanfeng Visteon Injection Molds
May 19, 2003
1.General Information 概述
This specification is especially developed for the adaptation of the procurement of the injection mold if the company proper. The specification contains design requirements, build requirements and mold tryout standards.
本标准是为适应本公司注塑模的采购而定的要求,本标准包括设计要求,制造要求和试模标准。
Any deviation from this specification must be approved by responsible project engineer of Yanfeng Visteon.
任何与本标准的不符合项必须得到延锋伟世通项目工程师的批准。
It shall be the mold vendor responsibility to understand and implement the specification. Implement the detailed contents in mold design, built and the rvice after sale.
模具供应商有责任理解并执行本标准。
The explanation right to all the issues relating the specification belongs to Yanfeng Visteon. All questions concerning the specification shall be directed to responsible project engineer of Yanfeng Visteon.
与本标准相关的所有问题的解释权属于延锋伟世通。
1.1 Technical Description 技术描述
1.2 Mold Build 模具制造
A. Vendor will provide complete ts of approved mold design drawings and CAD data (both 2D and 3D). Any errors or inconsistencies to the equipment to be put into operation by Yanfeng Visteon Company are to be reported immediately to the responsible project engineer.
供应商提供完整的已批准的模具设计图纸和CAD数据(2维和3维)。延锋伟世通提供进行操作的注塑机标准,有任何错误或不一致应立即向项目工程师报告。
B. Before building the mold, the vendor will provide CAD data of the product. If any design problem which will cau failure of mold building, vendor shall inform responsible engineer immediately and gives out related suggestion as well.
模具制造前,模具供应商应向延锋伟世通提供产品的CAD数据。如果有任何会导致模具制造失败的设计问题,供应商应立即通知延锋伟世通责任工程是同时提出相关建议。
C. Datum lines are to be scribed in core steel 0.1mm deep.
基准线划在型芯0.1mm深处。
D. Mold must have a sufficient strengthening safety strap at operator and helper side  respectively to prevent mold opening.
在模具的操作工和辅助工的一侧必须装有足够牢固的安全板以防止模具打开。
E. All molds must have complete identification labels with Chine and English. The Chine translation is to be done by mold vendor and confirmed by the Yanfeng Visteon responsible project engineer.
所有的模具必须有完整的中英文识别标签,中文译文由模具供应商提供并有延锋伟世通责任项目工程师确认。
F. All molds are to be supplied with, at least, four (4) safety hoist rings. The rings on the top side of the mold must be sufficient enough to support mold weight and reach the balance.
对所有的模具必须至少提供4个安全吊环,模具顶部的吊环必须足够支持模具的重量并达到平衡。
G. Supplier must submit a written quality control report as to the dimension correctness to the injection molds and must be approved by YFV specified project engineer.
供应商必须提交一份书面的有关这些注塑模的尺寸正确性的质量控制报告,必须获得延锋
伟世通主管项目工程师的认可。
H. Molds are to be thermally stress relieved prior to finishing. Any method of stress relieving other than thermal must be approved by the responsible project engineer in writing.
模具经加工之前应先进行热处理,任何除热处理以外的去应力方法必须得到延锋伟世通责任项目工程师的书面认可。
1.3Tryout Mold 试模
1.3.1Part Approval 产品认可
Injection molds must produce molded parts within the cycle time identified aforementioned.
注塑模生产产品必须在生产节拍之内。
The molded parts produced during tryout should conform to the requirements in dimensio
n and asmbly and the quality control requirements of Yanfeng Visteon Company. They must be qualified in matching the whole vehicle. When there is inconsistent gap and flushness between painted bumper and car body, the design and build source(s) will be held responsibility for the cost of repairs to the mold due to dimensional errors or process not meeting the requirements.
试制的注塑产品必须与产品图要求的尺寸及装配的要求以及延锋伟世通的质量控制要求相符。必须与整车配合一致,涂装产品装车匹配有间隙和匹配不平整以及由于尺寸错误或者工艺不满足要求而带来的更改费用由设计和制造方负责。
1.3.2Dimensions and Part Approval 尺寸和零件认可
Injection molds must produce qualified parts. Products off molds must reach customer requirements. Any unqualified items must be correct.
注塑模必须生产合格的零件。零件必须具备相同或高于客户所需的外观及质量标准,任何不符合项必须被纠正。
After the mold has produced parts that are dimensionally and functionally approved, the required surface finish (suitable for painting) will be completed and the mold will undergo tryout to approve the surface finish capability for final approval.
模具生产出尺寸及功能均认可的产品,必须达到表面光洁度要求(适合涂装),并将对模具进行试制以验证表面光洁度。
1.4Mold Capability 模具能力
After complete part approval, the mold will be subjected to a pro-production capability to prove all functions in the mold, e.g. ejector, hydraulic, temperature control and all moving mechanisms. The mold capability run will last twenty four (24) hours. If a mold component fails during this period, the supplier must repair or replace the failed item at their expen.
完整的零件认可,模具将被提出用试生产能力证明模具的所有功能,例如,顶杆,液压缸,温控箱以及所有的运动机械,模具能力测试将持续24小时。如果在这段时间里,一个模具零部件失效了,模具供应商必须支付一定的费用来修理或替代失效的部分。

本文发布于:2023-05-09 21:12:25,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/78/567253.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:模具   要求   产品   世通
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图