IRREVOCABLE DOCUMENTARY CREDIT APPLICATION | ||||||
To: | HSBC BANK BANGLADESH | Date: | AUG 20,2013 | |||
Issue by airmail With brief advice by teletransmission | Credit No. | |||||
Issue by express delivery | ||||||
( v )Issue by teletransmission (which shall be the operative instrument) | Date and place of expiry | 24th Oct, 2013 IN COUNTRY OF BENEFICIARY | ||||
Applicant | Beneficiary (Full name and address) | |||||
M/S. MEMORY STEEL CORPORATION. | JIANGSU I-TOUCH BUSINESS SERVICE LTD | |||||
Advising Bank | Amount | |||||
USD 35000.00 U.S DOLLARS THIRTY FIVE THOUSAND ONLY. | ||||||
Credit available with | ||||||
Partial shipments | Transshipment | ANY BANK | ||||
( v )allowed not allowed | (v )allowed not allowed | By | ||||
Loading on board/dispatch/taking in charge at/from | sight payment acceptance (v) negotiation | |||||
any Chine port cancer | ||||||
deferred payment at | ||||||
not later than | 9th Oct, 2013 | against the documents detailed herein | ||||
For transportation To: | ( )and beneficiary's draft(s) for 100 % of invoice value | |||||
FOB ( V )CFR CIF | at **** sight | |||||
or other terms | drawn on ISSUING BANK | |||||
Documents required: (marked with X) | ||||||
1. ( X ) Signed commercial invoice in 3 copies indicating L/C No. and Contract No. | ||||||
2. ( Xmalaysian ) Full t of clean on board Bills of Lading made out To order and blank endord, marked "freight [ ] To collect / [ ] | ||||||
prepaid [ ] showing freight amount" notifying . | ||||||
( ) Airway bills/cargo receipt/copy of railway bills issued by showing “freight [ ] To collect/[ ] prepaid [ ] indicating freight amount" and consigned To____________________________. | ||||||
3. ( ) Insurance Policy/Certificate in dave matthews band copies for % of the invoice value showing claims payable in in | ||||||
currency of the draft, blank endord, covering All Risks and . | ||||||
4. ( X ) Packing List/Weight Memo in 3 copies indicating quantity, gross and weights of each package. | ||||||
5. ( ) Certificate of Quantity/Weight in copies issued by __________________. | ||||||
6. ( ) Certificate of Quality in copies issued by [ ] manufacturer/[ ] public recognized surveyor_________________. | ||||||
7. ( X ) Certificate of Origin in 3 copies . | ||||||
8. ( X ) Beneficiary's certified copy of fax / telex dispatched To the applicant within 15 days after shipment advising L/C No., name of vesl, date of shipment, name, quantity, weight and value of goods. | ||||||
( )Other documents, if any | ||||||
Description of goods: | ||||||
201/2B SECONDARY GRADE STAINLESS STEEL | ||||||
Additional instructions: | ||||||
1. ( X ) All banking charges outside the opening bank are for beneficiary's account. | 中国教育考试在线网||||||
2. ( X ) Documents must be prented within 15 days after date of issuance of the transport documents but within the validity | ||||||
of this credit. | ||||||
3. ( ) Third party as shipper is not acceptable, Short Form/Blank back B/L is not acceptable. | ||||||
4. ( X ) Both quantity and credit amount __10_ ___ % more or less are allowed. | ||||||
5. ( X ) All documents must be nt To issuing bank by courier/speed post in one lot. | ||||||
( ) Other terms, if any | ||||||
形容词顺序 |
IRREVOCABLE DOCUMENTARY CREDIT APPLICATION | ||||||
To: | HSBC BANK AUSTRALIA | Date: | JUL 05, 2013 | |||
Issue by airmail With brief advice by teletransmission | Credit No. | |||||
Issue by express delivery | ||||||
(v)Issue by teletransmission (which shall be the operative instrument) | Date and place of expiry | Jul 30,2013 | ||||
Applicant | Beneficiary (Full name and address) | |||||
CONSTRUCTION MOUDULAR SPECIALIST POSTAL: 13 HARVEY RD., SHENTON PK, WA 6008 AUSTRALIA | PRIMA CONSTRUCTION MATERIOLS CO., LTD 1401 ROOM, 38 BUILDING, CHUANGYE GARDEN BAOAN DISTRICT, SHENZHEN, CHINA | |||||
Advising Bank | Amount | |||||
USD 5950 U.S DOLLARS FIFTY NINE HUNDRED AND FIFTY ONLY. | ||||||
Credit available with | ||||||
pasteurizedPartial shipments | Transshipment | ANY BANK | ||||
(V )allowed not allowed | (V )allowed not allowed | By | ||||
Loading on board/dispatch/taking in charge at/from | sight payment acceptance (V)negotiation | |||||
Shenzhen, China | ||||||
deferred payment at | ||||||
not later than | 5th Sep, 2012 | against the documents detailed herein | ||||
For transportation To: | ( )and beneficiary's draft(s) for 100 % of invoice value | |||||
FOB CFR CIF | at *** sight | |||||
or other terms | drawn on ISSUING BANK | |||||
Documents required: (marked with X) | ||||||
1. ( X ) Signed commercial invoice in 4 copies indicating L/C No. and Contract No. | ||||||
2. ( X ) Full t of clean on board Bills of Lading made out To order and blank endord, marked "freight [ ] To collect / [ V ] | ||||||
prepaid [ ] showing freight amount" notifying APPLICANT . | ||||||
( ) Airway bills/cargo receipt/copy of railway bills issued by showing “freight [ ] To collect/[ ] prepaid [ ] indicating freight amount" and consigned To____________________________. | ||||||
3. ( X ) Insurance Policy/Certificate in 4 copies for 110 % of the invoice value showing claims payable in AUSTRALIA in | ||||||
currency of the draft, blank endord, covering All Risks and ICC(War Risk) AND ICC(A) risk . | ||||||
4. ( X ) Packing List/Weight Memo in 5 copies indicating quantity, gross and weights of each package. | ||||||
5. ( ) Certificate of Quantity/Weight in copies issued by __________________. | ||||||
6. ( ) Certificate of Quality in xyto copies issued by [ ] manufacturer/[ ] public recognized surveyor_________________. | ||||||
7. ( X ) Certificate of Origin in 3 copies . | ||||||
8. ( ) Beneficiary's certified copy of fax / telex dispatched To the applicant within days after shipment advising L/C No., name of vesl, date of shipment, name, quantity, weight and value of goods. | ||||||
( )Other documents, if any | ||||||
Description of goods: | ||||||
BAMBOO FLOORING | ||||||
Additional instructions: | ||||||
1. ( X ) All banking charges outside the opening bank are for beneficiary's account. | ||||||
2. ( X ) Documents must be prented within 15 days after date of issuance of the transport documents but within the validity | ||||||
of this credit. | ||||||
3. ( ) Third party as shipper is not acceptable, Short Form/Blank back B/L is not acceptable. | ||||||
bullfrog |
本文发布于:2023-07-21 22:20:51,感谢您对本站的认可!
本文链接:https://www.wtabcd.cn/fanwen/fan/78/1109692.html
版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。
留言与评论(共有 0 条评论) |