1. MM --- Materials Management: 物料管理
2. CMM --- Component Module Move: 零组件 (乡村包围城市); 系统组装 (火车头火车头工业驱动供应链); 整合供应链 (运筹物流, ERP, VMI, SFC … )
3. ECMMS$ --- Engineering Component Module Move Service Dollars: 工程 (研究开发); 零组件 (乡村包围城市); 系统组装 (火车头火车头工业驱动供应链); 整合供应链 (运筹物流, ERP, VMI, SFC … ) ; 服务, 代收钱
4. Forecast --- 客户需求预测
5. WO --- Work Order = PO --- Production Order: 生产工令
6. MRP --- Material Requirement Planning: 物料需求计划
7. VPO --- Vendor Purcha Order: 供货商采购订单
8. MAWB --- Master Air Waybill: 空运主提单
9. HAWB --- Hou Air Waybill: 小提单
10. B / L --- Bill of Loading: 海运提单
11. Consignee: 收货者
12. ETD --- Estimated to Departure: 预计出发
13. MIN / MAX --- Minimum and Maximum: 最小量与最大量
14. VPO Burning: 向供货商采购货的平衡量
15. VMI --- Vendor Management Inventory: 供货商免费存放, 在距离客户组装地2小时车程内, 3天到2周之库存
16. VDPS --- Vendor Daily Planning Schedule: 供货商日生产排配
17. ETA --- Estimated to Arrival: 预计到达时间
18. Stock Level: 库存水准
19. WO / PO Consumption --- Work Order / Production Order Consumption: 工令消
耗
20. BO Replenish --- Back Order Replenish: 订单欠交补货
21. VMSA Burning --- Vendor Managed Stock Area Burning: 供货商管理库存平衡
22. Pull Back: 由后往前拉
23. Pipeline: 物流供应链中的库存
24. ERP – SAP --- Enterpri Resource Planning / System Application Product in Process: 企业资源规划及生产应用管制操作系统
25. SFC --- Shop Floor Control: 现场车间管制操作系统
26. MOQ --- Minimum Order Quantity: 最小订购量
27. MSQ --- Maximum Supply Quantity: 最大供应量
28. Where U Report: 零件共同使用报表
28. Where U Report: 零件共同使用报表
29. EXW-EX Works: 工厂交货价
30. RTV- Return to vendor: 退货
31.RMA-Return Material Approval 退货验收
32.ETA-Estimated Time of Arrival 预计到港时间
33.ETD-Estimated Time of Departure 预计离港时间